Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Urban transformation and construction method for creating a public access tropical style swimming lagoon with beaches within vacant or abandoned sites
An urban transformation and construction method is disclosed that creates a tropical style swimming lagoon at vacant and/or abandoned sites. The transformation includes demolishing at least part of the vacant or abandoned site, excavating material from within the site; forming a basin for a large water body having a surface area of at least 3,000 m2, and constructing water containment walls on a first section of the basin to form a waterfront perimeter. The shape of the waterfront perimeter is mainly curved, the basin has a maximum width of 300 meters, and the bottom is covered with a non-permeable material. A sloped access area is constructed in a second section of the basin to form a beach. A barrier is constructed to control access into the area including the beach. At least one recreational facility is constructed including restaurants, bars, kiosks, stores, and/or cafes about the waterfront perimeter.
Urban transformation and construction method for creating a public access tropical style swimming lagoon with beaches within vacant or abandoned sites
An urban transformation and construction method is disclosed that creates a tropical style swimming lagoon at vacant and/or abandoned sites. The transformation includes demolishing at least part of the vacant or abandoned site, excavating material from within the site; forming a basin for a large water body having a surface area of at least 3,000 m2, and constructing water containment walls on a first section of the basin to form a waterfront perimeter. The shape of the waterfront perimeter is mainly curved, the basin has a maximum width of 300 meters, and the bottom is covered with a non-permeable material. A sloped access area is constructed in a second section of the basin to form a beach. A barrier is constructed to control access into the area including the beach. At least one recreational facility is constructed including restaurants, bars, kiosks, stores, and/or cafes about the waterfront perimeter.
Urban transformation and construction method for creating a public access tropical style swimming lagoon with beaches within vacant or abandoned sites
FISCHMANN FERNANDO BENJAMIN (Autor:in)
22.08.2023
Patent
Elektronische Ressource
Englisch
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
/
E02D
FOUNDATIONS
,
Gründungen
/
G06Q
Datenverarbeitungssysteme oder -verfahren, besonders angepasst an verwaltungstechnische, geschäftliche, finanzielle oder betriebswirtschaftliche Zwecke, sowie an geschäftsbezogene Überwachungs- oder Voraussagezwecke
,
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2021
|Europäisches Patentamt | 2021
|Europäisches Patentamt | 2020
|Europäisches Patentamt | 2023
|