Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
MORTAR PACKAGES FOR MASONRY CONSTRUCTION
Pre-filled mortar packages (10, 11, 200, 280, 400) are positioned between masonry construction elements (such as stones, blocks or bricks) when forming a wall (such as a dry-stack stone wall). Each mortar package includes an outer covering (12, 212, 284) with a porous outer surface, a mortar mixture (20) covered by the outer covering, and (optionally) an adhesive (16) incorporated onto or in the porous outer surface. Both the adhesive and the mortar mixture are activated by a liquid, such as water. The mortar packages may be pre-wetted before placement or may be dry when placed and then activated by applying water or by wetting from rain water. Toroidal shaped mortar packages (200, 280) are used as footers for posts and poles. Tubular shaped mortar packages (400) are used as drainage ports through masonry construction or to protect buried lines.
L'invention concerne des paquets de mortier pré-remplis (10, 11, 200, 280, 400) placés entre des éléments de construction de maçonnerie (tels que des pierres, des blocs ou des briques) lors de la formation d'un mur (tel qu'un mur de pierre par empilement à sec). Chaque paquet de mortier comprend une couverture externe (12, 212, 284) ayant une surface externe poreuse, un mélange de mortier (20) couvert par la couverture externe, et (éventuellement) un adhésif (16) incorporé sur ou dans la surface externe poreuse. L'adhésif et le mélange de mortier sont tous deux activés par un liquide, tel que l'eau. Les paquets de mortier peuvent être préalablement mouillés avant d'être mis en place ou peuvent être secs lorsqu'ils sont placés, puis activés par l'application d'eau ou par un mouillage à partir d'eau de pluie. Des paquets de mortier de forme toroïdale (200, 280) sont utilisés comme embases pour des piliers et des poteaux. Des paquets de mortier de forme tubulaire (400) sont utilisés comme orifices de drainage à travers une construction de maçonnerie ou pour protéger des lignes enterrées.
MORTAR PACKAGES FOR MASONRY CONSTRUCTION
Pre-filled mortar packages (10, 11, 200, 280, 400) are positioned between masonry construction elements (such as stones, blocks or bricks) when forming a wall (such as a dry-stack stone wall). Each mortar package includes an outer covering (12, 212, 284) with a porous outer surface, a mortar mixture (20) covered by the outer covering, and (optionally) an adhesive (16) incorporated onto or in the porous outer surface. Both the adhesive and the mortar mixture are activated by a liquid, such as water. The mortar packages may be pre-wetted before placement or may be dry when placed and then activated by applying water or by wetting from rain water. Toroidal shaped mortar packages (200, 280) are used as footers for posts and poles. Tubular shaped mortar packages (400) are used as drainage ports through masonry construction or to protect buried lines.
L'invention concerne des paquets de mortier pré-remplis (10, 11, 200, 280, 400) placés entre des éléments de construction de maçonnerie (tels que des pierres, des blocs ou des briques) lors de la formation d'un mur (tel qu'un mur de pierre par empilement à sec). Chaque paquet de mortier comprend une couverture externe (12, 212, 284) ayant une surface externe poreuse, un mélange de mortier (20) couvert par la couverture externe, et (éventuellement) un adhésif (16) incorporé sur ou dans la surface externe poreuse. L'adhésif et le mélange de mortier sont tous deux activés par un liquide, tel que l'eau. Les paquets de mortier peuvent être préalablement mouillés avant d'être mis en place ou peuvent être secs lorsqu'ils sont placés, puis activés par l'application d'eau ou par un mouillage à partir d'eau de pluie. Des paquets de mortier de forme toroïdale (200, 280) sont utilisés comme embases pour des piliers et des poteaux. Des paquets de mortier de forme tubulaire (400) sont utilisés comme orifices de drainage à travers une construction de maçonnerie ou pour protéger des lignes enterrées.
MORTAR PACKAGES FOR MASONRY CONSTRUCTION
PAQUETS DE MORTIER POUR CONSTRUCTION DE MAÇONNERIE
RIDINGS CLAYTON L III (Autor:in)
23.07.2015
Patent
Elektronische Ressource
Englisch
IPC:
C04B
Kalk
,
LIME
Masonry construction without mortar
Engineering Index Backfile | 1937
|Masonry construction without mortar
Engineering Index Backfile | 1937
|Masonry construction without mortar
Engineering Index Backfile | 1937
|Masonry construction without mortar
Engineering Index Backfile | 1938
|