Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
METHOD OF REPLACING A TRANSITION STRUCTURE, TRANSITION STRUCTURE FOR BRIDGING A CONSTRUCTION JOINT LOCATED IN A BUILDING, AND BUILDING WITH A TRANSITION STRUCTURE
Method of replacing an old transition structure (1) for bridging a structural joint (3) located in a building (2) by a new transition structure (4). Furthermore, a new transition structure (4) for bridging a construction joint (3) in a building (2) is disclosed. In a first step, the old transition structure (1) is removed at its connections (9) to the building (2) and at least a part of the building (2) laterally adjacent thereto in such a way that the width of the construction joint (3) is significantly increased at least in some areas; in a second step, a support structure (11) is fastened in the construction joint (3), which forms a support for the new transition structure (4) on the building (2); and in a third step, the new transition structure (4) is anchored to the support structure (11).
L'invention concerne un procédé de remplacement d'une ancienne structure de transition (1) pour ponter un joint structural (3) situé dans un bâtiment (2) par une nouvelle structure de transition (4). L'invention concerne en outre une nouvelle structure de transition (4) destinée à ponter un joint de construction (3) dans un bâtiment (2). Dans une première étape, l'ancienne structure de transition (1) est retirée au niveau de ses connexions (9) au bâtiment (2) et au moins une partie du bâtiment (2) latéralement adjacente à celle-ci de telle sorte que la largeur du joint de construction (3) est significativement augmentée au moins dans certaines zones ; dans une deuxième étape, une structure de support (11) est fixée dans le joint de construction (3), qui forme un support pour la nouvelle structure de transition (4) sur le bâtiment (2) ; et dans une troisième étape, la nouvelle structure de transition (4) est ancrée à la structure de support (11).
METHOD OF REPLACING A TRANSITION STRUCTURE, TRANSITION STRUCTURE FOR BRIDGING A CONSTRUCTION JOINT LOCATED IN A BUILDING, AND BUILDING WITH A TRANSITION STRUCTURE
Method of replacing an old transition structure (1) for bridging a structural joint (3) located in a building (2) by a new transition structure (4). Furthermore, a new transition structure (4) for bridging a construction joint (3) in a building (2) is disclosed. In a first step, the old transition structure (1) is removed at its connections (9) to the building (2) and at least a part of the building (2) laterally adjacent thereto in such a way that the width of the construction joint (3) is significantly increased at least in some areas; in a second step, a support structure (11) is fastened in the construction joint (3), which forms a support for the new transition structure (4) on the building (2); and in a third step, the new transition structure (4) is anchored to the support structure (11).
L'invention concerne un procédé de remplacement d'une ancienne structure de transition (1) pour ponter un joint structural (3) situé dans un bâtiment (2) par une nouvelle structure de transition (4). L'invention concerne en outre une nouvelle structure de transition (4) destinée à ponter un joint de construction (3) dans un bâtiment (2). Dans une première étape, l'ancienne structure de transition (1) est retirée au niveau de ses connexions (9) au bâtiment (2) et au moins une partie du bâtiment (2) latéralement adjacente à celle-ci de telle sorte que la largeur du joint de construction (3) est significativement augmentée au moins dans certaines zones ; dans une deuxième étape, une structure de support (11) est fixée dans le joint de construction (3), qui forme un support pour la nouvelle structure de transition (4) sur le bâtiment (2) ; et dans une troisième étape, la nouvelle structure de transition (4) est ancrée à la structure de support (11).
METHOD OF REPLACING A TRANSITION STRUCTURE, TRANSITION STRUCTURE FOR BRIDGING A CONSTRUCTION JOINT LOCATED IN A BUILDING, AND BUILDING WITH A TRANSITION STRUCTURE
PROCÉDÉ DE REMPLACEMENT D'UNE STRUCTURE DE TRANSITION, STRUCTURE DE TRANSITION POUR PONTER UN JOINT DE CONSTRUCTION SITUÉ DANS UN BÂTIMENT, ET BÂTIMENT AVEC UNE STRUCTURE DE TRANSITION
REGER JOSEF (Autor:in)
27.10.2022
Patent
Elektronische Ressource
Englisch
IPC:
E01D
BRIDGES
,
Brücken
Europäisches Patentamt | 2023
|Transition construction for bridging a building joint
Europäisches Patentamt | 2022
|TRANSITION CONSTRUCTION FOR BRIDGING A BUILDING JOINT
Europäisches Patentamt | 2022
|TRANSITION CONSTRUCTION FOR BRIDGING A BUILDING JOINT
Europäisches Patentamt | 2020
|