In the course of rehabilitation of a ballast bed of a track, while creating a track construction site (10), old bulk material (6) to be removed is stored on a plurality of storage wagons (2) connected to form a loading train (7). Parallel thereto, new bulk material (9) pre-deposited on a plurality of storage wagons (2) connected to form a loading train (8) is introduced into the track construction site (10). The introduction of the new bulk material (9) into the track construction site (10) is controlled automatically in dependence on a volume of the old bulk material (6) removed from the track construction site (10).
Method for controlling the ballast supply during renovation of a ballast bed
In the course of rehabilitation of a ballast bed of a track, while creating a track construction site (10), old bulk material (6) to be removed is stored on a plurality of storage wagons (2) connected to form a loading train (7). Parallel thereto, new bulk material (9) pre-deposited on a plurality of storage wagons (2) connected to form a loading train (8) is introduced into the track construction site (10). The introduction of the new bulk material (9) into the track construction site (10) is controlled automatically in dependence on a volume of the old bulk material (6) removed from the track construction site (10).
Method for controlling the ballast supply during renovation of a ballast bed
WOERGOETTER HERBERT (Autor:in)
25.09.2018
Patent
Elektronische Ressource
Englisch
METHOD FOR CONTROLLING BALLAST SUPPLY DURING RENOVATION OF BALLAST BED
Europäisches Patentamt | 2018
|METHOD FOR CONTROLLING THE BALLAST SUPPLY DURING RENOVATION OF A BALLAST BED
Europäisches Patentamt | 2017
|Inclined shaft ballast bed nondestructive renovation method
Europäisches Patentamt | 2020
|Ballast and Ballast Maintenance
Online Contents | 2008