Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
STEEL SHEET PILE JOINING METHOD, DRAWING TOOL, AND CONTINUOUS WALL
Provided is a steel sheet pile joining method in which a joint of a second steel sheet pile suspended from a crane is fit into a joint of a first steel sheet pile driven into the ground, wherein the steel sheet pile joining method comprises: a tool fixing step of fixing a drawing tool that has first and second elongated members to the first steel sheet pile so that the distal ends of the first and second elongated members are mutually separated, the joint of the first steel sheet pile is positioned between the first and the second elongated members in a planar view, and the lengths of the first and second elongated members extending to the second steel sheet pile side in the direction of the wall body is half of the width of the second steel sheet pile or greater; a moving step of moving the second steel sheet pile to between the first and the second elongated members; and a fitting step of lowering the second steel sheet pile and fitting the joint of the second steel sheet pile into the joint of the first steel sheet pile.
La présente invention concerne un procédé d'assemblage de palplanches en acier dans lequel un joint d'une seconde palplanche en acier suspendue à une grue est ajusté dans un joint d'une première palplanche en acier enfoncée dans le sol, le procédé d'assemblage de palplanches en acier comprenant : une étape de fixation d'outil consistant à fixer un outil d'étirage qui a des premier et second éléments allongés à la première palplanche en acier de telle sorte que les extrémités distales des premier et second éléments allongés sont mutuellement séparées, le joint de la première palplanche en acier étant positionné entre les premier et second éléments allongés dans une vue en plan, et les longueurs des premier et second éléments allongés s'étendant jusqu'au second côté de palplanche en acier dans la direction du corps de paroi représentant la moitié de la largeur de la seconde palplanche en acier ou plus ; une étape de déplacement consistant à déplacer la seconde palplanche en acier entre les premier et second éléments allongés ; et une étape d'ajustement consistant à abaisser la seconde palplanche en acier et à ajuster le joint de la seconde palplanche en acier dans le joint de la première palplanche en acier.
地盤に打設された第1の鋼矢板の継手部に、クレーンで吊り下げられた第2の鋼矢板の継手部を嵌合させる鋼矢板の連結方法であって、第1および第2の長尺部材を有する引き込み治具を、第1および第2の長尺部材の先端が互いに離間し、第1の鋼矢板の継手部が平面視で第1および第2の長尺部材の間に位置し、かつ第1および第2の長尺部材が壁体方向において第2の鋼矢板側へ延出する長さが第2の鋼矢板の幅の半分以上になるように、第1の鋼矢板に対して固定する治具固定工程と、第1および第2の長尺部材の間に第2の鋼矢板を移動させる移動工程と、第2の鋼矢板を下降させ、第2の鋼矢板の継手部を第1の鋼矢板の継手部に嵌合させる嵌合工程とを備える鋼矢板の連結方法が提供される。
STEEL SHEET PILE JOINING METHOD, DRAWING TOOL, AND CONTINUOUS WALL
Provided is a steel sheet pile joining method in which a joint of a second steel sheet pile suspended from a crane is fit into a joint of a first steel sheet pile driven into the ground, wherein the steel sheet pile joining method comprises: a tool fixing step of fixing a drawing tool that has first and second elongated members to the first steel sheet pile so that the distal ends of the first and second elongated members are mutually separated, the joint of the first steel sheet pile is positioned between the first and the second elongated members in a planar view, and the lengths of the first and second elongated members extending to the second steel sheet pile side in the direction of the wall body is half of the width of the second steel sheet pile or greater; a moving step of moving the second steel sheet pile to between the first and the second elongated members; and a fitting step of lowering the second steel sheet pile and fitting the joint of the second steel sheet pile into the joint of the first steel sheet pile.
La présente invention concerne un procédé d'assemblage de palplanches en acier dans lequel un joint d'une seconde palplanche en acier suspendue à une grue est ajusté dans un joint d'une première palplanche en acier enfoncée dans le sol, le procédé d'assemblage de palplanches en acier comprenant : une étape de fixation d'outil consistant à fixer un outil d'étirage qui a des premier et second éléments allongés à la première palplanche en acier de telle sorte que les extrémités distales des premier et second éléments allongés sont mutuellement séparées, le joint de la première palplanche en acier étant positionné entre les premier et second éléments allongés dans une vue en plan, et les longueurs des premier et second éléments allongés s'étendant jusqu'au second côté de palplanche en acier dans la direction du corps de paroi représentant la moitié de la largeur de la seconde palplanche en acier ou plus ; une étape de déplacement consistant à déplacer la seconde palplanche en acier entre les premier et second éléments allongés ; et une étape d'ajustement consistant à abaisser la seconde palplanche en acier et à ajuster le joint de la seconde palplanche en acier dans le joint de la première palplanche en acier.
地盤に打設された第1の鋼矢板の継手部に、クレーンで吊り下げられた第2の鋼矢板の継手部を嵌合させる鋼矢板の連結方法であって、第1および第2の長尺部材を有する引き込み治具を、第1および第2の長尺部材の先端が互いに離間し、第1の鋼矢板の継手部が平面視で第1および第2の長尺部材の間に位置し、かつ第1および第2の長尺部材が壁体方向において第2の鋼矢板側へ延出する長さが第2の鋼矢板の幅の半分以上になるように、第1の鋼矢板に対して固定する治具固定工程と、第1および第2の長尺部材の間に第2の鋼矢板を移動させる移動工程と、第2の鋼矢板を下降させ、第2の鋼矢板の継手部を第1の鋼矢板の継手部に嵌合させる嵌合工程とを備える鋼矢板の連結方法が提供される。
STEEL SHEET PILE JOINING METHOD, DRAWING TOOL, AND CONTINUOUS WALL
PROCÉDÉ D'ASSEMBLAGE DE PALPLANCHES EN ACIER, OUTIL D'ÉTIRAGE ET PAROI CONTINUE
鋼矢板の連結方法、引き込み治具、および連続壁
NAKAYAMA HIROAKI (Autor:in) / TAKENO MASAKAZU (Autor:in) / HARATA NORIYOSHI (Autor:in) / OOTOMO ISAO (Autor:in) / IIMURO KENICHIROU (Autor:in)
06.08.2020
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2016
|COMBINATION STEEL SHEET PILE, AND STEEL SHEET PILE WALL
Europäisches Patentamt | 2022
|