FABRICATED SUBWAY STATION CONSTRUCTION METHOD
A fabricated subway station construction method, comprising: starting digging a foundation pit; fabricating bottom layer assemblies (1), and starting fabricating middle layer assemblies (2) on the bottom layer assemblies (1) after the bottom layer assemblies (1) are fabricated for a predetermined number of rings; and starting fabricating top layer assemblies (3) on the middle layer assemblies (2) after the middle layer assemblies (2) are fabricated for a predetermined number of rings. According to the construction method, the middle layer assemblies (2) are fabricated after the bottom layer assemblies (1) are fabricated for the predetermined number of rings, then the top layer assemblies (3) are then fabricated after the middle layer assemblies (2) are fabricated for the predetermined number of rings, next the bottom layer assemblies (1), the middle layer assemblies (2), and the top layer assemblies (3) are fabricated at the same time in a stepped mode until all the bottom layer assemblies (1), the middle layer assemblies (2), and the top layer assemblies (3) are fabricated to form a subway station, the fabricating efficiency is improved, and the construction time limit is shortened.
Procédé de construction de station de métro fabriquée, comprenant : le début du creusement d'une fosse de fondation ; la fabrication d'ensembles de couches inférieures (1) et le début de la fabrication d'ensembles de couches intermédiaires (2) sur les ensembles de couches inférieures (1) lorsque les ensembles de couches inférieures (1) sont fabriqués pour un nombre prédéterminé d'anneaux ; et le début de fabrication d'ensembles de couches supérieures (3) sur les ensembles de couches intermédiaires (2) lorsque les ensembles de couches intermédiaires (2) sont fabriqués pour un nombre prédéterminé d'anneaux. Selon le procédé de construction, les ensembles couche intermédiaire (2) sont fabriqués lorsque les ensembles de couche inférieure (1) sont fabriqués pour le nombre prédéterminé d'anneaux, puis les ensembles de couches supérieures (3) sont ensuite fabriqués lorsque les ensembles de couches intermédiaires (2) sont fabriqués pour le nombre prédéterminé d'anneaux, ensuite les ensembles de couches inférieures (1), les ensembles de couche intermédiaire (2) et les ensembles de couches supérieures (3) sont fabriqués en même temps dans un mode étagé jusqu'à ce que tous les ensembles de couches inférieures (1), les ensembles de couche intermédiaire (2) et les ensembles de couches supérieures (3) soient fabriqués pour former une station de métro, l'efficacité de fabrication est améliorée et la limite de temps de construction est raccourcie.
一种装配式地铁车站施工方法,包括:开挖基坑;装配底层组件(1),当完成预定环数的所述底层组件(1)的装配时,开始在所述底层组件(1)上进行中层组件(2)的装配;当完成预定环数的中层组件(2)的装配时,开始在所述中层组件(2)上进行顶层组件(3)的装配。该施工方法在底层组件(1)装配至预定环数后开始中层组件(2)的装配,接着在中层组件(2)装配至预定环数后开始顶层组件(3)的装配,之后底层组件(1)、中层组件(2)和顶层组件(3)呈阶梯式同时进行装配,直至将所有底层组件(1)、中层组件(2)和顶层组件(3)全部装配完成以形成地铁车站,提高了装配的效率,缩短了工期。
FABRICATED SUBWAY STATION CONSTRUCTION METHOD
A fabricated subway station construction method, comprising: starting digging a foundation pit; fabricating bottom layer assemblies (1), and starting fabricating middle layer assemblies (2) on the bottom layer assemblies (1) after the bottom layer assemblies (1) are fabricated for a predetermined number of rings; and starting fabricating top layer assemblies (3) on the middle layer assemblies (2) after the middle layer assemblies (2) are fabricated for a predetermined number of rings. According to the construction method, the middle layer assemblies (2) are fabricated after the bottom layer assemblies (1) are fabricated for the predetermined number of rings, then the top layer assemblies (3) are then fabricated after the middle layer assemblies (2) are fabricated for the predetermined number of rings, next the bottom layer assemblies (1), the middle layer assemblies (2), and the top layer assemblies (3) are fabricated at the same time in a stepped mode until all the bottom layer assemblies (1), the middle layer assemblies (2), and the top layer assemblies (3) are fabricated to form a subway station, the fabricating efficiency is improved, and the construction time limit is shortened.
Procédé de construction de station de métro fabriquée, comprenant : le début du creusement d'une fosse de fondation ; la fabrication d'ensembles de couches inférieures (1) et le début de la fabrication d'ensembles de couches intermédiaires (2) sur les ensembles de couches inférieures (1) lorsque les ensembles de couches inférieures (1) sont fabriqués pour un nombre prédéterminé d'anneaux ; et le début de fabrication d'ensembles de couches supérieures (3) sur les ensembles de couches intermédiaires (2) lorsque les ensembles de couches intermédiaires (2) sont fabriqués pour un nombre prédéterminé d'anneaux. Selon le procédé de construction, les ensembles couche intermédiaire (2) sont fabriqués lorsque les ensembles de couche inférieure (1) sont fabriqués pour le nombre prédéterminé d'anneaux, puis les ensembles de couches supérieures (3) sont ensuite fabriqués lorsque les ensembles de couches intermédiaires (2) sont fabriqués pour le nombre prédéterminé d'anneaux, ensuite les ensembles de couches inférieures (1), les ensembles de couche intermédiaire (2) et les ensembles de couches supérieures (3) sont fabriqués en même temps dans un mode étagé jusqu'à ce que tous les ensembles de couches inférieures (1), les ensembles de couche intermédiaire (2) et les ensembles de couches supérieures (3) soient fabriqués pour former une station de métro, l'efficacité de fabrication est améliorée et la limite de temps de construction est raccourcie.
一种装配式地铁车站施工方法,包括:开挖基坑;装配底层组件(1),当完成预定环数的所述底层组件(1)的装配时,开始在所述底层组件(1)上进行中层组件(2)的装配;当完成预定环数的中层组件(2)的装配时,开始在所述中层组件(2)上进行顶层组件(3)的装配。该施工方法在底层组件(1)装配至预定环数后开始中层组件(2)的装配,接着在中层组件(2)装配至预定环数后开始顶层组件(3)的装配,之后底层组件(1)、中层组件(2)和顶层组件(3)呈阶梯式同时进行装配,直至将所有底层组件(1)、中层组件(2)和顶层组件(3)全部装配完成以形成地铁车站,提高了装配的效率,缩短了工期。
FABRICATED SUBWAY STATION CONSTRUCTION METHOD
PROCÉDÉ DE CONSTRUCTION DE STATION DE MÉTRO FABRIQUÉE
装配式地铁车站施工方法
LUO PU (Autor:in) / HUANG CHAO (Autor:in) / ZHANG ZHUN (Autor:in) / MA WENBIN (Autor:in) / CHENG FENG (Autor:in) / SHU JUN (Autor:in) / RAO LANG (Autor:in) / ZHENG ZENG (Autor:in) / CHEN YAOXUE (Autor:in) / LI NAN (Autor:in)
16.02.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction method of fabricated subway station and fabricated subway station
Europäisches Patentamt | 2024
|Assembling construction method for fabricated subway station
Europäisches Patentamt | 2024
|Fabricated subway station and construction method thereof
Europäisches Patentamt | 2023
|Fabricated subway station waterproof system construction method
Europäisches Patentamt | 2024
|