METHOD FOR REMOVING EARTH-RETAINING MEMBERS
[Problem] To provide a method by which the number of insertion pipes to be installed can be reduced, the time required for removal of earth-retaining members can be shortened, and construction costs can be reduced. [Solution] Provided is a method that comprises: a step for configuring five or more connected earth-retaining members as one block, inserting an injection pipe adjacent to or near the earth-retaining member positioned at the center of the block, and installing the injection pipe in the ground without fixing the injection pipe to the earth-retaining member; and a step for discharging an injection material from the injection pipe each time an earth-retaining member within the block is pulled up to a fixed height one-by-one so that the injection material flows into a space generated in the ground and fills the space.
L'invention aborde le problème de la réalisation d'un procédé qui permet de réduire le nombre de tuyaux d'insertion à installer, de raccourcir le temps nécessaire pour retirer des éléments de retenue de la terre, et de réduire les coûts de construction. L'invention réalise à cet effet un procédé qui comprend : une étape de configuration de cinq éléments de retenue de la terre ou plus reliés en un seul bloc, d'insertion d'un tuyau d'injection à côté ou à proximité de l'élément de retenue de la terre positionné au centre du bloc, et l'installation du tuyau d'injection dans le sol sans fixer le tuyau d'injection à l'élément de retenue de la terre ; et une étape de décharge d'un matériau d'injection depuis le tuyau d'injection à chaque fois que des éléments de retenue de la terre à l'intérieur du bloc sont tirés jusqu'à une hauteur définie un par un, de sorte que le matériau d'injection s'écoule dans un espace créé dans le sol et remplisse l'espace.
【課題】 挿入管を設置する本数を減らし、土留部材の撤去にかかる時間を短縮し、施工コストを削減することができる方法を提供する。 【解決手段】 この方法は、連設された5以上の土留部材を1つのブロックとし、ブロックの中央に位置する土留部材に隣接または近隣して注入管を挿入し、該土留部材に固定することなく地盤内に設置する工程と、ブロック内の土留部材を1つずつ順に一定高さ引き上げる毎に注入管から注入材を流出させて、地盤内に発生した空隙に該注入材を流入させ、該空隙を埋める工程とを含む。
METHOD FOR REMOVING EARTH-RETAINING MEMBERS
[Problem] To provide a method by which the number of insertion pipes to be installed can be reduced, the time required for removal of earth-retaining members can be shortened, and construction costs can be reduced. [Solution] Provided is a method that comprises: a step for configuring five or more connected earth-retaining members as one block, inserting an injection pipe adjacent to or near the earth-retaining member positioned at the center of the block, and installing the injection pipe in the ground without fixing the injection pipe to the earth-retaining member; and a step for discharging an injection material from the injection pipe each time an earth-retaining member within the block is pulled up to a fixed height one-by-one so that the injection material flows into a space generated in the ground and fills the space.
L'invention aborde le problème de la réalisation d'un procédé qui permet de réduire le nombre de tuyaux d'insertion à installer, de raccourcir le temps nécessaire pour retirer des éléments de retenue de la terre, et de réduire les coûts de construction. L'invention réalise à cet effet un procédé qui comprend : une étape de configuration de cinq éléments de retenue de la terre ou plus reliés en un seul bloc, d'insertion d'un tuyau d'injection à côté ou à proximité de l'élément de retenue de la terre positionné au centre du bloc, et l'installation du tuyau d'injection dans le sol sans fixer le tuyau d'injection à l'élément de retenue de la terre ; et une étape de décharge d'un matériau d'injection depuis le tuyau d'injection à chaque fois que des éléments de retenue de la terre à l'intérieur du bloc sont tirés jusqu'à une hauteur définie un par un, de sorte que le matériau d'injection s'écoule dans un espace créé dans le sol et remplisse l'espace.
【課題】 挿入管を設置する本数を減らし、土留部材の撤去にかかる時間を短縮し、施工コストを削減することができる方法を提供する。 【解決手段】 この方法は、連設された5以上の土留部材を1つのブロックとし、ブロックの中央に位置する土留部材に隣接または近隣して注入管を挿入し、該土留部材に固定することなく地盤内に設置する工程と、ブロック内の土留部材を1つずつ順に一定高さ引き上げる毎に注入管から注入材を流出させて、地盤内に発生した空隙に該注入材を流入させ、該空隙を埋める工程とを含む。
METHOD FOR REMOVING EARTH-RETAINING MEMBERS
PROCÉDÉ POUR RETIRER DES ÉLÉMENTS DE RETENUE DE LA TERRE
土留部材の撤去方法
YAMASHITA TAICHI (Autor:in) / WATANABE HIROAKI (Autor:in)
08.12.2016
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen