Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction methods and systems for grade separation structures
A cut and cover method of constructing grade separation structures includes partially burying precast substructure elements with associated trench boxes under live traffic. Once the precast substructure elements are buried, the substructure is completed and the bridge span is installed. Other methods include installing precast superstructure elements with a formwork system and forming a bridge substructure and excavating underneath the superstructure once the superstructure is formed.
Construction methods and systems for grade separation structures
A cut and cover method of constructing grade separation structures includes partially burying precast substructure elements with associated trench boxes under live traffic. Once the precast substructure elements are buried, the substructure is completed and the bridge span is installed. Other methods include installing precast superstructure elements with a formwork system and forming a bridge substructure and excavating underneath the superstructure once the superstructure is formed.
Construction methods and systems for grade separation structures
IVANTCHOUK ARTEM (Autor:in) / CARSON ERIC WILLIAM (Autor:in)
08.10.2019
Patent
Elektronische Ressource
Englisch
CONSTRUCTION METHODS AND SYSTEMS FOR GRADE SEPARATION STRUCTURES
Europäisches Patentamt | 2019
|CONSTRUCTION METHODS AND SYSTEMS FOR GRADE SEPARATION STRUCTURES
Europäisches Patentamt | 2019
|CONSTRUCTION METHODS AND SYSTEMS FOR GRADE SEPARATION STRUCTURES
Europäisches Patentamt | 2017
|CONSTRUCTION METHODS AND SYSTEMS FOR GRADE SEPARATION STRUCTURES
Europäisches Patentamt | 2016
|Construction methods and systems for grade separation structures
Europäisches Patentamt | 2019
|