Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
ONE-STEP INTEGRALLY-FORMED BAMBOO SLEEPER AND PREPARATION METHOD THEREOF
The present invention discloses a one-step integrally-formed bamboo sleeper. For the one-step integrally-formed bamboo sleeper, a bamboo unit is used as a raw material, to be dried and modified at the temperature of 110-180° C., and then subject to adhesive dipping, adhesive throwing, solidification, dopamine solution treatment, anti-mildew and/or anti-corrosion and/or anti-insect treatment, and fastening, to obtain the one-step integrally-formed bamboo sleeper with a density of 0.9-1.5 g/cm3. The present invention further provides a preparation method for the foregoing bamboo sleeper. The bamboo sleeper prepared in the present invention has a suitable elastic modulus, and applicable for ballasted tracks of railways and urban rail transit systems.
ONE-STEP INTEGRALLY-FORMED BAMBOO SLEEPER AND PREPARATION METHOD THEREOF
The present invention discloses a one-step integrally-formed bamboo sleeper. For the one-step integrally-formed bamboo sleeper, a bamboo unit is used as a raw material, to be dried and modified at the temperature of 110-180° C., and then subject to adhesive dipping, adhesive throwing, solidification, dopamine solution treatment, anti-mildew and/or anti-corrosion and/or anti-insect treatment, and fastening, to obtain the one-step integrally-formed bamboo sleeper with a density of 0.9-1.5 g/cm3. The present invention further provides a preparation method for the foregoing bamboo sleeper. The bamboo sleeper prepared in the present invention has a suitable elastic modulus, and applicable for ballasted tracks of railways and urban rail transit systems.
ONE-STEP INTEGRALLY-FORMED BAMBOO SLEEPER AND PREPARATION METHOD THEREOF
HU JINBO (Autor:in) / PENG JIAN (Autor:in) / ZENG WEIHONG (Autor:in) / XIONG YANHUI (Autor:in) / LIU DIQIN (Autor:in) / XUE ZHICHENG (Autor:in) / LI XIANJUN (Autor:in) / WU ZHIPING (Autor:in) / CHANG SHANSHAN (Autor:in) / LIU GONGGANG (Autor:in)
17.03.2022
Patent
Elektronische Ressource
Englisch
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
/
B27K
Verfahren, Vorrichtungen oder Auswahl von Stoffen zum Imprägnieren, Beizen, Färben oder Bleichen von Holz oder für das Behandeln von Holz mit eindringfähigen Flüssigkeiten, soweit nicht anderweitig vorgesehen
,
PROCESSES, APPARATUS OR SELECTION OF SUBSTANCES FOR IMPREGNATING, STAINING, DYEING OR BLEACHING OF WOOD, OR FOR TREATING OF WOOD WITH PERMEANT LIQUIDS, NOT OTHERWISE PROVIDED FOR
One-step integrally-formed bamboo sleeper and preparation method thereof
Europäisches Patentamt | 2024
|Integrally-formed composite sleeper, preparation process and preparation device
Europäisches Patentamt | 2024
|Integrally-formed sleeper buffering composite part and preparation method and application thereof
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|ASSEMBLED BAMBOO SLEEPER AND PREPARATION METHOD THEREOF
Europäisches Patentamt | 2022
|