DOUBLE-DECK MULTI-SPAN BRIDGE CONSTRUCTION METHOD
Disclosed in the present disclosure is a double-deck multi-span bridge construction method. According to the double-deck bridge construction method of the present disclosure, construction is carried out by using a method of disassembling a support jig frame in a graded and span-separated mode, an upper chord jig frame and a lower chord jig frame can be used in a recycle manner, and construction costs are reduced. In addition, a construction period of building the support jig frame is shortened, and other construction operations can be synchronously carried out on a span in which the jig frame is disassembled, for example, fire retardant coating construction can be carried out on a mounted bridge deck after the jig frame is disassembled, and the construction period of a double-deck multi-span bridge is effectively shortened. Additionally, according to the double-deck multi-span bridge construction method in embodiments of the present disclosure, the upper chord jig frame and the lower chord jig frame are disassembled in a graded manner, thereby ensuring that a bridge structure can be smoothly and safely transitioned to a designed stress state.
DOUBLE-DECK MULTI-SPAN BRIDGE CONSTRUCTION METHOD
Disclosed in the present disclosure is a double-deck multi-span bridge construction method. According to the double-deck bridge construction method of the present disclosure, construction is carried out by using a method of disassembling a support jig frame in a graded and span-separated mode, an upper chord jig frame and a lower chord jig frame can be used in a recycle manner, and construction costs are reduced. In addition, a construction period of building the support jig frame is shortened, and other construction operations can be synchronously carried out on a span in which the jig frame is disassembled, for example, fire retardant coating construction can be carried out on a mounted bridge deck after the jig frame is disassembled, and the construction period of a double-deck multi-span bridge is effectively shortened. Additionally, according to the double-deck multi-span bridge construction method in embodiments of the present disclosure, the upper chord jig frame and the lower chord jig frame are disassembled in a graded manner, thereby ensuring that a bridge structure can be smoothly and safely transitioned to a designed stress state.
DOUBLE-DECK MULTI-SPAN BRIDGE CONSTRUCTION METHOD
REN JINGLEI (Autor:in) / SUN BING (Autor:in) / GAO YONGGANG (Autor:in) / SHEN HONGYU (Autor:in) / ZHU SHAOHUI (Autor:in) / QI JIANGUO (Autor:in) / LIU CUI (Autor:in) / YAN RUIHUA (Autor:in) / HE ZHIQIANG (Autor:in) / LI LONGFEI (Autor:in)
21.03.2024
Patent
Elektronische Ressource
Englisch
IPC:
E01D
BRIDGES
,
Brücken
Large-span double-deck bridge structure and construction method thereof
Europäisches Patentamt | 2024
|Construction method of large-span curved bridge deck slab
Europäisches Patentamt | 2023
|Combined bridge deck structure of large-span bridge and construction method thereof
Europäisches Patentamt | 2021
|Large-span deck type arch bridge girder hoisting construction method
Europäisches Patentamt | 2024
|