Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
BOOM-ARM SEGMENT AND METHOD FOR PRODUCING A BOOM-ARM SEGMENT
The invention relates to a boom-arm segment fora concrete pump, wherein the boom-arm segment (30) comprises a side part (35, 36)-which extends between a top chord (33) and a bottom chord (34) of the boom-arm segment (30). In the side part (35, 36), a bent portion is formed such that a first portion (42, 43) of the side part (35, 36) has a lateral offset (56) relative to a second portion (44) of the side part (35, 36). A transition portion (45, 46) forms a connection between the first portion (42, 43) and the second portion (44). The boom-arm segment (30) comprises a reinforcement part (40, 50), the material thickness of which spans the lateral offset (56) between the first portion (42, 43) and the second portion (44). The reinforcement part (40, 50) is butt-joined to the transition portion (45, 46). The invention also relates to a method for producing a boom-arm segment (30).
BOOM-ARM SEGMENT AND METHOD FOR PRODUCING A BOOM-ARM SEGMENT
The invention relates to a boom-arm segment fora concrete pump, wherein the boom-arm segment (30) comprises a side part (35, 36)-which extends between a top chord (33) and a bottom chord (34) of the boom-arm segment (30). In the side part (35, 36), a bent portion is formed such that a first portion (42, 43) of the side part (35, 36) has a lateral offset (56) relative to a second portion (44) of the side part (35, 36). A transition portion (45, 46) forms a connection between the first portion (42, 43) and the second portion (44). The boom-arm segment (30) comprises a reinforcement part (40, 50), the material thickness of which spans the lateral offset (56) between the first portion (42, 43) and the second portion (44). The reinforcement part (40, 50) is butt-joined to the transition portion (45, 46). The invention also relates to a method for producing a boom-arm segment (30).
BOOM-ARM SEGMENT AND METHOD FOR PRODUCING A BOOM-ARM SEGMENT
BENZ ANDREAS (Autor:in) / MÜLLER ANSGAR (Autor:in) / RAU BENJAMIN (Autor:in)
11.07.2024
Patent
Elektronische Ressource
Englisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
BOOM-ARM SEGMENT AND METHOD FOR PRODUCING A BOOM-ARM SEGMENT
Europäisches Patentamt | 2024
|Articulated boom with boom segments and method for producing a boom segment
Europäisches Patentamt | 2022
|ARTICULATED BOOM WITH BOOM SEGMENTS AND METHOD FOR PRODUCING A BOOM SEGMENT
Europäisches Patentamt | 2020
|ARTICULATED BOOM WITH BOOM SEGMENTS AND METHOD FOR PRODUCING A BOOM SEGMENT
Europäisches Patentamt | 2025
BOOM-ARM SEGMENT FOR A CONCRETE PUMP AND METHOD FOR PRODUCING A BOOM-ARM SEGMENT
Europäisches Patentamt | 2024
|