ERECTION METHOD OF BATTER DRAINAGE EARTH STRUCTURES
FIELD: construction.SUBSTANCE: invention relates to drainage devices and can be used for protection of local slopes of earth dams and dams banking from possible filtration deformations of their soil at the outlet of filtration flow. Batter drainage on slope is made from previously prepared gabion mattresses 1 prefabricated structure width 0.3-0.5 m, thickness of 0.2-0.4 m and length of up to 2 m and the underlying layer 5 of light fascines 2. Underlying layer 5 of light fascines 2 in the base and gabion mattresses 1 from above them are connected together by zinc-plated metal wire. Along the upper row mattresses 1 with deepening in slope are laid heavy mattresses of bags 6 with local and plant soil tightly connected to each other and with the gabion mattresses 1 on slope. In the bottom of the drainage in the tail bay above said gabion mattresses 1 is arranged gravel or gravel-pebbly filling 7. Effectiveness of the construction and efficiency of drainage device is increased.EFFECT: batter drainage, arranged with the proposed method, the most effective can be used in difficult conditions of rivers at their flat and submountain sections, where erected low-pressure earthing dams and dams of fine sand and clay soils.1 cl, 4 dwg
Изобретение относится к дренажным устройствам и может быть использовано для защиты низовых откосов земляных плотин и дамб обвалования от возможных фильтрационных деформаций их грунтов на выходе фильтрационного потока. Наслонный дренаж на откосе выполняют из заранее заготовленных габионных тюфяков 1 сборной конструкции шириной 0,3-0,5 м, толщиной 0,2-0,4 м и длиной до 2 м и подстилающего слоя 5 из легких фашин 2. Подстилающий слой 5 из легких фашин 2 в основании и габионные тюфяки 1 сверху них связывают между собой оцинкованной металлической проволокой. Вдоль верхнего ряда тюфяков 1 с заглублением в откос укладывают тяжелые тюфяки из мешков 6 с местным и растительным грунтом, прочно связанными между собой и с габионными тюфяками 1 на откосе. У подошвы дренажа в нижнем бьефе сверху габионных тюфяков 1 устраивают гравийную или гравийно-галечниковую засыпку 7 . Повышается технологичность возведения и эффективность дренажного устройства. Наслонный дренаж, возведенный предлагаемым способом, наиболее эффективно может быть использован в труднодоступных условиях рек на их равнинных и предгорных участках, где возводятся низконапорные земляные плотины и дамбы из мелкопесчаных и глинистых грунтов. 4 ил.
ERECTION METHOD OF BATTER DRAINAGE EARTH STRUCTURES
FIELD: construction.SUBSTANCE: invention relates to drainage devices and can be used for protection of local slopes of earth dams and dams banking from possible filtration deformations of their soil at the outlet of filtration flow. Batter drainage on slope is made from previously prepared gabion mattresses 1 prefabricated structure width 0.3-0.5 m, thickness of 0.2-0.4 m and length of up to 2 m and the underlying layer 5 of light fascines 2. Underlying layer 5 of light fascines 2 in the base and gabion mattresses 1 from above them are connected together by zinc-plated metal wire. Along the upper row mattresses 1 with deepening in slope are laid heavy mattresses of bags 6 with local and plant soil tightly connected to each other and with the gabion mattresses 1 on slope. In the bottom of the drainage in the tail bay above said gabion mattresses 1 is arranged gravel or gravel-pebbly filling 7. Effectiveness of the construction and efficiency of drainage device is increased.EFFECT: batter drainage, arranged with the proposed method, the most effective can be used in difficult conditions of rivers at their flat and submountain sections, where erected low-pressure earthing dams and dams of fine sand and clay soils.1 cl, 4 dwg
Изобретение относится к дренажным устройствам и может быть использовано для защиты низовых откосов земляных плотин и дамб обвалования от возможных фильтрационных деформаций их грунтов на выходе фильтрационного потока. Наслонный дренаж на откосе выполняют из заранее заготовленных габионных тюфяков 1 сборной конструкции шириной 0,3-0,5 м, толщиной 0,2-0,4 м и длиной до 2 м и подстилающего слоя 5 из легких фашин 2. Подстилающий слой 5 из легких фашин 2 в основании и габионные тюфяки 1 сверху них связывают между собой оцинкованной металлической проволокой. Вдоль верхнего ряда тюфяков 1 с заглублением в откос укладывают тяжелые тюфяки из мешков 6 с местным и растительным грунтом, прочно связанными между собой и с габионными тюфяками 1 на откосе. У подошвы дренажа в нижнем бьефе сверху габионных тюфяков 1 устраивают гравийную или гравийно-галечниковую засыпку 7 . Повышается технологичность возведения и эффективность дренажного устройства. Наслонный дренаж, возведенный предлагаемым способом, наиболее эффективно может быть использован в труднодоступных условиях рек на их равнинных и предгорных участках, где возводятся низконапорные земляные плотины и дамбы из мелкопесчаных и глинистых грунтов. 4 ил.
ERECTION METHOD OF BATTER DRAINAGE EARTH STRUCTURES
СПОСОБ ВОЗВЕДЕНИЯ НАСЛОННОГО ДРЕНАЖА ЗЕМЛЯНЫХ СООРУЖЕНИЙ
KURBANOV SALIGADZHI OMAROVICH (Autor:in) / APAZHEV ASLAN KARALBIEVICH (Autor:in)
10.11.2016
Patent
Elektronische Ressource
Russisch
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
ERECTION METHOD OF COMBINED DRAINAGE EARTH STRUCTURES
Europäisches Patentamt | 2016
|Batter-pile tension retains earth walls
Engineering Index Backfile | 1965
BATTER PILE INSTALLATION CRADLE AND BATTER PILE INSTALLATION METHOD
Europäisches Patentamt | 2021
|BATTER BOARD PLACEMENT METHOD, BATTER BOARD PLACEMENT PROGRAM, AND SURVEY SYSTEM
Europäisches Patentamt | 2022
|