POSITIONING STEEL PILE WELDING PROCESS OF CUTTER SUCTION DREDGER
A positioning steel pile welding process of a cutter suction dredger. A steel pile is formed by assembling multiple barrel sections. The welding process comprises the following steps: step 1, performing preprocessing before plates are discharged; step 2, discharging the plates, reeling into the barrel sections, and before barrel section steel plates are reeled, performing arc-shaped pressing on two butt joint ends of longitudinal joints; step 3, welding the barrel sections according to a welding process; step 4, performing overall connection and assembly in butt joint on a roller assembly carrier by means of a segmented assembly scheme; and step 5, carrying out coating work after the steel pile is manufactured and passes inspection. The strength of the steel pile is high due to the welding process, and the requirements of high-precision positioning work are satisfied.
L'invention concerne un procédé de soudage de pieu en acier de positionnement d'une drague suceuse de coupe. Un pieu en acier est formé en assemblant de multiples sections de tube. Le procédé de soudage comprend les étapes suivantes : étape 1, réaliser un prétraitement avant que les plaques ne soient déchargées ; étape 2, décharger les plaques, les enrouler dans les sections de tube et, avant que les plaques d'acier de section de tube ne soient enroulées, réaliser un pressage en forme d'arc sur deux extrémités assemblées bout à bout de joints longitudinaux ; étape 3, souder les sections de tube selon un procédé de soudage ; étape 4, réaliser une liaison et un assemblage d'un seul tenant dans un assemblage bout à bout sur un support d'ensemble rouleau au moyen d'un schéma d'assemblage segmenté ; et l'étape 5, réaliser un travail de revêtement une fois que le pieu en acier est fabriqué et a été soumis à l'inspection avec succès. La résistance du pieu en acier est élevée en raison du procédé de soudage, et les exigences de travail de positionnement de haute précision sont satisfaites.
一种绞吸式挖泥船的定位钢桩焊接工艺,钢桩由若干筒节组装而成,所述焊接工艺包括以下步骤:步骤1、板材下料前进行预处理;步骤2、将板材下料卷制成筒节,筒节钢板卷制前现对纵缝对接两端进行弧形压制;步骤3、筒节按焊接工艺进行焊接;步骤4、采用分段组装方案滚轮胎架上进行整体拼装对接;步骤5、钢桩制作检验合格后进行涂装工作。该焊接工艺使钢桩的强度高,满足高精度定位作业的需要。
POSITIONING STEEL PILE WELDING PROCESS OF CUTTER SUCTION DREDGER
A positioning steel pile welding process of a cutter suction dredger. A steel pile is formed by assembling multiple barrel sections. The welding process comprises the following steps: step 1, performing preprocessing before plates are discharged; step 2, discharging the plates, reeling into the barrel sections, and before barrel section steel plates are reeled, performing arc-shaped pressing on two butt joint ends of longitudinal joints; step 3, welding the barrel sections according to a welding process; step 4, performing overall connection and assembly in butt joint on a roller assembly carrier by means of a segmented assembly scheme; and step 5, carrying out coating work after the steel pile is manufactured and passes inspection. The strength of the steel pile is high due to the welding process, and the requirements of high-precision positioning work are satisfied.
L'invention concerne un procédé de soudage de pieu en acier de positionnement d'une drague suceuse de coupe. Un pieu en acier est formé en assemblant de multiples sections de tube. Le procédé de soudage comprend les étapes suivantes : étape 1, réaliser un prétraitement avant que les plaques ne soient déchargées ; étape 2, décharger les plaques, les enrouler dans les sections de tube et, avant que les plaques d'acier de section de tube ne soient enroulées, réaliser un pressage en forme d'arc sur deux extrémités assemblées bout à bout de joints longitudinaux ; étape 3, souder les sections de tube selon un procédé de soudage ; étape 4, réaliser une liaison et un assemblage d'un seul tenant dans un assemblage bout à bout sur un support d'ensemble rouleau au moyen d'un schéma d'assemblage segmenté ; et l'étape 5, réaliser un travail de revêtement une fois que le pieu en acier est fabriqué et a été soumis à l'inspection avec succès. La résistance du pieu en acier est élevée en raison du procédé de soudage, et les exigences de travail de positionnement de haute précision sont satisfaites.
一种绞吸式挖泥船的定位钢桩焊接工艺,钢桩由若干筒节组装而成,所述焊接工艺包括以下步骤:步骤1、板材下料前进行预处理;步骤2、将板材下料卷制成筒节,筒节钢板卷制前现对纵缝对接两端进行弧形压制;步骤3、筒节按焊接工艺进行焊接;步骤4、采用分段组装方案滚轮胎架上进行整体拼装对接;步骤5、钢桩制作检验合格后进行涂装工作。该焊接工艺使钢桩的强度高,满足高精度定位作业的需要。
POSITIONING STEEL PILE WELDING PROCESS OF CUTTER SUCTION DREDGER
PROCÉDÉ DE SOUDAGE DE PIEU EN ACIER DE POSITIONNEMENT D'UNE DRAGUE SUCEUSE DE COUPE
一种绞吸式挖泥船的定位钢桩焊接工艺
LI ZHANPENG (Autor:in) / WANG HAIBO (Autor:in)
11.02.2021
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2024
|Cutter suction dredger steel pile head suitable for rock digging
Europäisches Patentamt | 2023
|British Library Online Contents | 1995
|Cutter suction dredger steel pile stress online monitoring and protecting system
Europäisches Patentamt | 2020
|