Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Artificial dam of distributed coal mine underground reservoir and its constructing method
The present disclosure provides an artificial dam of a distributed coal mine underground reservoir and its constructing method. The artificial dam comprises a support layer (10), an anti-seepage layer (20), and a concrete structure layer (30) that are successively formed in an auxiliary roadway (1) from inside to outside, the concrete structure layer (30) being embedded into a security coal pillar (2) and/or surrounding rock (3) around the auxiliary roadway (1). Because the concrete structure layer (30) is embedded into the security coal pillar (2) and/or the surrounding rock (3) around the auxiliary roadway (1), the artificial dam is combined to the security coal pillar (2) to together form a dam for an underground reservoir. Due to multi-layer design, anti-seepage performance and structural strength of the dam can meet the water storage requirements of the underground reservoir.
Artificial dam of distributed coal mine underground reservoir and its constructing method
The present disclosure provides an artificial dam of a distributed coal mine underground reservoir and its constructing method. The artificial dam comprises a support layer (10), an anti-seepage layer (20), and a concrete structure layer (30) that are successively formed in an auxiliary roadway (1) from inside to outside, the concrete structure layer (30) being embedded into a security coal pillar (2) and/or surrounding rock (3) around the auxiliary roadway (1). Because the concrete structure layer (30) is embedded into the security coal pillar (2) and/or the surrounding rock (3) around the auxiliary roadway (1), the artificial dam is combined to the security coal pillar (2) to together form a dam for an underground reservoir. Due to multi-layer design, anti-seepage performance and structural strength of the dam can meet the water storage requirements of the underground reservoir.
Artificial dam of distributed coal mine underground reservoir and its constructing method
GU DAZHAO (Autor:in) / LI QUANSHENG (Autor:in) / CHEN SUSHE (Autor:in) / CAO ZHIGUO (Autor:in)
27.06.2017
Patent
Elektronische Ressource
Englisch
Artificial retaining dam of coal mine underground reservoir
Europäisches Patentamt | 2022
|Artificial dam body applied to coal mine underground reservoir
Europäisches Patentamt | 2021
|Method and system for constructing coal mine underground reservoir through multi-type filling mining
Europäisches Patentamt | 2024
|Coal mine underground reservoir artificial dam body and design and construction method thereof
Europäisches Patentamt | 2021
|DISTRIBUTED UNDERGROUND RESERVOIR FOR COAL MINES ARTIFICIAL DAM AND ITS ERECTION METHOD
Europäisches Patentamt | 2017
|