Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
TANK AND METHOD FOR CONSTRUCTING DIKE
In an LNG tank 1, a dike 2 is formed by arranging precast blocks 10 in the circumferential direction of the dike 2 and layering the precast blocks 10 in the vertical direction. The precast blocks 10 are provided with loop joints on the top and bottom sides and the left and right sides thereof, and concrete 60 is deposited between precast blocks 10 adjacent in the circumferential direction and the vertical direction in the dike 2, whereby masonry joints 17 are formed in the vertical direction and the circumferential direction of the dike 2. Prestress is introduced in the dike 2 by PC steel 54. The PC steel 54 is provided in the circumferential direction and the vertical direction of the dike 2, and is arranged so as to avoid the masonry joints 17 in each of the circumferential direction and the vertical direction of the dike 2. The dike can thereby be constructed in a short time, and it is possible to provide a tank or the like for which the construction period can be reduced.
Selon l'invention, dans un réservoir de GNL (1), une digue (2) est formée par agencement de blocs préfabriqués (10) dans la direction circonférentielle de la digue (2) et superposition des blocs préfabriqués (10) dans la direction verticale. Les blocs préfabriqués (10) comportent des joints en boucle sur les côtés supérieur et inférieur et les côtés gauche et droit de ces derniers, et du béton (60) est déposé entre des blocs préfabriqués (10) adjacents dans la direction circonférentielle et dans la direction verticale dans la digue (2), ce par quoi des joints de maçonnerie (17) sont formés dans la direction verticale et la direction circonférentielle de la digue (2). Une précontrainte est introduite dans la digue (2) par de l'acier PC (54). L'acier PC (54) est prévu dans la direction circonférentielle et la direction verticale de la digue (2), et est agencé de manière à éviter les joints de maçonnerie (17), dans chacune de la direction circonférentielle et la direction verticale de la digue (2). La digue peut ainsi être construite en un temps court, et il est possible de fournir un réservoir ou analogue pour lequel la durée de construction peut être réduite.
LNGタンク1では、防液堤2が、プレキャストブロック10を防液堤2の周方向に並べるとともに鉛直方向に積層して形成される。プレキャストブロック10は、上下面と左右面にループ継手12を備え、防液堤2の周方向および鉛直方向に隣り合うプレキャストブロック10の間にコンクリート60を打設することで、防液堤2の鉛直方向および周方向の目地17が形成される。防液堤2ではPC鋼材54によりプレストレスが導入される。PC鋼材54は、防液堤2の周方向と鉛直方向に設けられ、それぞれ防液堤2の周方向と鉛直方向の目地17を避けて配置される。これにより、防液堤が短期間で構築でき、工期短縮可能なタンク等が提供できる。
TANK AND METHOD FOR CONSTRUCTING DIKE
In an LNG tank 1, a dike 2 is formed by arranging precast blocks 10 in the circumferential direction of the dike 2 and layering the precast blocks 10 in the vertical direction. The precast blocks 10 are provided with loop joints on the top and bottom sides and the left and right sides thereof, and concrete 60 is deposited between precast blocks 10 adjacent in the circumferential direction and the vertical direction in the dike 2, whereby masonry joints 17 are formed in the vertical direction and the circumferential direction of the dike 2. Prestress is introduced in the dike 2 by PC steel 54. The PC steel 54 is provided in the circumferential direction and the vertical direction of the dike 2, and is arranged so as to avoid the masonry joints 17 in each of the circumferential direction and the vertical direction of the dike 2. The dike can thereby be constructed in a short time, and it is possible to provide a tank or the like for which the construction period can be reduced.
Selon l'invention, dans un réservoir de GNL (1), une digue (2) est formée par agencement de blocs préfabriqués (10) dans la direction circonférentielle de la digue (2) et superposition des blocs préfabriqués (10) dans la direction verticale. Les blocs préfabriqués (10) comportent des joints en boucle sur les côtés supérieur et inférieur et les côtés gauche et droit de ces derniers, et du béton (60) est déposé entre des blocs préfabriqués (10) adjacents dans la direction circonférentielle et dans la direction verticale dans la digue (2), ce par quoi des joints de maçonnerie (17) sont formés dans la direction verticale et la direction circonférentielle de la digue (2). Une précontrainte est introduite dans la digue (2) par de l'acier PC (54). L'acier PC (54) est prévu dans la direction circonférentielle et la direction verticale de la digue (2), et est agencé de manière à éviter les joints de maçonnerie (17), dans chacune de la direction circonférentielle et la direction verticale de la digue (2). La digue peut ainsi être construite en un temps court, et il est possible de fournir un réservoir ou analogue pour lequel la durée de construction peut être réduite.
LNGタンク1では、防液堤2が、プレキャストブロック10を防液堤2の周方向に並べるとともに鉛直方向に積層して形成される。プレキャストブロック10は、上下面と左右面にループ継手12を備え、防液堤2の周方向および鉛直方向に隣り合うプレキャストブロック10の間にコンクリート60を打設することで、防液堤2の鉛直方向および周方向の目地17が形成される。防液堤2ではPC鋼材54によりプレストレスが導入される。PC鋼材54は、防液堤2の周方向と鉛直方向に設けられ、それぞれ防液堤2の周方向と鉛直方向の目地17を避けて配置される。これにより、防液堤が短期間で構築でき、工期短縮可能なタンク等が提供できる。
TANK AND METHOD FOR CONSTRUCTING DIKE
RÉSERVOIR ET PROCÉDÉ DE CONSTRUCTION D'UNE DIGUE
タンク、防液堤の構築方法
MATSUURA MASANORI (Autor:in) / ICHINOMIYA TOSHIMICHI (Autor:in) / YANAI SHUJI (Autor:in) / WATANABE YUJI (Autor:in) / YOSHIWARA TOMOYOSHI (Autor:in) / YOSHIMURA SHINICHI (Autor:in) / MIZUTANI RYO (Autor:in) / OKUBO KAZUMASA (Autor:in) / FURUICHI KOSUKE (Autor:in) / YAMANOBE SHINICHI (Autor:in)
12.05.2016
Patent
Elektronische Ressource
Japanisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
/
B65D
Behältnisse zur Lagerung oder zum Transport von Gegenständen oder Materialien [Container], z.B. Säcke, Beutel, Fässer, Flaschen, Dosen, Kästen, Büchsen, Schachteln, Packkörbe, Tonnen, Gläser, Flüssigkeitsbehälter, Trichtersilos, Transportbehälter
,
CONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS
/
E04C
STRUCTURAL ELEMENTS
,
Bauelemente
/
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
PRECAST MEMBER, DIKE AND METHOD FOR CONSTRUCTING DIKE
Europäisches Patentamt | 2022
|