Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Reducing Trenching at Mooring Lines
The present techniques are directed to systems and a method for reducing trenching around piles. An exemplary method includes attaching a mooring line to one end of a padeye extender bar that is coupled by another end to a padeye on the pile. The pile is installed in a sediment layer. The padeye extender bar is deployed to hold an attachment point for the mooring line above the sedimenlt layer.
Reducing Trenching at Mooring Lines
The present techniques are directed to systems and a method for reducing trenching around piles. An exemplary method includes attaching a mooring line to one end of a padeye extender bar that is coupled by another end to a padeye on the pile. The pile is installed in a sediment layer. The padeye extender bar is deployed to hold an attachment point for the mooring line above the sedimenlt layer.
Reducing Trenching at Mooring Lines
WONG PATRICK C (Autor:in) / ARSLAN HAYDAR (Autor:in) / LOKKEN ROALD T (Autor:in)
27.02.2020
Patent
Elektronische Ressource
Englisch
Online Contents | 1995