Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
HOTEL WITH VARIABLE NUMBER OF ROOMS
FIELD: construction.SUBSTANCE: invention relates to the field of modernization of hotels, in particular to modernization of hotel rooms. In the method, the device consists of a space bounded by main walls 1 and front walls 2, in which windows 3 are made, and in the capital walls – opposite of windows 3 – there are doors 4, at the same time, capital walls 1, front walls 2 and false walls 5 form rooms 6, 7 and 8 so that in each of rooms 6, 7, 8 there is window 3, door 4 and bathroom with door 9. False walls 5 are fixed relative to front walls 2 by means of locking mechanism 10 embedded in false wall 5 and containing a rotary knob, pushing crossbars into the corresponding openings of front wall 2, which are locked with a key placed in the keyhole. At the same time, in the lateral ends of the upper part of each false walls 5, facing from one side to main wall 1, and from the other to front wall 2, axes 11 are made, on which inner rings of the bearings 12 are fitted with tension, the outer rings of which are placed in U-shaped profile-guide 13, rigidly fixed along main wall 1, and – opposite – in U-shaped profile-guide 14, rigidly fixed along front wall 2, which allows false walls 5 when removing crossbars of locking mechanism 10 from openings of front wall 2 to freely move relative to each other and walls 1, 2 – from the specified fixed position to another, which is determined, for example, by the size of the sanitary facilities of rooms 6 and 8. Soundproofing sealing baseboard is placed on both sides of false wall 5 – in the gaps between false wall 5 and floor, false wall 5 and ceiling 15, false wall 5 and main wall 1, false wall 5 and front wall 2 of rooms 6, 7, 8.EFFECT: it is possible to change the number of hotel rooms.1 cl, 4 dwg
Изобретение относится к области модернизации гостиниц, в частности изменения их номерного фонда. Устройство состоит из пространства, ограниченного капитальными стенами 1 и фронтальными стенами 2, в которых выполнены окна 3, а в капитальных - оппозитно окнам 3 - двери 4, при этом капитальные стены 1, фронтальные стены 2 и фальшстены 5 образуют номера 6, 7 и 8 так, что в каждом из номеров 6, 7, 8 находится окно 3, дверь 4 и санузел с дверью 9. Фальшстены 5 зафиксированы относительно фронтальных стен 2 посредством замкового механизма 10, встроенного в фальшстену 5 и содержащего поворотную ручку, выдвигающую ригели в соответствующие отверстия фронтальной стены 2, которые запираются ключом, размещаемым в замочной скважине. При этом в боковых торцах верхней части каждой фальшстены 5, обращенных с одной стороны к капитальной стене 1, а с другой - к фронтальной стене 2, выполнены оси 11, на которых с натягом установлены внутренние кольца подшипников 12, наружные кольца которых размещены в П-образном профиле-направляющей 13, жестко закрепленном вдоль капитальной стены 1, и - оппозитно - в П-образном профиле-направляющей 14, жестко закрепленном вдоль фронтальной стены 2, что позволяет фальшстенам 5 при выведении ригелей замкового механизма 10 из отверстий фронтальной стены 2 свободно перемещаться относительно друг друга и стен 1, 2 - от указанного фиксируемого положения до другого, которое определяется, например, размерами санузлов номеров 6 и 8. Звукоизолирующий плинтус-уплотнитель размещается с обеих сторон фальшстен 5 - в зазорах между фальшстеной 5 и полом, фальшстеной 5 и потолком 15, фальшстеной 5 и капитальной стеной 1, фальшстеной 5 и фронтальной стеной 2 номеров 6, 7, 8. 4 ил.
HOTEL WITH VARIABLE NUMBER OF ROOMS
FIELD: construction.SUBSTANCE: invention relates to the field of modernization of hotels, in particular to modernization of hotel rooms. In the method, the device consists of a space bounded by main walls 1 and front walls 2, in which windows 3 are made, and in the capital walls – opposite of windows 3 – there are doors 4, at the same time, capital walls 1, front walls 2 and false walls 5 form rooms 6, 7 and 8 so that in each of rooms 6, 7, 8 there is window 3, door 4 and bathroom with door 9. False walls 5 are fixed relative to front walls 2 by means of locking mechanism 10 embedded in false wall 5 and containing a rotary knob, pushing crossbars into the corresponding openings of front wall 2, which are locked with a key placed in the keyhole. At the same time, in the lateral ends of the upper part of each false walls 5, facing from one side to main wall 1, and from the other to front wall 2, axes 11 are made, on which inner rings of the bearings 12 are fitted with tension, the outer rings of which are placed in U-shaped profile-guide 13, rigidly fixed along main wall 1, and – opposite – in U-shaped profile-guide 14, rigidly fixed along front wall 2, which allows false walls 5 when removing crossbars of locking mechanism 10 from openings of front wall 2 to freely move relative to each other and walls 1, 2 – from the specified fixed position to another, which is determined, for example, by the size of the sanitary facilities of rooms 6 and 8. Soundproofing sealing baseboard is placed on both sides of false wall 5 – in the gaps between false wall 5 and floor, false wall 5 and ceiling 15, false wall 5 and main wall 1, false wall 5 and front wall 2 of rooms 6, 7, 8.EFFECT: it is possible to change the number of hotel rooms.1 cl, 4 dwg
Изобретение относится к области модернизации гостиниц, в частности изменения их номерного фонда. Устройство состоит из пространства, ограниченного капитальными стенами 1 и фронтальными стенами 2, в которых выполнены окна 3, а в капитальных - оппозитно окнам 3 - двери 4, при этом капитальные стены 1, фронтальные стены 2 и фальшстены 5 образуют номера 6, 7 и 8 так, что в каждом из номеров 6, 7, 8 находится окно 3, дверь 4 и санузел с дверью 9. Фальшстены 5 зафиксированы относительно фронтальных стен 2 посредством замкового механизма 10, встроенного в фальшстену 5 и содержащего поворотную ручку, выдвигающую ригели в соответствующие отверстия фронтальной стены 2, которые запираются ключом, размещаемым в замочной скважине. При этом в боковых торцах верхней части каждой фальшстены 5, обращенных с одной стороны к капитальной стене 1, а с другой - к фронтальной стене 2, выполнены оси 11, на которых с натягом установлены внутренние кольца подшипников 12, наружные кольца которых размещены в П-образном профиле-направляющей 13, жестко закрепленном вдоль капитальной стены 1, и - оппозитно - в П-образном профиле-направляющей 14, жестко закрепленном вдоль фронтальной стены 2, что позволяет фальшстенам 5 при выведении ригелей замкового механизма 10 из отверстий фронтальной стены 2 свободно перемещаться относительно друг друга и стен 1, 2 - от указанного фиксируемого положения до другого, которое определяется, например, размерами санузлов номеров 6 и 8. Звукоизолирующий плинтус-уплотнитель размещается с обеих сторон фальшстен 5 - в зазорах между фальшстеной 5 и полом, фальшстеной 5 и потолком 15, фальшстеной 5 и капитальной стеной 1, фальшстеной 5 и фронтальной стеной 2 номеров 6, 7, 8. 4 ил.
HOTEL WITH VARIABLE NUMBER OF ROOMS
ГОСТИНИЦА С ИЗМЕНЯЕМЫМ КОЛИЧЕСТВОМ НОМЕРОВ
SIMDYANKIN ARKADIJ ANATOLEVICH (Autor:in) / SIMDYANKINA ELENA EVGENEVNA (Autor:in) / RZHEVSKAYA ANNA SERGEEVNA (Autor:in)
11.04.2019
Patent
Elektronische Ressource
Russisch
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
Illumination notes. Hotel rooms
Engineering Index Backfile | 1919
|Hilton experiments with "allergy resistant" hotel rooms
British Library Online Contents | 2005