Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
A method of erecting a pylon, in particular a pylon of a wind power installation, which has a foundation with segment anchors, wherein connecting elements project beyond the top side of the foundation by a predetermined amount. A ring is leveled, aligned and fixed at the top side of the foundation. A gap produced by leveling, aligning and fixing of the ring is underlaid with a grouting material. The grouting material is set and a lower pylon segment is placed on the leveled, aligned and fixed ring and connected thereto.
A method of erecting a pylon, in particular a pylon of a wind power installation, which has a foundation with segment anchors, wherein connecting elements project beyond the top side of the foundation by a predetermined amount. A ring is leveled, aligned and fixed at the top side of the foundation. A gap produced by leveling, aligning and fixing of the ring is underlaid with a grouting material. The grouting material is set and a lower pylon segment is placed on the leveled, aligned and fixed ring and connected thereto.
Tower and foundation
WOBBEN ALOYS (Autor:in)
08.12.2015
Patent
Elektronische Ressource
Englisch