Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
METHOD FOR PRODUCING AN INTEGRAL BRIDGE, AND INTEGRAL BRIDGE
A first arch and second arch are produced in respective first and second structural portions. Each arch has a tie rod interconnecting the foot points of the arch, where a foot point of the arch is displaceably mounted. Each tie rod is tensioned so that horizontal forces caused by the weight of the arches at the foot points of the corresponding arch, are taken up by the tie rods. A first end point of the tie rod of the first arch is connected in a force-fitting manner to the first abutment, and a second end point of the tie rod of a last arch is connected in a force-fitting manner to the second abutment. The remaining adjoining end points of the tie rods are connected to one another in a force-fitting manner, and corresponding foot points of the arches are connected in a force-fitting manner to the abutments and pillar.
METHOD FOR PRODUCING AN INTEGRAL BRIDGE, AND INTEGRAL BRIDGE
A first arch and second arch are produced in respective first and second structural portions. Each arch has a tie rod interconnecting the foot points of the arch, where a foot point of the arch is displaceably mounted. Each tie rod is tensioned so that horizontal forces caused by the weight of the arches at the foot points of the corresponding arch, are taken up by the tie rods. A first end point of the tie rod of the first arch is connected in a force-fitting manner to the first abutment, and a second end point of the tie rod of a last arch is connected in a force-fitting manner to the second abutment. The remaining adjoining end points of the tie rods are connected to one another in a force-fitting manner, and corresponding foot points of the arches are connected in a force-fitting manner to the abutments and pillar.
METHOD FOR PRODUCING AN INTEGRAL BRIDGE, AND INTEGRAL BRIDGE
KOLLEGGER JOHANN (Autor:in) / GASSNER GEORG (Autor:in)
06.08.2020
Patent
Elektronische Ressource
Englisch
IPC:
E01D
BRIDGES
,
Brücken
Method for producing integral bridge, and integral bridge
Europäisches Patentamt | 2020
|Method for producing an integral bridge, and integral bridge
Europäisches Patentamt | 2021
|Springer Verlag | 2018
|