Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
A.V. VESELOV(S PILE AND METHOD OF ITS CONSTRUCTION
FIELD: construction.SUBSTANCE: invention can be used in designs of piles intended for the arrangement of pile foundations and methods of construction of such piles. The pile consists of one leading (1) and multiple line (2) pile elements of an identical length and broadenings (3) around the line (2) elements. The leading (1) and line (2) elements consist of cylindrical upper parts (5) with an identical diameter and of lower parts (6) in the form truncated cones. The leading (1) element is fitted with a tubular element (7) which is coaxially protruding from the upper base of its cylindrical part (5). The line (2) elements have internal longitudinal coaxial cylindrical channels (8) for the accommodation of a guiding pipe (9). For the construction of the pile a well which is pre-drilled in the ground is filled with a ground-cementing solution, then the leading pile element is lowered into it up down to the required depth. A portion of a cement-and-sand solution is added into the well, the first line pile element is lowered until its installation on the leading pile element. The second and the subsequent line pile elements are lowered into the well until installation on the previous line pile element with adding into the well of a portion of the cement-and-sand solution before lowering of each line pile element until the achievement of the required pile length.EFFECT: pile and the method of its construction provide unification of lengths of the components of the pile body, increase of the level of the ground compaction at the construction of the piles, improvement of the adhesion of the pile surface with the surrounding ground and increase of the bearing area of the pile on the soil base due to the fabrication of the pile consisting of the leading and line pile elements of the identical length and broadenings from the cement-and-sand mix around the line pile elements.10 cl, 7 dwg
Изобретение может быть использовано в конструкциях свай, предназначенных для устройства свайных фундаментов, и способах возведения таких свай. Свая состоит из лидирующего (1) и рядовых (2) свайных элементов одинаковой длины и уширений (3) вокруг рядовых (2) элементов. Лидирующий (1) и рядовые (2) элементы состоят из цилиндрических верхних частей (5) одинакового диаметра и нижних частей (6) в виде усеченных конусов. Лидирующий (1) элемент снабжен трубчатым элементом (7), соосно выступающим из верхнего основания его цилиндрической части (5). Рядовые (2) элементы имеют внутренние продольные соосные цилиндрические каналы (8) для размещения направляющей трубы (9). Для возведения сваи предварительно пробуренную в грунте скважину заполняют грунтоукрепляющим раствором, погружают в нее до необходимой глубины лидирующий свайный элемент. Вводят в скважину порцию цементно-песчаного раствора, осуществляют погружение первого рядового свайного элемента до установки его на лидирующий свайный элемент. Выполняют погружение в скважину второго и последующих рядовых свайных элементов до установки на предыдущий рядовой свайный элемент с введением в скважину порции цементно-песчаного раствора перед погружением каждого рядового свайного элемента до достижения необходимой длины сваи. Свая и способ ее возведения обеспечивают унификацию длин составных частей тела сваи, повышение степени уплотнения грунта при возведении сваи, улучшение сцепления поверхности сваи с окружающим грунтом и увеличение площади опоры сваи на грунтовое основание за счет выполнения сваи состоящей из лидирующего и рядовых свайных элементов одинаковой длины и ушир
A.V. VESELOV(S PILE AND METHOD OF ITS CONSTRUCTION
FIELD: construction.SUBSTANCE: invention can be used in designs of piles intended for the arrangement of pile foundations and methods of construction of such piles. The pile consists of one leading (1) and multiple line (2) pile elements of an identical length and broadenings (3) around the line (2) elements. The leading (1) and line (2) elements consist of cylindrical upper parts (5) with an identical diameter and of lower parts (6) in the form truncated cones. The leading (1) element is fitted with a tubular element (7) which is coaxially protruding from the upper base of its cylindrical part (5). The line (2) elements have internal longitudinal coaxial cylindrical channels (8) for the accommodation of a guiding pipe (9). For the construction of the pile a well which is pre-drilled in the ground is filled with a ground-cementing solution, then the leading pile element is lowered into it up down to the required depth. A portion of a cement-and-sand solution is added into the well, the first line pile element is lowered until its installation on the leading pile element. The second and the subsequent line pile elements are lowered into the well until installation on the previous line pile element with adding into the well of a portion of the cement-and-sand solution before lowering of each line pile element until the achievement of the required pile length.EFFECT: pile and the method of its construction provide unification of lengths of the components of the pile body, increase of the level of the ground compaction at the construction of the piles, improvement of the adhesion of the pile surface with the surrounding ground and increase of the bearing area of the pile on the soil base due to the fabrication of the pile consisting of the leading and line pile elements of the identical length and broadenings from the cement-and-sand mix around the line pile elements.10 cl, 7 dwg
Изобретение может быть использовано в конструкциях свай, предназначенных для устройства свайных фундаментов, и способах возведения таких свай. Свая состоит из лидирующего (1) и рядовых (2) свайных элементов одинаковой длины и уширений (3) вокруг рядовых (2) элементов. Лидирующий (1) и рядовые (2) элементы состоят из цилиндрических верхних частей (5) одинакового диаметра и нижних частей (6) в виде усеченных конусов. Лидирующий (1) элемент снабжен трубчатым элементом (7), соосно выступающим из верхнего основания его цилиндрической части (5). Рядовые (2) элементы имеют внутренние продольные соосные цилиндрические каналы (8) для размещения направляющей трубы (9). Для возведения сваи предварительно пробуренную в грунте скважину заполняют грунтоукрепляющим раствором, погружают в нее до необходимой глубины лидирующий свайный элемент. Вводят в скважину порцию цементно-песчаного раствора, осуществляют погружение первого рядового свайного элемента до установки его на лидирующий свайный элемент. Выполняют погружение в скважину второго и последующих рядовых свайных элементов до установки на предыдущий рядовой свайный элемент с введением в скважину порции цементно-песчаного раствора перед погружением каждого рядового свайного элемента до достижения необходимой длины сваи. Свая и способ ее возведения обеспечивают унификацию длин составных частей тела сваи, повышение степени уплотнения грунта при возведении сваи, улучшение сцепления поверхности сваи с окружающим грунтом и увеличение площади опоры сваи на грунтовое основание за счет выполнения сваи состоящей из лидирующего и рядовых свайных элементов одинаковой длины и ушир
A.V. VESELOV(S PILE AND METHOD OF ITS CONSTRUCTION
СВАЯ ВЕСЕЛОВА А.В. И СПОСОБ ЕЕ ВОЗВЕДЕНИЯ
VESELOV ALEKSANDR VASIL EVICH (Autor:in)
27.07.2015
Patent
Elektronische Ressource
Russisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
PILE CONSTRUCTION DEVICE, PILE CONSTRUCTION METHOD AND PILE
Europäisches Patentamt | 2015
|Europäisches Patentamt | 2018
|Relationship between symmetries of the Tzitzéica equation and the Novikov-Veselov Hierarchy
British Library Online Contents | 2007
|