METHOD FOR CONSTRUCTION OF UNDERGROUND MULTISTOREY BUILDINGS
FIELD: construction.SUBSTANCE: invention relates to construction, specifically to methods of erection of multi-storey underground structures of different purpose by open method, and can be used in industrial construction. Method for construction of underground multi-storey building includes erection of frame structure and installation of pile supports, successive concreting on soil surface of intermediate floors, suspension floors to head parts of supports, development of trench by soil excavation under covering, further lowering of floors along supports throughout height of trench to a height, which corresponds to one phase ground excavation, and fixation of floors on supports. First, along outline of future concrete wall are installed separately standing vertical bored piles-supports, which are then fixed in upper part by horizontal cross-beams to form a frame, and electrohydraulic jacks are installed on them between piles. On soil surface, concreting is carried out in steps at two overlapping in form of round plates along outline of future concrete wall vertical and horizontal formwork, reinforced crossbars, to which there are steel rods, for concreting walls, which is performed by dropping concrete. Between formed concrete wall and fixed stiffeners retained by screw piles, to a concrete wall is suspended gas-inflated rubber-steel cushions with rollers to facilitate sliding down concrete walls, removing soil under formed plates covering, lowering using electrohydraulic jacks. Space between upper and second plate under it is filled with armoured metal hollow spheres, in some of which air is pumped at maximum possible pressure, and in other part a vacuum is created. Lowering of plate and lowering of concrete to form a concrete wall is performed simultaneously. Wall formed after soil excavation at an angle of 25-30° to horizontal is drilled with intended for fastening of steel reinforcement ribs, additional boards metal screw piles, which are additional, have length of 5-10 m and are made with through lengthwise holes for injection under pressure of concrete mix after their connection to each other.EFFECT: technical result consists in simplification of method while providing its safety.1 cl, 2 dwg
Изобретение относится к области строительства, а именно к способам возведения многоэтажных подземных сооружений различного назначения открытым способом, и может использоваться в промышленном строительстве. Способ строительства подземного многоэтажного сооружения включает возведение каркаса сооружения и установку свайных опор, последовательное бетонирование на поверхности грунта междуэтажных перекрытий, подвешивание перекрытий к головным частям опор, разработку котлована путем выемки грунта под перекрытием, последующее опускание перекрытий вдоль опор на всю высоту котлована на высоту, которая соответствует одному этапу выемки грунта, и закрепление перекрытий на опорах. Вначале по контуру будущей бетонной стены устанавливают отдельно стоящие вертикальные буронабивные сваи-опоры, которые затем скрепляют в верхней части горизонтальными ригелями-балками, формируя каркас, и устанавливают на них между сваями электрогидравлические домкраты. На поверхности грунта бетонируют поэтапно по два перекрытия в виде круглых плит, по контуру будущей бетонной стены устанавливают вертикальную и горизонтальную опалубку, усиленную ригелями, к которым закреплены стальные стержни, для бетонирования стены, которую производят способом опускающегося бетона. Между образуемой бетонной стеной и закрепленными ребрами жесткости, удерживаемыми винтовыми сваями, к бетонной стене навешивают накачанные газом резино-стальные подушки с роликами для облегчения скольжения вниз бетонной стены, вынимают грунт под сформированными плитами перекрытия, опускают их с помощью электрогидравлических домкратов. Пространство между
METHOD FOR CONSTRUCTION OF UNDERGROUND MULTISTOREY BUILDINGS
FIELD: construction.SUBSTANCE: invention relates to construction, specifically to methods of erection of multi-storey underground structures of different purpose by open method, and can be used in industrial construction. Method for construction of underground multi-storey building includes erection of frame structure and installation of pile supports, successive concreting on soil surface of intermediate floors, suspension floors to head parts of supports, development of trench by soil excavation under covering, further lowering of floors along supports throughout height of trench to a height, which corresponds to one phase ground excavation, and fixation of floors on supports. First, along outline of future concrete wall are installed separately standing vertical bored piles-supports, which are then fixed in upper part by horizontal cross-beams to form a frame, and electrohydraulic jacks are installed on them between piles. On soil surface, concreting is carried out in steps at two overlapping in form of round plates along outline of future concrete wall vertical and horizontal formwork, reinforced crossbars, to which there are steel rods, for concreting walls, which is performed by dropping concrete. Between formed concrete wall and fixed stiffeners retained by screw piles, to a concrete wall is suspended gas-inflated rubber-steel cushions with rollers to facilitate sliding down concrete walls, removing soil under formed plates covering, lowering using electrohydraulic jacks. Space between upper and second plate under it is filled with armoured metal hollow spheres, in some of which air is pumped at maximum possible pressure, and in other part a vacuum is created. Lowering of plate and lowering of concrete to form a concrete wall is performed simultaneously. Wall formed after soil excavation at an angle of 25-30° to horizontal is drilled with intended for fastening of steel reinforcement ribs, additional boards metal screw piles, which are additional, have length of 5-10 m and are made with through lengthwise holes for injection under pressure of concrete mix after their connection to each other.EFFECT: technical result consists in simplification of method while providing its safety.1 cl, 2 dwg
Изобретение относится к области строительства, а именно к способам возведения многоэтажных подземных сооружений различного назначения открытым способом, и может использоваться в промышленном строительстве. Способ строительства подземного многоэтажного сооружения включает возведение каркаса сооружения и установку свайных опор, последовательное бетонирование на поверхности грунта междуэтажных перекрытий, подвешивание перекрытий к головным частям опор, разработку котлована путем выемки грунта под перекрытием, последующее опускание перекрытий вдоль опор на всю высоту котлована на высоту, которая соответствует одному этапу выемки грунта, и закрепление перекрытий на опорах. Вначале по контуру будущей бетонной стены устанавливают отдельно стоящие вертикальные буронабивные сваи-опоры, которые затем скрепляют в верхней части горизонтальными ригелями-балками, формируя каркас, и устанавливают на них между сваями электрогидравлические домкраты. На поверхности грунта бетонируют поэтапно по два перекрытия в виде круглых плит, по контуру будущей бетонной стены устанавливают вертикальную и горизонтальную опалубку, усиленную ригелями, к которым закреплены стальные стержни, для бетонирования стены, которую производят способом опускающегося бетона. Между образуемой бетонной стеной и закрепленными ребрами жесткости, удерживаемыми винтовыми сваями, к бетонной стене навешивают накачанные газом резино-стальные подушки с роликами для облегчения скольжения вниз бетонной стены, вынимают грунт под сформированными плитами перекрытия, опускают их с помощью электрогидравлических домкратов. Пространство между
METHOD FOR CONSTRUCTION OF UNDERGROUND MULTISTOREY BUILDINGS
СПОСОБ СТРОИТЕЛЬСТВА ПОДЗЕМНОГО МНОГОЭТАЖНОГО СООРУЖЕНИЯ
KHAFIZOV TAGIR MAVLITOVICH (Autor:in) / BAJBURIN ALBERT KHALIDOVICH (Autor:in) / DENISOV SERGEJ EGOROVICH (Autor:in) / KHAFIZOV GLEB TAGIROVICH (Autor:in)
10.12.2016
Patent
Elektronische Ressource
Russisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Dynamic insulation in multistorey buildings
British Library Online Contents | 1999
|Torsional Provisions for Asymmetrical Multistorey Buildings
British Library Conference Proceedings | 1994
|Multistorey Timber Buildings in Sweden
British Library Conference Proceedings | 1994
|Solar technology in multistorey buildings
British Library Conference Proceedings | 1994
|Fire safety of multistorey timber buildings
Online Contents | 2010
|