CONSTRUCTION METHOD FOR REPLACEMENT OF GIRDER STRUCTURE OF BRIDGE
The present invention relates to the technical field of bridge construction, and in particular to a construction method for the replacement of a girder structure of a bridge. According to the present invention, an old girder serves as both a construction access and a nose girder for a new girder; the demolition of the old girder and the installation of a new girder are carried out throughout the dragging process, thereby reducing the size of the temporary girder storage site; by means of the uninterrupted continuous dragging, the construction period is effectively shortened, and the cost is reduced; and no water-related project is involved, which is conducive to flood discharge and environmental protection. The present invention is applicable to the replacement of girders of existing long and large steel bridges on highways and railways, and can be popularized in reconstruction projects for steel bridges on existing lines.
La présente invention relève du domaine technique de la construction de pont et concerne en particulier, un procédé de construction pour le remplacement d'une structure de poutre d'un pont. Selon la présente invention, une ancienne poutre sert à la fois d'accès de construction et de poutre de nez pour une nouvelle poutre; la démolition de l'ancienne poutre et l'installation d'une nouvelle poutre sont réalisées tout au long du processus de traction, ce qui permet de réduire la taille du site de stockage temporaire de la poutre; au moyen d'une traction continue ininterrompue, la période de construction est raccourcie de manière efficace, et le coût est réduit; et aucun projet lié à l'eau n'est impliqué, ce qui est favorable à l'évacuation des inondations et à la protection de l'environnement. La présente invention peut être appliquée au remplacement des poutres de ponts en acier longs et larges existants sur des autoroutes et des chemins de fer, et peut être rendue populaire dans des projets de reconstruction pour des ponts en acier sur des lignes existantes.
本发明涉及桥梁施工技术领域,具体而言,涉及一种桥梁梁部结构更换施工方法。本发明通过将旧梁兼做施工通道及新梁的导梁;拆除旧梁和安装新梁贯穿整个拖拉过程,减小临时存梁场地;通过不间断连续拖拉有效缩短工期、降低成本;没有涉水工程,有利于行洪和环保要求。本发明适用于公路、铁路既有长大钢桥梁部的更换,可以在既有线钢桥改造工程中推广。
CONSTRUCTION METHOD FOR REPLACEMENT OF GIRDER STRUCTURE OF BRIDGE
The present invention relates to the technical field of bridge construction, and in particular to a construction method for the replacement of a girder structure of a bridge. According to the present invention, an old girder serves as both a construction access and a nose girder for a new girder; the demolition of the old girder and the installation of a new girder are carried out throughout the dragging process, thereby reducing the size of the temporary girder storage site; by means of the uninterrupted continuous dragging, the construction period is effectively shortened, and the cost is reduced; and no water-related project is involved, which is conducive to flood discharge and environmental protection. The present invention is applicable to the replacement of girders of existing long and large steel bridges on highways and railways, and can be popularized in reconstruction projects for steel bridges on existing lines.
La présente invention relève du domaine technique de la construction de pont et concerne en particulier, un procédé de construction pour le remplacement d'une structure de poutre d'un pont. Selon la présente invention, une ancienne poutre sert à la fois d'accès de construction et de poutre de nez pour une nouvelle poutre; la démolition de l'ancienne poutre et l'installation d'une nouvelle poutre sont réalisées tout au long du processus de traction, ce qui permet de réduire la taille du site de stockage temporaire de la poutre; au moyen d'une traction continue ininterrompue, la période de construction est raccourcie de manière efficace, et le coût est réduit; et aucun projet lié à l'eau n'est impliqué, ce qui est favorable à l'évacuation des inondations et à la protection de l'environnement. La présente invention peut être appliquée au remplacement des poutres de ponts en acier longs et larges existants sur des autoroutes et des chemins de fer, et peut être rendue populaire dans des projets de reconstruction pour des ponts en acier sur des lignes existantes.
本发明涉及桥梁施工技术领域,具体而言,涉及一种桥梁梁部结构更换施工方法。本发明通过将旧梁兼做施工通道及新梁的导梁;拆除旧梁和安装新梁贯穿整个拖拉过程,减小临时存梁场地;通过不间断连续拖拉有效缩短工期、降低成本;没有涉水工程,有利于行洪和环保要求。本发明适用于公路、铁路既有长大钢桥梁部的更换,可以在既有线钢桥改造工程中推广。
CONSTRUCTION METHOD FOR REPLACEMENT OF GIRDER STRUCTURE OF BRIDGE
PROCÉDÉ DE CONSTRUCTION POUR LE REMPLACEMENT D'UNE STRUCTURE DE POUTRE D'UN PONT
一种桥梁梁部结构更换施工方法
GUO ZIYU (Autor:in) / XU SHENGQIAO (Autor:in) / SHEN PING (Autor:in) / GAO JINGQING (Autor:in) / FENG QI (Autor:in) / YIN BIN (Autor:in) / YU PENG (Autor:in) / CHEN JINCHANG (Autor:in) / JIANG ZEJUN (Autor:in)
23.12.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
RAPID BRIDGE REPLACEMENT CONSTRUCTION METHOD USING THROUGH BRIDGE GIRDER SEGMENT
Europäisches Patentamt | 2016
|STEEL GIRDER USING THROUGH BRIDGE GIRDER SEGMENT FOR RAPID BRIDGE REPLACEMENT
Europäisches Patentamt | 2017
|GIRDER BRIDGE CONSTRUCTION METHOD OF PRESTRESSED GIRDER
Europäisches Patentamt | 2021
GIRDER BRIDGE CONSTRUCTION METHOD OF PRESTRESSED GIRDER
Europäisches Patentamt | 2020
|