METHOD OF ARRANGEMENT OF ENCLOSURES FROM SECANT BORED PILES
FIELD: construction.SUBSTANCE: invention relates to construction of protective structures to combat landslide phenomena at gas transportation system facilities and other industrial infrastructure. Method of arranging fences of secant bored piles includes wells for leading and crossing piles and reinforcement frames. Method proposes to use casing pipes with longitudinally concave surfaces for advanced piles; at that, concave surfaces of adjacent casing pipes installed in pre-drilled wells serve as guides when drilling wells for crossing piles, which excludes rock collapse and removal of drilling tool to side. Further, into the drilled wells under the crossing piles, reinforcement frames are installed, which are fixed by means of welding to the casing pipes with longitudinally concave surfaces by bridges. Assembled structure is poured with concrete to form a guard.EFFECT: technical result consists in ensuring high quality of works when making barriers from secant bored piles, preventing rock collapse and removal of drilling tool to side.1 cl, 3 dwg
Изобретение относится к области строительства защитных сооружений, обеспечивающих борьбу с оползневыми явлениями на объектах газотранспортной системы и иных объектах промышленной инфраструктуры. Способ обустройства ограждений из секущих буронабивных свай включает в себя скважины под опережающие и пересекающие сваи, арматурные каркасы. Способ предлагает использовать обсадные трубы с продольно вогнутыми поверхностями для опережающих свай, при этом вогнутые поверхности соседних обсадных труб, установленных в предварительно пробуренные скважины, служат направляющими при бурении скважин для пересекающих свай, что исключает обрушение породы и увод бурового инструмента в сторону. Далее в пробуренные скважины под пересекающие сваи устанавливают арматурные каркасы, которые крепят сваркой к обсадным трубам с продольно вогнутыми поверхностями перемычками. Собранную конструкцию заливают бетоном для формирования ограждения. Технический результат состоит в обеспечении высокого качества проведения работ при обустройстве ограждений из секущих буронабивных свай, в предотвращении обрушения породы и увода бурового инструмента в сторону. 3 ил.
METHOD OF ARRANGEMENT OF ENCLOSURES FROM SECANT BORED PILES
FIELD: construction.SUBSTANCE: invention relates to construction of protective structures to combat landslide phenomena at gas transportation system facilities and other industrial infrastructure. Method of arranging fences of secant bored piles includes wells for leading and crossing piles and reinforcement frames. Method proposes to use casing pipes with longitudinally concave surfaces for advanced piles; at that, concave surfaces of adjacent casing pipes installed in pre-drilled wells serve as guides when drilling wells for crossing piles, which excludes rock collapse and removal of drilling tool to side. Further, into the drilled wells under the crossing piles, reinforcement frames are installed, which are fixed by means of welding to the casing pipes with longitudinally concave surfaces by bridges. Assembled structure is poured with concrete to form a guard.EFFECT: technical result consists in ensuring high quality of works when making barriers from secant bored piles, preventing rock collapse and removal of drilling tool to side.1 cl, 3 dwg
Изобретение относится к области строительства защитных сооружений, обеспечивающих борьбу с оползневыми явлениями на объектах газотранспортной системы и иных объектах промышленной инфраструктуры. Способ обустройства ограждений из секущих буронабивных свай включает в себя скважины под опережающие и пересекающие сваи, арматурные каркасы. Способ предлагает использовать обсадные трубы с продольно вогнутыми поверхностями для опережающих свай, при этом вогнутые поверхности соседних обсадных труб, установленных в предварительно пробуренные скважины, служат направляющими при бурении скважин для пересекающих свай, что исключает обрушение породы и увод бурового инструмента в сторону. Далее в пробуренные скважины под пересекающие сваи устанавливают арматурные каркасы, которые крепят сваркой к обсадным трубам с продольно вогнутыми поверхностями перемычками. Собранную конструкцию заливают бетоном для формирования ограждения. Технический результат состоит в обеспечении высокого качества проведения работ при обустройстве ограждений из секущих буронабивных свай, в предотвращении обрушения породы и увода бурового инструмента в сторону. 3 ил.
METHOD OF ARRANGEMENT OF ENCLOSURES FROM SECANT BORED PILES
СПОСОБ ОБУСТРОЙСТВА ОГРАЖДЕНИЙ ИЗ СЕКУЩИХ БУРОНАБИВНЫХ СВАЙ
TKACHENKO IGOR GRIGOREVICH (Autor:in) / SHABLYA SERGEJ GENNADEVICH (Autor:in) / TVARDIEVICH SERGEJ VYACHESLAVOVICH (Autor:in) / SHUMSKIJ BORIS GENNADEVICH (Autor:in) / BACHALOV SERGEJ VLADIMIROVICH (Autor:in) / SHATOKHIN ALEKSANDR ANATOLEVICH (Autor:in) / GERASKIN VADIM GEORGIEVICH (Autor:in) / KISLUN ALEKSEJ ANDREEVICH (Autor:in) / SHABROV SERGEJ NIKOLAEVICH (Autor:in) / SHABROV PETR NIKOLAEVICH (Autor:in)
01.07.2019
Patent
Elektronische Ressource
Russisch
IPC:
E02D
FOUNDATIONS
,
Gründungen