TEMPORARY PASSAGE CONSTRUCTION METHOD EMPLOYING SUPPORT STRUCTURE IN DEEP FOUNDATION PIT
The present invention relates to the technical fields of foundation pit support construction and earth excavation. Disclosed is a temporary passage construction method employing a support structure in a deep foundation pit. The method comprises the following steps: S11, constructing a first intra-layer support; S12, constructing a first-stage temporary ramp, and excavating a first layer of earth to the bottom of a second intra-layer support; S13, constructing the second intra-layer support, and performing pouring to form a first-stage variable slope platform between support beams of the second intra-layer support, wherein the first-stage variable slope platform communicates with the first-stage temporary ramp; S14, constructing a second-stage temporary ramp, and excavating a second layer of earth to the bottom of a third intra-layer support; S15, constructing the third intra-layer support, and performing pouring to form a second-stage variable slope platform between support beams of the third intra-layer support, wherein the second-stage variable slope platform communicates with the second-stage temporary ramp; and S16, in the same manner as in steps S12 to S15, performing construction downwards in a foundation pit until the excavation reaches the bottom of the foundation pit. The temporary passage construction method employing a support structure in a deep foundation pit provided by the technical solution of the present invention greatly reduces time, conserves manpower, and reduces costs.
La présente invention se rapporte aux domaines techniques de la construction de support de fosse de fondation et de l'excavation de terre. L'invention concerne un procédé de construction de passage temporaire utilisant une structure de support dans une fosse de fondation profonde. Le procédé comprend les étapes suivantes consistant à : S11, construire un premier support entre couches; S12, construire une rampe temporaire de premier étage, et excaver une première couche de terre jusqu'à la partie inférieure d'un deuxième support entre couches; S13, construire le deuxième support entre couches, et réaliser un coulage pour former une plateforme de pente variable de premier étage entre des poutres de support du deuxième support entre couches, la plateforme de pente variable de premier étage communiquant avec la rampe temporaire de premier étage; S14, construire une rampe temporaire de deuxième étage, et excaver une deuxième couche de terre jusqu'à la partie inférieure d'un troisième support entre couches; S15, construire le troisième support entre couches, et réaliser un coulage pour former une plateforme de pente variable de deuxième étage entre des poutres de support du troisième support entre couches, la plateforme de pente variable de deuxième étage communiquant avec la rampe temporaire de deuxième étage; et S16, de la même manière que dans les étapes S12 à S15, réaliser une construction vers le bas dans une fosse de fondation jusqu'à ce que l'excavation atteigne le fond de la fosse de fondation. Le procédé de construction de passage temporaire utilisant une structure de support dans une fosse de fondation profonde que fournit la solution technique de la présente invention réduit considérablement le temps, économise la main d'œuvre et réduit les coûts.
本发明涉及建筑基坑支护与土方开挖的技术领域,公开了一种基于深基坑内支撑结构的临时通道施工方法,包括以下步骤:S11,施工第一层内支撑;S12,施工一级临时坡道,开挖第一层土方至第二层内支撑底部;S13,施工第二层内支撑,并在第二层内支撑的支撑梁之间浇筑一级变坡平台,一级变坡平台连通一级临时坡道;S14,施工二级临时坡道,开挖第二层土方至第三层内支撑底部;S15,施工第三层内支撑,并在第三层内支撑的支撑梁之间浇筑二级变坡平台,二级变坡平台连通二级临时坡道;S16,依照S12至S15类推,在基坑内朝下施工,直至开挖至基坑底部。本发明技术方案给出的基于深基坑内支撑结构的临时通道施工方法,节省了大量的时间、人力及财力。
TEMPORARY PASSAGE CONSTRUCTION METHOD EMPLOYING SUPPORT STRUCTURE IN DEEP FOUNDATION PIT
The present invention relates to the technical fields of foundation pit support construction and earth excavation. Disclosed is a temporary passage construction method employing a support structure in a deep foundation pit. The method comprises the following steps: S11, constructing a first intra-layer support; S12, constructing a first-stage temporary ramp, and excavating a first layer of earth to the bottom of a second intra-layer support; S13, constructing the second intra-layer support, and performing pouring to form a first-stage variable slope platform between support beams of the second intra-layer support, wherein the first-stage variable slope platform communicates with the first-stage temporary ramp; S14, constructing a second-stage temporary ramp, and excavating a second layer of earth to the bottom of a third intra-layer support; S15, constructing the third intra-layer support, and performing pouring to form a second-stage variable slope platform between support beams of the third intra-layer support, wherein the second-stage variable slope platform communicates with the second-stage temporary ramp; and S16, in the same manner as in steps S12 to S15, performing construction downwards in a foundation pit until the excavation reaches the bottom of the foundation pit. The temporary passage construction method employing a support structure in a deep foundation pit provided by the technical solution of the present invention greatly reduces time, conserves manpower, and reduces costs.
La présente invention se rapporte aux domaines techniques de la construction de support de fosse de fondation et de l'excavation de terre. L'invention concerne un procédé de construction de passage temporaire utilisant une structure de support dans une fosse de fondation profonde. Le procédé comprend les étapes suivantes consistant à : S11, construire un premier support entre couches; S12, construire une rampe temporaire de premier étage, et excaver une première couche de terre jusqu'à la partie inférieure d'un deuxième support entre couches; S13, construire le deuxième support entre couches, et réaliser un coulage pour former une plateforme de pente variable de premier étage entre des poutres de support du deuxième support entre couches, la plateforme de pente variable de premier étage communiquant avec la rampe temporaire de premier étage; S14, construire une rampe temporaire de deuxième étage, et excaver une deuxième couche de terre jusqu'à la partie inférieure d'un troisième support entre couches; S15, construire le troisième support entre couches, et réaliser un coulage pour former une plateforme de pente variable de deuxième étage entre des poutres de support du troisième support entre couches, la plateforme de pente variable de deuxième étage communiquant avec la rampe temporaire de deuxième étage; et S16, de la même manière que dans les étapes S12 à S15, réaliser une construction vers le bas dans une fosse de fondation jusqu'à ce que l'excavation atteigne le fond de la fosse de fondation. Le procédé de construction de passage temporaire utilisant une structure de support dans une fosse de fondation profonde que fournit la solution technique de la présente invention réduit considérablement le temps, économise la main d'œuvre et réduit les coûts.
本发明涉及建筑基坑支护与土方开挖的技术领域,公开了一种基于深基坑内支撑结构的临时通道施工方法,包括以下步骤:S11,施工第一层内支撑;S12,施工一级临时坡道,开挖第一层土方至第二层内支撑底部;S13,施工第二层内支撑,并在第二层内支撑的支撑梁之间浇筑一级变坡平台,一级变坡平台连通一级临时坡道;S14,施工二级临时坡道,开挖第二层土方至第三层内支撑底部;S15,施工第三层内支撑,并在第三层内支撑的支撑梁之间浇筑二级变坡平台,二级变坡平台连通二级临时坡道;S16,依照S12至S15类推,在基坑内朝下施工,直至开挖至基坑底部。本发明技术方案给出的基于深基坑内支撑结构的临时通道施工方法,节省了大量的时间、人力及财力。
TEMPORARY PASSAGE CONSTRUCTION METHOD EMPLOYING SUPPORT STRUCTURE IN DEEP FOUNDATION PIT
PROCÉDÉ DE CONSTRUCTION DE PASSAGE TEMPORAIRE UTILISANT UNE STRUCTURE DE SUPPORT DANS UNE FOSSE DE FONDATION PROFONDE
基于深基坑内支撑结构的临时通道施工方法
LEI BIN (Autor:in) / YE KUN (Autor:in) / LI SHUQING (Autor:in) / ZHENG QIAHE (Autor:in) / CHEN MING (Autor:in) / JI JIANFENG (Autor:in) / JIANG PENG (Autor:in) / LIN ZHUONAN (Autor:in)
27.01.2022
Patent
Elektronische Ressource
Chinesisch
Construction method of temporary passage based on deep foundation pit inner supporting structure
Europäisches Patentamt | 2020
|TEMPORARY FOUNDATION STRUCTURE AND CONSTRUCTION METHOD OF TEMPORARY FOUNDATION STRUCTURE
Europäisches Patentamt | 2024
|Foundation pit temporary support changing structure and construction method thereof
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2022
|Temporary supporting structure for foundation pit construction and temporary construction method
Europäisches Patentamt | 2020
|