Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
SULFUR PIT ROOF DEGRADATION MITIGATION
A sulfur pit that mitigates water ingress may include a concrete slab roof that comprises a first concrete slab and a second concrete slab; a polymer sealant disposed on an exterior surface of the concrete slab roof; a refractory layer disposed on an interior surface of the concrete slab roof; and at least one expansion joint located in the gap between the first concrete slab and the second concrete slab. The expansion joint may include a fiber rope disposed in the gap between the first concrete slab and the second concrete slab; a fluoroelastomer caulk located (a) in a first spacing between the fiber rope and the first concrete slab and (b) in a second spacing between the fiber rope and the second concrete slab; and a steel plate spanning the gap between the first concrete slab and the second concrete slab.
SULFUR PIT ROOF DEGRADATION MITIGATION
A sulfur pit that mitigates water ingress may include a concrete slab roof that comprises a first concrete slab and a second concrete slab; a polymer sealant disposed on an exterior surface of the concrete slab roof; a refractory layer disposed on an interior surface of the concrete slab roof; and at least one expansion joint located in the gap between the first concrete slab and the second concrete slab. The expansion joint may include a fiber rope disposed in the gap between the first concrete slab and the second concrete slab; a fluoroelastomer caulk located (a) in a first spacing between the fiber rope and the first concrete slab and (b) in a second spacing between the fiber rope and the second concrete slab; and a steel plate spanning the gap between the first concrete slab and the second concrete slab.
SULFUR PIT ROOF DEGRADATION MITIGATION
DWEIB MAHMOUD A (Autor:in) / ABU-AISHEH EMAD (Autor:in)
11.07.2024
Patent
Elektronische Ressource
Englisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
/
B65D
Behältnisse zur Lagerung oder zum Transport von Gegenständen oder Materialien [Container], z.B. Säcke, Beutel, Fässer, Flaschen, Dosen, Kästen, Büchsen, Schachteln, Packkörbe, Tonnen, Gläser, Flüssigkeitsbehälter, Trichtersilos, Transportbehälter
,
CONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS
Storm Water Runoff Mitigation Using a Green Roof
British Library Online Contents | 2009
|Green roof flood mitigation in the Mediterranean region
British Library Conference Proceedings | 2018
|Climate change mitigation: resilience indicators for roof solutions
Emerald Group Publishing | 2018
|Surface heat budget on green roof and high reflection roof for mitigation of urban heat island
Online Contents | 2007
|