METHOD OF ERECTING MONOLITHIC PRESTRESSED REINFORCED CONCRETE FRAMEWORK OF MULTI-SECTION BUILDING
FIELD: construction.SUBSTANCE: method for erecting a monolithic prestressed framework includes the installation of the vertical formwork of columns and the horizontal formwork of a flooring, the layout of non-pretensioned reinforcement, the layout of pretensioned cable reinforcement arranged in channel formers and embedded parts for the entire building length, concreting the columns and the floor, pulling the cable reinforcement mechanically onto the concrete and fixing it along the floor ends. Between the sections of the building, paired columns are erected with forming expansion joints between them. After the concrete gains strength, the channel former between the paired columns in the expansion joints is removed from the reinforcement, temporary spacers are installed, and anchor devices with thrust plates are put on the cable reinforcement. Thereinafter, the reinforcement is tensioned with anchoring it with the abutment on the extreme and paired columns, after which the cable reinforcement in the expansion joints is cut, and the temporary spacers are dismantled.EFFECT: technology simplification.8 dwg
Изобретение относится к способу возведения монолитного предварительно напряженного железобетонного каркаса многосекционного здания. Технический результат изобретения заключается в упрощении технологии возведения монолитного каркаса. Способ возведения монолитного предварительно напряженного каркаса включает монтаж вертикальной опалубки колонн и горизонтальной опалубки перекрытия, раскладку ненапрягаемой арматуры, раскладку на всю длину здания напрягаемой канатной арматуры, размещенной в каналообразователях, и закладных деталей, бетонирование колонн и перекрытия, распалубку после набора бетоном распалубочной прочности, натяжение канатной арматуры механическим способом на бетон и фиксирование ее по торцам перекрытия. Между секциями здания возводят спаренные колонны с образованием между ними деформационных швов. После набора бетоном прочности между спаренными колоннами в деформационных швах снимают с арматуры каналообразователь, устанавливают временные распорки и на канатную арматуру надевают анкерные устройства с упорными пластинами, после этого производят натяжение арматуры с заанкериванием ее с упором на крайние и спаренные колонны, после чего канатную арматуру в деформационных швах разрезают и демонтируют временные распорки. 8 ил.
METHOD OF ERECTING MONOLITHIC PRESTRESSED REINFORCED CONCRETE FRAMEWORK OF MULTI-SECTION BUILDING
FIELD: construction.SUBSTANCE: method for erecting a monolithic prestressed framework includes the installation of the vertical formwork of columns and the horizontal formwork of a flooring, the layout of non-pretensioned reinforcement, the layout of pretensioned cable reinforcement arranged in channel formers and embedded parts for the entire building length, concreting the columns and the floor, pulling the cable reinforcement mechanically onto the concrete and fixing it along the floor ends. Between the sections of the building, paired columns are erected with forming expansion joints between them. After the concrete gains strength, the channel former between the paired columns in the expansion joints is removed from the reinforcement, temporary spacers are installed, and anchor devices with thrust plates are put on the cable reinforcement. Thereinafter, the reinforcement is tensioned with anchoring it with the abutment on the extreme and paired columns, after which the cable reinforcement in the expansion joints is cut, and the temporary spacers are dismantled.EFFECT: technology simplification.8 dwg
Изобретение относится к способу возведения монолитного предварительно напряженного железобетонного каркаса многосекционного здания. Технический результат изобретения заключается в упрощении технологии возведения монолитного каркаса. Способ возведения монолитного предварительно напряженного каркаса включает монтаж вертикальной опалубки колонн и горизонтальной опалубки перекрытия, раскладку ненапрягаемой арматуры, раскладку на всю длину здания напрягаемой канатной арматуры, размещенной в каналообразователях, и закладных деталей, бетонирование колонн и перекрытия, распалубку после набора бетоном распалубочной прочности, натяжение канатной арматуры механическим способом на бетон и фиксирование ее по торцам перекрытия. Между секциями здания возводят спаренные колонны с образованием между ними деформационных швов. После набора бетоном прочности между спаренными колоннами в деформационных швах снимают с арматуры каналообразователь, устанавливают временные распорки и на канатную арматуру надевают анкерные устройства с упорными пластинами, после этого производят натяжение арматуры с заанкериванием ее с упором на крайние и спаренные колонны, после чего канатную арматуру в деформационных швах разрезают и демонтируют временные распорки. 8 ил.
METHOD OF ERECTING MONOLITHIC PRESTRESSED REINFORCED CONCRETE FRAMEWORK OF MULTI-SECTION BUILDING
СПОСОБ ВОЗВЕДЕНИЯ МОНОЛИТНОГО ПРЕДВАРИТЕЛЬНО НАПРЯЖЕННОГО ЖЕЛЕЗОБЕТОННОГО КАРКАСА МНОГОСЕКЦИОННОГО ЗДАНИЯ
GULADZE TEJMURIZ ILICH (Autor:in)
10.10.2017
Patent
Elektronische Ressource
Russisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
METHOD OF ERECTING PREFABRICATED PRESTRESSED REINFORCED CONCRETE FRAMEWORK OF MULTI-SECTION BUILDING
Europäisches Patentamt | 2017
|METHOD FOR ERECTING MONOLITHIC REINFORCED CONCRETE STRUCTURES
Europäisches Patentamt | 2017
|METHOD FOR ERECTING LARGE-SPAN MONOLITHIC REINFORCED CONCRETE FLOORINGS
Europäisches Patentamt | 2017
|Europäisches Patentamt | 2020
|Simple equipment used in erecting reinforced concrete hospital building
Engineering Index Backfile | 1928