Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Marking underground obstacles
A method is provided for preparing an area of the ground surface to be milled by a milling machine. Prior to performing any milling operation on the area of the ground surface, a survey vehicle separate from the milling machine is used to traverse the area. The survey vehicle detects the presence of buried obstacles with a sensor and generates a sensor output signal indicative of the presence of the buried obstacle. The sensor output signal is received in a controller which generates a sprayer actuation signal and responds to the sensor output signal. A marking sprayer is actuated in response to the sprayer actuation signal and sprays the ground surface above the obstacle with a visible marking emitted from the sprayer. Subsequently, a milling machine separate from the survey vehicle may be utilized to mill the ground surface and by observation of the visible markings the operator may avoid impacting the milling drum with the buried obstacles.
Marking underground obstacles
A method is provided for preparing an area of the ground surface to be milled by a milling machine. Prior to performing any milling operation on the area of the ground surface, a survey vehicle separate from the milling machine is used to traverse the area. The survey vehicle detects the presence of buried obstacles with a sensor and generates a sensor output signal indicative of the presence of the buried obstacle. The sensor output signal is received in a controller which generates a sprayer actuation signal and responds to the sensor output signal. A marking sprayer is actuated in response to the sprayer actuation signal and sprays the ground surface above the obstacle with a visible marking emitted from the sprayer. Subsequently, a milling machine separate from the survey vehicle may be utilized to mill the ground surface and by observation of the visible markings the operator may avoid impacting the milling drum with the buried obstacles.
Marking underground obstacles
BERNING CHRISTIAN (Autor:in) / LENZ MARTIN (Autor:in) / BARIMANI CYRUS (Autor:in)
09.07.2019
Patent
Elektronische Ressource
Englisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
/
B05B
Sprühvorrichtungen
,
SPRAYING APPARATUS
/
B05C
Vorrichtungen zum Aufbringen von Flüssigkeiten oder von anderen fließfähigen Stoffen auf Oberflächen allgemein
,
APPARATUS FOR APPLYING LIQUIDS OR OTHER FLUENT MATERIALS TO SURFACES, IN GENERAL
/
B05D
PROCESSES FOR APPLYING LIQUIDS OR OTHER FLUENT MATERIALS TO SURFACES, IN GENERAL
,
Verfahren zum Aufbringen von Flüssigkeiten oder von anderen fließfähigen Stoffen auf Oberflächen allgemein
/
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
Cantilever foundation structure crossing underground obstacles
Europäisches Patentamt | 2023
|