WEAK STRATUM-BASED REINFORCEMENT METHOD FOR SHIELD TUNNEL COVERED BY SHALLOW SOIL
A weak stratum (9)-based reinforcement method for a shield tunnel covered by shallow soil, comprising the following steps: S1, reinforcing a stratum (9) using triple-tube high-pressure jet grouting piles, wherein the reinforcement range is 2m on each of the top, bottom, left and right of a tunnel section; and S2, reinforcing inside of the tunnel, wherein shield tunneling in the stratum (9) covered by shallow soil employs a tube segment (5) that has added grouting holes (7), a shield tunneling mode employs earth pressure balance tunneling and ensures sufficient simultaneous grouting, once the tube segment (5) comes out of a shield tail, a double-liquid slurry is promptly injected for a second time to further improve the stability of the tube segment (5), the tube segment (5) comes out of an equipment bridge section behind the shield tail or the tube segment (5) comes out of a position behind a trolley, and a hollow grouting anchor rod (8) is used to carry out deep hole grouting reinforcement on the tunnel along lifting holes (6) or grouting holes (7).
Procédé de renforcement basé sur une strate faible (9) pour un tunnel à bouclier recouvert par un sol mince, lequel procédé comprend les étapes suivantes : S1, un renforcement d'une strate (9) à l'aide de pieux d'injection de coulis par jet à haute pression à triple tube, la plage de renforcement étant de 2 m sur chacune des parties supérieure, inférieure, gauche et droite d'une section de tunnel ; et S2, un renforcement d'un intérieur du tunnel, un creusement de tunnel au bouclier dans la strate (9) recouverte par un sol mince employant un segment de tube (5) qui a des trous d'injection de coulis ajoutés (7), un mode de creusement de tunnel au bouclier employant un creusement de tunnel d'équilibrage de pression de terre et assurant une injection de coulis simultanée suffisante, une fois que le segment de tube (5) sort d'une queue de bouclier, un coulis à double liquide étant rapidement injecté pendant un second temps pour améliorer encore davantage la stabilité du segment de tube (5), le segment de tube (5) sortant d'une section de pont d'équipement derrière la queue de bouclier ou le segment de tube (5) sortant d'une position derrière un chariot, et une tige d'ancrage d'injection de coulis creuse (8) étant utilisée pour réaliser un renforcement par injection de coulis en trou profond sur le tunnel le long de trous d'enlèvement (6) ou de trous d'injection de coulis (7).
一种基于软弱地层(9)的浅覆土盾构隧道加固方法,包括以下步骤:S1、采用三重管高压旋喷桩对地层(9)进行加固,加固范围为隧道断面上下、左右各2m;S2、隧道内加固,盾构在浅覆土地层(9)中掘进采用增加注浆孔(7)的管片(5),盾构掘进模式采用土压平衡掘进并保证足量的同步注浆,管片(5)脱出盾尾后及时二次注入双液浆以进一步提高管片(5)的稳定性,管片(5)脱出盾尾后的设备桥区段或管片(5)脱出台车后位置,采用中空注浆锚杆(8)沿着吊装孔(6)或注浆孔(7)对隧道进行深孔注浆加固。
WEAK STRATUM-BASED REINFORCEMENT METHOD FOR SHIELD TUNNEL COVERED BY SHALLOW SOIL
A weak stratum (9)-based reinforcement method for a shield tunnel covered by shallow soil, comprising the following steps: S1, reinforcing a stratum (9) using triple-tube high-pressure jet grouting piles, wherein the reinforcement range is 2m on each of the top, bottom, left and right of a tunnel section; and S2, reinforcing inside of the tunnel, wherein shield tunneling in the stratum (9) covered by shallow soil employs a tube segment (5) that has added grouting holes (7), a shield tunneling mode employs earth pressure balance tunneling and ensures sufficient simultaneous grouting, once the tube segment (5) comes out of a shield tail, a double-liquid slurry is promptly injected for a second time to further improve the stability of the tube segment (5), the tube segment (5) comes out of an equipment bridge section behind the shield tail or the tube segment (5) comes out of a position behind a trolley, and a hollow grouting anchor rod (8) is used to carry out deep hole grouting reinforcement on the tunnel along lifting holes (6) or grouting holes (7).
Procédé de renforcement basé sur une strate faible (9) pour un tunnel à bouclier recouvert par un sol mince, lequel procédé comprend les étapes suivantes : S1, un renforcement d'une strate (9) à l'aide de pieux d'injection de coulis par jet à haute pression à triple tube, la plage de renforcement étant de 2 m sur chacune des parties supérieure, inférieure, gauche et droite d'une section de tunnel ; et S2, un renforcement d'un intérieur du tunnel, un creusement de tunnel au bouclier dans la strate (9) recouverte par un sol mince employant un segment de tube (5) qui a des trous d'injection de coulis ajoutés (7), un mode de creusement de tunnel au bouclier employant un creusement de tunnel d'équilibrage de pression de terre et assurant une injection de coulis simultanée suffisante, une fois que le segment de tube (5) sort d'une queue de bouclier, un coulis à double liquide étant rapidement injecté pendant un second temps pour améliorer encore davantage la stabilité du segment de tube (5), le segment de tube (5) sortant d'une section de pont d'équipement derrière la queue de bouclier ou le segment de tube (5) sortant d'une position derrière un chariot, et une tige d'ancrage d'injection de coulis creuse (8) étant utilisée pour réaliser un renforcement par injection de coulis en trou profond sur le tunnel le long de trous d'enlèvement (6) ou de trous d'injection de coulis (7).
一种基于软弱地层(9)的浅覆土盾构隧道加固方法,包括以下步骤:S1、采用三重管高压旋喷桩对地层(9)进行加固,加固范围为隧道断面上下、左右各2m;S2、隧道内加固,盾构在浅覆土地层(9)中掘进采用增加注浆孔(7)的管片(5),盾构掘进模式采用土压平衡掘进并保证足量的同步注浆,管片(5)脱出盾尾后及时二次注入双液浆以进一步提高管片(5)的稳定性,管片(5)脱出盾尾后的设备桥区段或管片(5)脱出台车后位置,采用中空注浆锚杆(8)沿着吊装孔(6)或注浆孔(7)对隧道进行深孔注浆加固。
WEAK STRATUM-BASED REINFORCEMENT METHOD FOR SHIELD TUNNEL COVERED BY SHALLOW SOIL
PROCÉDÉ DE RENFORCEMENT BASÉ SUR UNE STRATE FAIBLE POUR TUNNEL À BOUCLIER RECOUVERT PAR UN SOL MINCE
基于软弱地层的浅覆土盾构隧道加固方法
WANG ZHONGREN (Autor:in) / YAN LIYA (Autor:in) / WANG YONGJUN (Autor:in) / WEN FAQING (Autor:in) / SUN LIANYONG (Autor:in) / LI QINGBIN (Autor:in) / QUAN ZONGGUO (Autor:in)
06.05.2021
Patent
Elektronische Ressource
Chinesisch
Weak stratum tunnel advanced deep-hole grouting reinforcement material
Europäisches Patentamt | 2016
|Analysis the Effect of Grouting Pressure on Shallow Soil Thickness which Covered the Shield Tunnel
British Library Conference Proceedings | 2015
|Analysis the Effect of Grouting Pressure on Shallow Soil Thickness which Covered the Shield Tunnel
Trans Tech Publications | 2014
|Shallow burial soil area shield driving stratum strengthening system and construction method thereof
Europäisches Patentamt | 2015
|Construction method of reinforcing structure of shallow soil-covered slope of inclined rock stratum
Europäisches Patentamt | 2023
|