SINGLE-SIDE INTEGRAL HOISTED LARGE-SPAN OVERBRIDGE CROSSING OVER MULTIPLE RAILWAY LINES, AND CONSTRUCTION METHOD THEREFOR
Disclosed are a single-side integral hoisted large-span overbridge crossing over multiple railway lines, and a construction method therefor. The single-side integral hoisted large-span overbridge crossing over multiple railway lines is of a steel truss structure crossing over multiple railway lines (5), and comprises an overbridge middle span (1) and overbridge side spans (2), wherein the overbridge middle span (1) is fixed on reinforced concrete upright posts (3) by means of fixing and positioning devices (4), and the overbridge side spans (2) are positioned and fixed by means of the fixing and positioning devices (4). The construction method for the single-side integral hoisted large-span overbridge crossing over multiple railway lines comprises the following steps: S1, preparation for construction; S2, erecting an assembly jig frame; S3, assembling a single side truss; S4, continuing to assemble a single truss on the other side; S5, sequentially assembling the two trusses to form a stable space structure system; S6, constructing an auxiliary structure; S7, hoisting an overbridge middle span (1); S8, assembling overbridge side spans (2); S9, constructing residual decoration and installation projects; and S10, dismounting an overbridge assembly-type temporary protective guard. The single-side integral hoisted large-span overbridge crossing over multiple railway lines is easy and fast to assemble and is short in terms of installation time, thereby shortening the construction window application time of existing lines, and reducing the influence on running lines.
L'invention concerne un pont superposé à grande portée intégralement hissé à face simple, traversant de multiples lignes de chemin de fer, et son procédé de construction. Le pont superposé à grande portée intégralement hissé à face simple traversant de multiples lignes de chemin de fer, est constitué d'une structure en fermes en acier traversant de multiples lignes de chemin de fer (5), et comprend une travée médiane de pont superposé (1) et des travées latérales de pont superposé (2), la zone intermédiaire de pont superposé (1) étant fixée sur des montants verticaux en béton armé (3) au moyen de dispositifs de fixation et de positionnement (4), et les travées latérales de pont superposé (2) étant positionnées et fixées au moyen des dispositifs de fixation et de positionnement (4). Le procédé de construction pour le pont superposé à grande portée intégralement hissé à face simple traversant de multiples lignes de chemin de fer comprend les étapes suivantes consistant à : S1, se préparer pour la construction ; S2, ériger un cadre de gabarit d'assemblage ; S3, assembler une ferme latérale simple ; S4, continuer à assembler une ferme simple sur l'autre côté ; S5, assembler séquentiellement des deux fermes pour former un système de structure d'espace stable ; S6, construire une structure auxiliaire ; S7, lever une travée centrale de pont superposé (1) ; S8, assembler des travées latérales de pont superposé (2) ; S9, construire les projets de décoration et d'installation résiduels ; et S10, démonter une cloison de sécurité temporaire à assemblage de pont superposé. Le pont superposé à grande portée intégralement hissé à face simple traversant de multiples lignes de chemin de fer, est facile et rapide à assembler et est court en termes de temps d'installation, ce qui permet de raccourcir le temps d'application de fenêtre de construction de lignes existantes, et de réduire l'influence sur les lignes de déplacement.
一种下跨多条铁路营业线单侧整体吊装大跨度天桥及其施工方法,其中,下跨多条铁路营业线单侧整体吊装大跨度天桥为下跨多条铁路营业线(5)的钢桁架结构,包括天桥中跨(1)、天桥边跨(2),天桥中跨(1)通过固定定位装置(4)固定在钢筋混凝土立柱(3)上,天桥边跨(2)通过固定定位装置(4)进行定位固定;下跨多条铁路营业线单侧整体吊装大跨度天桥的施工方法包括以下步骤:S1:施工准备;S2:搭设拼装胎架;S3:拼装单片侧面桁架;S4:继续拼装另一侧单榀桁架;S5:依次拼装两榀桁架形成空间稳定结构体系;S6:施工附属结构;S7:吊装天桥中跨(1);S8:拼装天桥边跨(2);S9:施工剩余装修安装工程;S10:拆除天桥装配式临时防护栏。该下跨多条铁路营业线单侧整体吊装大跨度天桥拼装便捷、安装周期短,减少了既有线施工窗口申请时间,减少了对运行线路的影响。
SINGLE-SIDE INTEGRAL HOISTED LARGE-SPAN OVERBRIDGE CROSSING OVER MULTIPLE RAILWAY LINES, AND CONSTRUCTION METHOD THEREFOR
Disclosed are a single-side integral hoisted large-span overbridge crossing over multiple railway lines, and a construction method therefor. The single-side integral hoisted large-span overbridge crossing over multiple railway lines is of a steel truss structure crossing over multiple railway lines (5), and comprises an overbridge middle span (1) and overbridge side spans (2), wherein the overbridge middle span (1) is fixed on reinforced concrete upright posts (3) by means of fixing and positioning devices (4), and the overbridge side spans (2) are positioned and fixed by means of the fixing and positioning devices (4). The construction method for the single-side integral hoisted large-span overbridge crossing over multiple railway lines comprises the following steps: S1, preparation for construction; S2, erecting an assembly jig frame; S3, assembling a single side truss; S4, continuing to assemble a single truss on the other side; S5, sequentially assembling the two trusses to form a stable space structure system; S6, constructing an auxiliary structure; S7, hoisting an overbridge middle span (1); S8, assembling overbridge side spans (2); S9, constructing residual decoration and installation projects; and S10, dismounting an overbridge assembly-type temporary protective guard. The single-side integral hoisted large-span overbridge crossing over multiple railway lines is easy and fast to assemble and is short in terms of installation time, thereby shortening the construction window application time of existing lines, and reducing the influence on running lines.
L'invention concerne un pont superposé à grande portée intégralement hissé à face simple, traversant de multiples lignes de chemin de fer, et son procédé de construction. Le pont superposé à grande portée intégralement hissé à face simple traversant de multiples lignes de chemin de fer, est constitué d'une structure en fermes en acier traversant de multiples lignes de chemin de fer (5), et comprend une travée médiane de pont superposé (1) et des travées latérales de pont superposé (2), la zone intermédiaire de pont superposé (1) étant fixée sur des montants verticaux en béton armé (3) au moyen de dispositifs de fixation et de positionnement (4), et les travées latérales de pont superposé (2) étant positionnées et fixées au moyen des dispositifs de fixation et de positionnement (4). Le procédé de construction pour le pont superposé à grande portée intégralement hissé à face simple traversant de multiples lignes de chemin de fer comprend les étapes suivantes consistant à : S1, se préparer pour la construction ; S2, ériger un cadre de gabarit d'assemblage ; S3, assembler une ferme latérale simple ; S4, continuer à assembler une ferme simple sur l'autre côté ; S5, assembler séquentiellement des deux fermes pour former un système de structure d'espace stable ; S6, construire une structure auxiliaire ; S7, lever une travée centrale de pont superposé (1) ; S8, assembler des travées latérales de pont superposé (2) ; S9, construire les projets de décoration et d'installation résiduels ; et S10, démonter une cloison de sécurité temporaire à assemblage de pont superposé. Le pont superposé à grande portée intégralement hissé à face simple traversant de multiples lignes de chemin de fer, est facile et rapide à assembler et est court en termes de temps d'installation, ce qui permet de raccourcir le temps d'application de fenêtre de construction de lignes existantes, et de réduire l'influence sur les lignes de déplacement.
一种下跨多条铁路营业线单侧整体吊装大跨度天桥及其施工方法,其中,下跨多条铁路营业线单侧整体吊装大跨度天桥为下跨多条铁路营业线(5)的钢桁架结构,包括天桥中跨(1)、天桥边跨(2),天桥中跨(1)通过固定定位装置(4)固定在钢筋混凝土立柱(3)上,天桥边跨(2)通过固定定位装置(4)进行定位固定;下跨多条铁路营业线单侧整体吊装大跨度天桥的施工方法包括以下步骤:S1:施工准备;S2:搭设拼装胎架;S3:拼装单片侧面桁架;S4:继续拼装另一侧单榀桁架;S5:依次拼装两榀桁架形成空间稳定结构体系;S6:施工附属结构;S7:吊装天桥中跨(1);S8:拼装天桥边跨(2);S9:施工剩余装修安装工程;S10:拆除天桥装配式临时防护栏。该下跨多条铁路营业线单侧整体吊装大跨度天桥拼装便捷、安装周期短,减少了既有线施工窗口申请时间,减少了对运行线路的影响。
SINGLE-SIDE INTEGRAL HOISTED LARGE-SPAN OVERBRIDGE CROSSING OVER MULTIPLE RAILWAY LINES, AND CONSTRUCTION METHOD THEREFOR
PONT SUPERPOSÉ À GRANDE PORTÉE INTÉGRALEMENT HISSÉ À FACE SIMPLE TRAVERSANT DE MULTIPLES LIGNES DE CHEMIN DE FER, ET SON PROCÉDÉ DE CONSTRUCTION
下跨多条铁路营业线单侧整体吊装大跨度天桥及施工方法
LI YUNLONG (Autor:in) / FAN RONGSHENG (Autor:in) / ZHANG YUNZHI (Autor:in) / ZHANG ZHENGSHAN (Autor:in) / DI BO (Autor:in) / CHENG XIURU (Autor:in) / HU XIANQIAN (Autor:in) / ZHAO LONG (Autor:in) / YAN LIPING (Autor:in) / LV JIANDA (Autor:in)
29.07.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Europäisches Patentamt | 2020
|Method for dismantling continuous-crossing large-span cast-in-place overbridge on road
Europäisches Patentamt | 2024
|Construction Report - Construction Report: Launching of foot overbridge at Akola railway station
Online Contents | 1999
|