Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
CONSTRUCTION METHOD FOR REMOVING MUD IN JACKET STEEL PIPE PILE
A construction method for removing mud in a jacket steel pipe pile includes: erecting a piling auxiliary platform, and performing underwater steel pipe pile sinking; measuring an elevation of a mud surface in the underwater steel pipe pile, and calculating a height from the mud surface in the pile to a pile top and a needed mud removing depth according to the measurement result; installing mud removing equipment on the steel pipe pile; starting the mud removing equipment to carry out mud removing operation, and in a case that the mud removing depth is reached, pausing the mud removing equipment, and cleaning an inner wall of the steel pipe pile; and in a case that the mud removing operation is not reach the related elevation, repeating the mud removing operation till the mud removing operation reaches a standard.
CONSTRUCTION METHOD FOR REMOVING MUD IN JACKET STEEL PIPE PILE
A construction method for removing mud in a jacket steel pipe pile includes: erecting a piling auxiliary platform, and performing underwater steel pipe pile sinking; measuring an elevation of a mud surface in the underwater steel pipe pile, and calculating a height from the mud surface in the pile to a pile top and a needed mud removing depth according to the measurement result; installing mud removing equipment on the steel pipe pile; starting the mud removing equipment to carry out mud removing operation, and in a case that the mud removing depth is reached, pausing the mud removing equipment, and cleaning an inner wall of the steel pipe pile; and in a case that the mud removing operation is not reach the related elevation, repeating the mud removing operation till the mud removing operation reaches a standard.
CONSTRUCTION METHOD FOR REMOVING MUD IN JACKET STEEL PIPE PILE
WANG DONGDONG (Autor:in) / LIU HUI (Autor:in) / WANG DAPENG (Autor:in) / WU HAIBING (Autor:in) / LV DONGLIANG (Autor:in) / SUN XUAN (Autor:in) / ZHANG HENG (Autor:in)
02.01.2025
Patent
Elektronische Ressource
Englisch
CONSTRUCTION METHOD FOR CLEANING MUD IN JACKET STEEL PIPE PILE
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2024
|Steel-pipe pile and steel-pipe pile construction method
Europäisches Patentamt | 2016
|STEEL PIPE PILE JOINT, STEEL PIPE PILE, AND CONSTRUCTION METHOD OF STEEL PIPE PILE
Europäisches Patentamt | 2021
|