Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
UNIVERSAL BLOCK PLATFORM INTEGRATED PLATFORM BLOCK
A method includes mounting a platform deck block to a tower. The platform deck block (500) includes a first frame (515) defining a deck, a plurality of first conductor tubes (505) connected to the first frame, a first plurality of releasable connectors (520) coupled to the first conductor tubes, and a plurality of docking receptacles (800A,800B,800C) defined in the deck. The tower includes a second frame (415), a plurality of second conductor tubes (405) connected to the second frame, and a second plurality of releasable connectors (420) coupled to the second conductor tubes and engaging the first plurality of releasable connectors coupled to the first conductor tubes. The method further comprises mounting a first production block (600) to one of the plurality of docking receptacles.
Un procédé selon la présente invention comprend le montage d'un bloc de pont de plateforme sur une tour. Le bloc de pont de plateforme (500) comprend un premier cadre (515) définissant un pont, une pluralité de premiers tubes conducteurs (505) raccordés au premier cadre, une première pluralité de raccords libérables (520) accouplés aux premiers tubes conducteurs et une pluralité de réceptacles d'accueil (800A, 800B, 800C) définis dans le pont. La tour comporte un second cadre (415), une pluralité de seconds tubes conducteurs (405) raccordés au second cadre et une seconde pluralité de raccords libérables (420) accouplés aux seconds tubes conducteurs et venant en prise avec la première pluralité de raccords libérables accouplés aux premiers tubes conducteurs. Le procédé comprend en outre le montage d'un premier bloc de production (600) sur un réceptacle d'accueil de la pluralité de réceptacles d'accueil.
UNIVERSAL BLOCK PLATFORM INTEGRATED PLATFORM BLOCK
A method includes mounting a platform deck block to a tower. The platform deck block (500) includes a first frame (515) defining a deck, a plurality of first conductor tubes (505) connected to the first frame, a first plurality of releasable connectors (520) coupled to the first conductor tubes, and a plurality of docking receptacles (800A,800B,800C) defined in the deck. The tower includes a second frame (415), a plurality of second conductor tubes (405) connected to the second frame, and a second plurality of releasable connectors (420) coupled to the second conductor tubes and engaging the first plurality of releasable connectors coupled to the first conductor tubes. The method further comprises mounting a first production block (600) to one of the plurality of docking receptacles.
Un procédé selon la présente invention comprend le montage d'un bloc de pont de plateforme sur une tour. Le bloc de pont de plateforme (500) comprend un premier cadre (515) définissant un pont, une pluralité de premiers tubes conducteurs (505) raccordés au premier cadre, une première pluralité de raccords libérables (520) accouplés aux premiers tubes conducteurs et une pluralité de réceptacles d'accueil (800A, 800B, 800C) définis dans le pont. La tour comporte un second cadre (415), une pluralité de seconds tubes conducteurs (405) raccordés au second cadre et une seconde pluralité de raccords libérables (420) accouplés aux seconds tubes conducteurs et venant en prise avec la première pluralité de raccords libérables accouplés aux premiers tubes conducteurs. Le procédé comprend en outre le montage d'un premier bloc de production (600) sur un réceptacle d'accueil de la pluralité de réceptacles d'accueil.
UNIVERSAL BLOCK PLATFORM INTEGRATED PLATFORM BLOCK
BLOC DE PLATEFORME INTÉGRÉ DE PLATEFORME À BLOCS UNIVERSELLE
DUNCAN IAIN (Autor:in) / HORN GRAHAM (Autor:in) / AKHAVE SHREE (Autor:in)
13.06.2019
Patent
Elektronische Ressource
Englisch