Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
METHOD OF FLOATING BOOM
FIELD: ecology; construction.SUBSTANCE: invention relates to ecology, particularly to hydrotechnical structures designed for enclosing section of water surface in order to prevent spreading of oil and oil products. Lifting of floating boom, consisting of elastic sections forming total inner space of shell is performed by sequential lifting sections, starting with first section 1 by first front end section 1 is pulled out from bottom to water surface and fixed with help of winch 2 at depth h, and then from compressor 3 in section 1 is supplied compressed gas under pressure P=0.1h. Section 1 acquires volume which generates pushing force which lifts rear end section on surface of water body and tightens at depth h front end of second section 1, in which begins inlet of compressed gas. And so on in series to last section 1, end of which is fixed on a certain depth from water surface by means of load. Flooding of enclosure is performed after discharge of working pressure series, but in reverse order, that is, starting from last section.EFFECT: higher durability of floating boom by reducing pressure of compressed gas required for its lifting.1 cl, 2 dwg
Изобретение относится к области экологии, в частности к гидротехническим сооружениям, предназначенным для ограждения участка водной поверхности с целью предотвращения растекания нефти и нефтепродуктов. Подъем бонового заграждения, состоящего из эластичных секций, образующих общее внутреннее пространство оболочки, осуществляют путем последовательного подъема секций, начиная с первой секции 1, для чего сначала передний конец секции 1 подтягивают со дна к поверхности водоема и фиксируют с помощью лебедки 2 на глубине h, а затем от компрессора 3 в секцию 1 подают сжатый газ под давлением P=0,1h. Секция 1 приобретает объем, создающий силу выталкивания, которая поднимает задний конец секции на поверхность водоема и подтягивает на глубину h передний конец второй секции 1, в которую начинает поступать сжатый газ. И так далее, последовательно до последней секции 1, конец которой фиксируют на некоторой глубине от поверхности водоема с помощью груза. Затопление заграждения производится после сброса рабочего давления также последовательно, но в обратном порядке, т.е. начиная с последней секции. Повышается долговечность бонового заграждения путем снижения давления сжатого газа, необходимого для его подъема. 2 ил.
METHOD OF FLOATING BOOM
FIELD: ecology; construction.SUBSTANCE: invention relates to ecology, particularly to hydrotechnical structures designed for enclosing section of water surface in order to prevent spreading of oil and oil products. Lifting of floating boom, consisting of elastic sections forming total inner space of shell is performed by sequential lifting sections, starting with first section 1 by first front end section 1 is pulled out from bottom to water surface and fixed with help of winch 2 at depth h, and then from compressor 3 in section 1 is supplied compressed gas under pressure P=0.1h. Section 1 acquires volume which generates pushing force which lifts rear end section on surface of water body and tightens at depth h front end of second section 1, in which begins inlet of compressed gas. And so on in series to last section 1, end of which is fixed on a certain depth from water surface by means of load. Flooding of enclosure is performed after discharge of working pressure series, but in reverse order, that is, starting from last section.EFFECT: higher durability of floating boom by reducing pressure of compressed gas required for its lifting.1 cl, 2 dwg
Изобретение относится к области экологии, в частности к гидротехническим сооружениям, предназначенным для ограждения участка водной поверхности с целью предотвращения растекания нефти и нефтепродуктов. Подъем бонового заграждения, состоящего из эластичных секций, образующих общее внутреннее пространство оболочки, осуществляют путем последовательного подъема секций, начиная с первой секции 1, для чего сначала передний конец секции 1 подтягивают со дна к поверхности водоема и фиксируют с помощью лебедки 2 на глубине h, а затем от компрессора 3 в секцию 1 подают сжатый газ под давлением P=0,1h. Секция 1 приобретает объем, создающий силу выталкивания, которая поднимает задний конец секции на поверхность водоема и подтягивает на глубину h передний конец второй секции 1, в которую начинает поступать сжатый газ. И так далее, последовательно до последней секции 1, конец которой фиксируют на некоторой глубине от поверхности водоема с помощью груза. Затопление заграждения производится после сброса рабочего давления также последовательно, но в обратном порядке, т.е. начиная с последней секции. Повышается долговечность бонового заграждения путем снижения давления сжатого газа, необходимого для его подъема. 2 ил.
METHOD OF FLOATING BOOM
СПОСОБ ПОДЪЕМА БОНОВОГО ЗАГРАЖДЕНИЯ
MIKHALEV VIKTOR VLADIMIROVICH (Autor:in)
27.08.2016
Patent
Elektronische Ressource
Russisch
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau