In a method for renewing a track (2) and cleaning a ballast bed (3), the old track (2) is lifted off the ballast bed in sections as a track panel (15), transported forward in a working direction (4) and deposited on track panel wagons (8). The exposed ballast bed (3), forming a renewal gap (17), is cleaned by a cleaning machine (11), spoil (32) accruing in the process is transported forward underneath the track panels (15) deposited on the track panel wagons (8), and stored in hopper cars (10). New rails (29), pre-deposited underneath new sleepers (27) positioned on sleeper wagons (14), are pulled forward into the renewal gap (17) by the cleaning machine (11) and deposited on the cleaned ballast bed (3). The new sleepers (27) are laid down on the cleaned ballast bed and connected to the new rails (29) lifted off the ballast bed (3).
In a method for renewing a track (2) and cleaning a ballast bed (3), the old track (2) is lifted off the ballast bed in sections as a track panel (15), transported forward in a working direction (4) and deposited on track panel wagons (8). The exposed ballast bed (3), forming a renewal gap (17), is cleaned by a cleaning machine (11), spoil (32) accruing in the process is transported forward underneath the track panels (15) deposited on the track panel wagons (8), and stored in hopper cars (10). New rails (29), pre-deposited underneath new sleepers (27) positioned on sleeper wagons (14), are pulled forward into the renewal gap (17) by the cleaning machine (11) and deposited on the cleaned ballast bed (3). The new sleepers (27) are laid down on the cleaned ballast bed and connected to the new rails (29) lifted off the ballast bed (3).
Method for track renewal
BRUNNINGER MANFRED (Autor:in)
20.08.2019
Patent
Elektronische Ressource
Englisch
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
Online Contents | 2005
British Library Conference Proceedings | 2002
|IuD Bahn | 2006
|IuD Bahn | 2002
|