Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
METHOD OF SEALING THE BASES BROKEN BY WEAK MINERAL SOILS
FIELD: construction.SUBSTANCE: invention relates to construction, in particular to methods for strengthening soils under the foundations and foundations of buildings and structures, incl. objects of electric power industry. Method of compaction of bases composed of weak mineral soils includes making wells, feeding the sealing material to each well, and creating an impact by the hollow tubular working tool on the sealing material to form a ground pile. Preliminary perform geotechnical surveys on the base area and determine the values of the strain modulus, Poisson's ratio, the angle of internal friction, the specific cohesion, the specific gravity, the initial porosity coefficient of the weak mineral soil, set the required design modulus of deformation of the compaction soil layer, then, taking value εdeformation expansion of each well is equal to 0.1, calculate the porosity coefficient of the weak mineral soil after compaction around the soil pile eaccording to the given dependence. Determine at each step the predicted value of the flow index of a weak mineral soil according to the given dependence. Then, according to the known normative values, the nearest preliminary value of the strain modulus Esurrounding a ground pile of mineral soil depending on the obtained values of the porosity coefficient of the weak mineral soil after compaction around the pile eand soil flow index after compaction I, then take the step of placing the ground piles equal to three diameters of the hollow tubular working tool and determine the value of the actual average reduced modulus of the base deformation according to the reduced dependence. It is compared with the design deformation module of mineral soil, and, in the case of obtaining a smaller actual average reduced modulus of ground deformation than the design, increase value εdeformation expansion of the well iteratively with a step of 0.1 and the calculation of the actual average reduced modulus of the base deformation is repeated until the design value or step of placing the ground piles is equal to the value of 1.5 of the diameter of the hollow tubular working tool. Increase in the radius of the well corresponding to the value of the accepted deformation of the expansion during the indentation is calculated from the given dependence. Length of the soil pile is taken to be equal to the distance from the roof to the sole of at least one layer requiring compaction. Then a well is made corresponding to the length of the soil pile by piercing a hollow tubular working tool, feeding the sealing material into the borehole is carried out through the cavity of the hollow tubular working tool, and the sealing action to form the ground pile is effected by pressing the hollow tubular working tool into the sealing material, then it is made an additional engineering and geological surveys on the area of the base, determining the modulus of deformation of the compacted mineral soil between the ground piles. Actual average reduced modulus of deformation of the compacted substrate is calculated and compared with the design value, and if the actual mean reduced modulus of the base deformation does not correspond to the design value, additional ground piles are installed between previously installed ones.EFFECT: technical result consists in increasing the productivity of compaction of soil, reducing the material consumption and labor intensity, ensuring the realization of the compaction of the foundation, composed of weak mineral soils, by determining the optimal design parameters of the ground piles throughout the base area.5 cl
Изобретение относится к строительству, в частности к способам укрепления грунтов под основания и фундаменты зданий и сооружений, в т.ч. объектов электроэнергетики. Способ уплотнения оснований, сложенных слабыми минеральными грунтами, включает выполнение скважин, подачу уплотняющего материала в каждую скважину и создание воздействия полым трубчатым рабочим инструментом на уплотняющий материал для образования грунтовой сваи. Предварительно выполняют инженерно-геологические изыскания по площади основания и определяют значения модуля деформации, коэффициента Пуассона, угла внутреннего трения, удельного сцепления, удельного веса, начального коэффициента пористости слабого минерального грунта, задают требуемый проектный модуль деформации уплотняемого слоя грунта, затем, принимая значение εдеформации расширения каждой скважины равным 0.1, вычисляют коэффициент пористости слабого минерального грунта после уплотнения вокруг грунтовой сваи епо приведенной зависимости. Определяют при каждом шаге прогнозное значение индекса текучести слабого минерального грунта по приведенной зависимости. Затем по известным нормативным значениям принимают ближайшее предварительное значение модуля деформацииокружающего грунтовую сваю минерального грунта в зависимости от полученных значений коэффициента пористости слабого минерального грунта после уплотнения вокруг грунтовой сваи eи индекса текучести грунта после уплотнения I, после чего принимают шаг размещения грунтовых свай равным трем диаметрам полого трубчатого рабочего инструмента и определяют значение фактического среднего приведенного модуля деформации основания по приведенной зависимости. Сравнивают его с проектным модулем деформации минерального грунта, и, в случае получения меньшего фактического среднего приведенного модуля деформации грунта основания, чем проектный, увеличивают значение εдеформации расширения скважины итерационно с шагом 0.1 и повторяют вычисление фактического среднего приведенного модуля деформации основания до достижения проектного значения или шага размещения грунтовых свай, равного значению 1,5 диаметра полого трубчатого рабочего инструмента. Увеличение радиуса скважины, соответствующее значению принятой деформации расширения в процессе вдавливания, вычисляют по приведенной зависимости. Длину грунтовой сваи принимают равной расстоянию от кровли до подошвы по меньшей мере одного слоя, требующего уплотнения. Затем выполняют соответствующую длине грунтовой сваи скважину путем вдавливания полого трубчатого рабочего инструмента, подачу уплотняющего материала в скважину осуществляют через полость полого трубчатого рабочего инструмента, а уплотняющее воздействие для образования грунтовой сваи осуществляют вдавливанием полого трубчатого рабочего инструмента в уплотняющий материал, после чего производят дополнительные инженерно-геологические изыскания по площади основания, определяя модуль деформации уплотненного минерального грунта между грунтовыми сваями. Рассчитывают фактический средний приведенный модуль деформации уплотненного основания и сравнивают его с проектным значением, а при несоответствии фактического среднего приведенного модуля деформации основания проектному значению производят установку дополнительных грунтовых свай между ранее установленными. Технический результат состоит в повышении производительности выполнения уплотнения грунта, снижении материалоемкости и трудоемкости, обеспечении реализации уплотнения основания, сложенного слабыми минеральными грунтами, путем определения оптимальных проектных технологических параметров грунтовых свай по всей площади основания. 4 з.п. ф-лы.
METHOD OF SEALING THE BASES BROKEN BY WEAK MINERAL SOILS
FIELD: construction.SUBSTANCE: invention relates to construction, in particular to methods for strengthening soils under the foundations and foundations of buildings and structures, incl. objects of electric power industry. Method of compaction of bases composed of weak mineral soils includes making wells, feeding the sealing material to each well, and creating an impact by the hollow tubular working tool on the sealing material to form a ground pile. Preliminary perform geotechnical surveys on the base area and determine the values of the strain modulus, Poisson's ratio, the angle of internal friction, the specific cohesion, the specific gravity, the initial porosity coefficient of the weak mineral soil, set the required design modulus of deformation of the compaction soil layer, then, taking value εdeformation expansion of each well is equal to 0.1, calculate the porosity coefficient of the weak mineral soil after compaction around the soil pile eaccording to the given dependence. Determine at each step the predicted value of the flow index of a weak mineral soil according to the given dependence. Then, according to the known normative values, the nearest preliminary value of the strain modulus Esurrounding a ground pile of mineral soil depending on the obtained values of the porosity coefficient of the weak mineral soil after compaction around the pile eand soil flow index after compaction I, then take the step of placing the ground piles equal to three diameters of the hollow tubular working tool and determine the value of the actual average reduced modulus of the base deformation according to the reduced dependence. It is compared with the design deformation module of mineral soil, and, in the case of obtaining a smaller actual average reduced modulus of ground deformation than the design, increase value εdeformation expansion of the well iteratively with a step of 0.1 and the calculation of the actual average reduced modulus of the base deformation is repeated until the design value or step of placing the ground piles is equal to the value of 1.5 of the diameter of the hollow tubular working tool. Increase in the radius of the well corresponding to the value of the accepted deformation of the expansion during the indentation is calculated from the given dependence. Length of the soil pile is taken to be equal to the distance from the roof to the sole of at least one layer requiring compaction. Then a well is made corresponding to the length of the soil pile by piercing a hollow tubular working tool, feeding the sealing material into the borehole is carried out through the cavity of the hollow tubular working tool, and the sealing action to form the ground pile is effected by pressing the hollow tubular working tool into the sealing material, then it is made an additional engineering and geological surveys on the area of the base, determining the modulus of deformation of the compacted mineral soil between the ground piles. Actual average reduced modulus of deformation of the compacted substrate is calculated and compared with the design value, and if the actual mean reduced modulus of the base deformation does not correspond to the design value, additional ground piles are installed between previously installed ones.EFFECT: technical result consists in increasing the productivity of compaction of soil, reducing the material consumption and labor intensity, ensuring the realization of the compaction of the foundation, composed of weak mineral soils, by determining the optimal design parameters of the ground piles throughout the base area.5 cl
Изобретение относится к строительству, в частности к способам укрепления грунтов под основания и фундаменты зданий и сооружений, в т.ч. объектов электроэнергетики. Способ уплотнения оснований, сложенных слабыми минеральными грунтами, включает выполнение скважин, подачу уплотняющего материала в каждую скважину и создание воздействия полым трубчатым рабочим инструментом на уплотняющий материал для образования грунтовой сваи. Предварительно выполняют инженерно-геологические изыскания по площади основания и определяют значения модуля деформации, коэффициента Пуассона, угла внутреннего трения, удельного сцепления, удельного веса, начального коэффициента пористости слабого минерального грунта, задают требуемый проектный модуль деформации уплотняемого слоя грунта, затем, принимая значение εдеформации расширения каждой скважины равным 0.1, вычисляют коэффициент пористости слабого минерального грунта после уплотнения вокруг грунтовой сваи епо приведенной зависимости. Определяют при каждом шаге прогнозное значение индекса текучести слабого минерального грунта по приведенной зависимости. Затем по известным нормативным значениям принимают ближайшее предварительное значение модуля деформацииокружающего грунтовую сваю минерального грунта в зависимости от полученных значений коэффициента пористости слабого минерального грунта после уплотнения вокруг грунтовой сваи eи индекса текучести грунта после уплотнения I, после чего принимают шаг размещения грунтовых свай равным трем диаметрам полого трубчатого рабочего инструмента и определяют значение фактического среднего приведенного модуля деформации основания по приведенной зависимости. Сравнивают его с проектным модулем деформации минерального грунта, и, в случае получения меньшего фактического среднего приведенного модуля деформации грунта основания, чем проектный, увеличивают значение εдеформации расширения скважины итерационно с шагом 0.1 и повторяют вычисление фактического среднего приведенного модуля деформации основания до достижения проектного значения или шага размещения грунтовых свай, равного значению 1,5 диаметра полого трубчатого рабочего инструмента. Увеличение радиуса скважины, соответствующее значению принятой деформации расширения в процессе вдавливания, вычисляют по приведенной зависимости. Длину грунтовой сваи принимают равной расстоянию от кровли до подошвы по меньшей мере одного слоя, требующего уплотнения. Затем выполняют соответствующую длине грунтовой сваи скважину путем вдавливания полого трубчатого рабочего инструмента, подачу уплотняющего материала в скважину осуществляют через полость полого трубчатого рабочего инструмента, а уплотняющее воздействие для образования грунтовой сваи осуществляют вдавливанием полого трубчатого рабочего инструмента в уплотняющий материал, после чего производят дополнительные инженерно-геологические изыскания по площади основания, определяя модуль деформации уплотненного минерального грунта между грунтовыми сваями. Рассчитывают фактический средний приведенный модуль деформации уплотненного основания и сравнивают его с проектным значением, а при несоответствии фактического среднего приведенного модуля деформации основания проектному значению производят установку дополнительных грунтовых свай между ранее установленными. Технический результат состоит в повышении производительности выполнения уплотнения грунта, снижении материалоемкости и трудоемкости, обеспечении реализации уплотнения основания, сложенного слабыми минеральными грунтами, путем определения оптимальных проектных технологических параметров грунтовых свай по всей площади основания. 4 з.п. ф-лы.
METHOD OF SEALING THE BASES BROKEN BY WEAK MINERAL SOILS
СПОСОБ УПЛОТНЕНИЯ ОСНОВАНИЙ, СЛОЖЕННЫХ СЛАБЫМИ МИНЕРАЛЬНЫМИ ГРУНТАМИ
TER-MARTIROSYAN ZAVEN GRIGOREVICH (Autor:in) / TER-MARTIROSYAN ARMEN ZAVENOVICH (Autor:in) / MIRNYJ ANATOLIJ YUREVICH (Autor:in) / SOBOLEV EVGENIJ STANISLAVOVICH (Autor:in) / SIDOROV VITALIJ VALENTINOVICH (Autor:in) / ANZHELO GEORGIJ OLEGOVICH (Autor:in) / LUZIN IVAN NIKOLAEVICH (Autor:in)
31.07.2018
Patent
Elektronische Ressource
Russisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
METHOD FOR COMPACTING BASES LAID USING WEAK MINERAL SOILS
Europäisches Patentamt | 2019
|METHOD FOR COMPACTING BASES FORMED BY WEAK MINERAL SOILS
Europäisches Patentamt | 2018
|METHOD FOR COMPACTING BASES LAID USING WEAK MINERAL SOILS
Europäisches Patentamt | 2023
|METHOD OF COMPACTION OF BASES COMPOSED OF WEAK MINERAL SOILS
Europäisches Patentamt | 2021
|Method of compaction of bases composed of weak mineral soils
Europäisches Patentamt | 2023
|