ANTI-SEEPAGE CONCRETE PROGRESSIVE STRUCTURE FOR UNDERGROUND GOAF AND CONSTRUCTION METHOD THEREFOR
Disclosed is an anti-seepage concrete progressive structure for an underground goaf. The structure solves the problem of the pollution of underground water by chemicals and harmful chemical components in tailings. In the anti-seepage concrete progressive structure, an anti-seepage concrete base layer (2) is laid at the bottom of a goaf (1), a plurality of layers of anti-seepage bodies (3) are arranged on an inner side wall of the goaf (1) from bottom to top, and an anti-seepage concrete wall (4) is arranged at an access to the goaf (1). A construction method for the anti-seepage concrete progressive structure for an underground goaf is further disclosed. The construction method comprises the following steps: pumping anti-seepage concrete to the bottom of a goaf (1) to form an anti-seepage concrete base layer (2); pumping quick-setting anti-seepage concrete along the lower end of an inner side wall of the goaf to form a first layer of anti-seepage bodies (3), and then filling a first layer of tailings (5); pumping a second layer of quick-setting anti-seepage concrete along the inner side wall of the goaf, and filling a second layer of tailings (5); repeating the operations in this way; and pouring an anti-seepage concrete wall (4) at an access to the goaf.
Une structure progressive en béton anti-infiltration pour remblai souterrain est divulguée. La structure résout le problème de la pollution de l'eau souterraine par des produits chimiques et des composants chimiques nocifs dans les résidus. Dans la structure progressive en béton anti-infiltration, une couche de base en béton anti-infiltration (2) est posée au fond d'un remblai (1), plusieurs couches de corps anti-infiltration (3) sont disposées sur une paroi latérale interne du remblai (1) de bas en haut, et une paroi en béton anti-infiltration (4) est disposée au niveau d'un accès au remblai (1). Un procédé de construction de la structure progressive en béton anti-infiltration destinée à un remblai souterrain est en outre divulgué. Le procédé de construction consiste : à pomper du béton anti-infiltration vers le fond d'un remblai (1) pour former une couche de base en béton anti-infiltration (2) ; à pomper du béton anti-infiltration à prise rapide le long de l'extrémité inférieure d'une paroi latérale interne du remblai pour former une première couche de corps anti-infiltration (3), puis à remplir une première couche de résidus (5) ; à pomper une seconde couche de béton anti-infiltration à prise rapide le long de la paroi latérale interne du remblai, et à remplir une seconde couche de résidus (5) ; à répéter les opérations de cette manière ; et à verser une paroi en béton anti-infiltration (4) au niveau d'un accès au remblai.
公开了一种用于地下采空区的防渗混凝土渐进结构,其解决了尾砂中的药剂和有害化学成分污染地下水的问题。该防渗混凝土渐进结构在采空区(1)的底部铺设有防渗混凝土底层(2),在采空区(1)的内侧壁由下至上设有多层防渗体(3),在采空区(1)的出入口处设有防渗混凝土墙(4)。还公开了一种用于地下采空区的防渗混凝土渐进结构的施工方法,其包括以下步骤:向采空区(1)底部泵送防渗混凝土,形成防渗混凝土底层(2);沿采空区内侧壁下端泵送快凝防渗混凝土,形成第一层防渗体(3),然后进行第一层尾砂(5)的填充;沿采空区内侧壁泵送第二层快凝防渗混凝土,填充第二层尾砂(5);如此重复操作;在采空区的出入口处浇筑防渗混凝土墙(4)。
ANTI-SEEPAGE CONCRETE PROGRESSIVE STRUCTURE FOR UNDERGROUND GOAF AND CONSTRUCTION METHOD THEREFOR
Disclosed is an anti-seepage concrete progressive structure for an underground goaf. The structure solves the problem of the pollution of underground water by chemicals and harmful chemical components in tailings. In the anti-seepage concrete progressive structure, an anti-seepage concrete base layer (2) is laid at the bottom of a goaf (1), a plurality of layers of anti-seepage bodies (3) are arranged on an inner side wall of the goaf (1) from bottom to top, and an anti-seepage concrete wall (4) is arranged at an access to the goaf (1). A construction method for the anti-seepage concrete progressive structure for an underground goaf is further disclosed. The construction method comprises the following steps: pumping anti-seepage concrete to the bottom of a goaf (1) to form an anti-seepage concrete base layer (2); pumping quick-setting anti-seepage concrete along the lower end of an inner side wall of the goaf to form a first layer of anti-seepage bodies (3), and then filling a first layer of tailings (5); pumping a second layer of quick-setting anti-seepage concrete along the inner side wall of the goaf, and filling a second layer of tailings (5); repeating the operations in this way; and pouring an anti-seepage concrete wall (4) at an access to the goaf.
Une structure progressive en béton anti-infiltration pour remblai souterrain est divulguée. La structure résout le problème de la pollution de l'eau souterraine par des produits chimiques et des composants chimiques nocifs dans les résidus. Dans la structure progressive en béton anti-infiltration, une couche de base en béton anti-infiltration (2) est posée au fond d'un remblai (1), plusieurs couches de corps anti-infiltration (3) sont disposées sur une paroi latérale interne du remblai (1) de bas en haut, et une paroi en béton anti-infiltration (4) est disposée au niveau d'un accès au remblai (1). Un procédé de construction de la structure progressive en béton anti-infiltration destinée à un remblai souterrain est en outre divulgué. Le procédé de construction consiste : à pomper du béton anti-infiltration vers le fond d'un remblai (1) pour former une couche de base en béton anti-infiltration (2) ; à pomper du béton anti-infiltration à prise rapide le long de l'extrémité inférieure d'une paroi latérale interne du remblai pour former une première couche de corps anti-infiltration (3), puis à remplir une première couche de résidus (5) ; à pomper une seconde couche de béton anti-infiltration à prise rapide le long de la paroi latérale interne du remblai, et à remplir une seconde couche de résidus (5) ; à répéter les opérations de cette manière ; et à verser une paroi en béton anti-infiltration (4) au niveau d'un accès au remblai.
公开了一种用于地下采空区的防渗混凝土渐进结构,其解决了尾砂中的药剂和有害化学成分污染地下水的问题。该防渗混凝土渐进结构在采空区(1)的底部铺设有防渗混凝土底层(2),在采空区(1)的内侧壁由下至上设有多层防渗体(3),在采空区(1)的出入口处设有防渗混凝土墙(4)。还公开了一种用于地下采空区的防渗混凝土渐进结构的施工方法,其包括以下步骤:向采空区(1)底部泵送防渗混凝土,形成防渗混凝土底层(2);沿采空区内侧壁下端泵送快凝防渗混凝土,形成第一层防渗体(3),然后进行第一层尾砂(5)的填充;沿采空区内侧壁泵送第二层快凝防渗混凝土,填充第二层尾砂(5);如此重复操作;在采空区的出入口处浇筑防渗混凝土墙(4)。
ANTI-SEEPAGE CONCRETE PROGRESSIVE STRUCTURE FOR UNDERGROUND GOAF AND CONSTRUCTION METHOD THEREFOR
STRUCTURE PROGRESSIVE EN BÉTON ANTI-INFILTRATION POUR REMBLAI SOUTERRAIN ET SON PROCÉDÉ DE CONSTRUCTION
一种用于地下采空区的防渗混凝土渐进结构及其施工方法
CHEN TIANLEI (Autor:in) / LI YING (Autor:in) / WANG PEIXIN (Autor:in)
15.09.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
/
E21D
SHAFTS
,
Schächte
/
E21F
Sicherheitsvorrichtungen, Förderung, Auffüllen oder Bergversatz, Rettungswesen, Bewetterung oder Entwässerung in oder von Gruben oder Tunnels
,
SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINAGE IN OR OF MINES OR TUNNELS
Anti-seepage concrete progressive structure for underground goaf and construction method thereof
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2024
|Underground diaphragm wall anti-seepage construction method
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2021
|