CONSTRUCTION METHOD FOR FOUNDATION PIT ENCLOSURE AND EARTH EXCAVATION
A construction method for foundation pit enclosure and earth excavation, comprising the following steps of: construction drawing design and drawing review, construction site preparation, support enclosure arrangement, drainage measure arrangement, earth excavation, cushion layer, bottom plate and force transmission belt pouring, support dismantling, basement structure construction completion, earth backfilling, and grouting after pile pulling. Foundation reinforcement measures in a pit are used, and accumulated water in the foundation pit is pumped out in time, such that in the whole pit digging process, the foundation pit has better stability, meanwhile, excavation is performed in sequence in a segmented and layered mode from top to bottom, the gradient is reasonably controlled, slope toe cutting is avoided, side slope instability is prevented, and the safety is better.
L'invention concerne un procédé de construction pour une enceinte de puits de fondation et une excavation de terre, comprenant les étapes suivantes : la conception et l'examen des plans de construction, la préparation du site de construction, la disposition des enceintes de soutien, la disposition des mesures de drainage, l'excavation de la terre, la mise en place de la couche d'amortissement, de la plaque de fond et de la courroie de transmission, le démantèlement du soutien, l'achèvement de la construction de la structure du sous-sol, le remblayage de la terre et l'injection de coulis après l'arrachage des pieux. Des mesures de renforcement des fondations dans un puits sont utilisées, et l'eau accumulée dans le puits de fondation est pompée à temps, de sorte que dans l'ensemble du processus de creusement du puits, le puits de fondation présente une meilleure stabilité, tandis que l'excavation est effectuée en séquence dans un mode segmenté et en couches du haut vers le bas, la pente est raisonnablement contrôlée, le découpage du pied de pente est évité, l'instabilité de la pente latérale est évitée, et la sécurité est améliorée.
一种基坑围护及土方开挖的施工方法,包括以下步骤:施工图纸设计及图纸会审,施工现场准备,设置支撑围护,设置排水措施,进行土方开挖,浇筑垫层、底板和传力带,拆除支撑,完成地下室结构施工,土方回填,拔桩后注浆;通过坑内地基加固措施,且及时抽去基坑积水,使得整体挖坑过程中,基坑具有更好的稳定性,同时开挖由上而下分段分层、依次进行,合理控制坡度,避免切割坡脚防治边坡失稳,具有更好的安全性。
CONSTRUCTION METHOD FOR FOUNDATION PIT ENCLOSURE AND EARTH EXCAVATION
A construction method for foundation pit enclosure and earth excavation, comprising the following steps of: construction drawing design and drawing review, construction site preparation, support enclosure arrangement, drainage measure arrangement, earth excavation, cushion layer, bottom plate and force transmission belt pouring, support dismantling, basement structure construction completion, earth backfilling, and grouting after pile pulling. Foundation reinforcement measures in a pit are used, and accumulated water in the foundation pit is pumped out in time, such that in the whole pit digging process, the foundation pit has better stability, meanwhile, excavation is performed in sequence in a segmented and layered mode from top to bottom, the gradient is reasonably controlled, slope toe cutting is avoided, side slope instability is prevented, and the safety is better.
L'invention concerne un procédé de construction pour une enceinte de puits de fondation et une excavation de terre, comprenant les étapes suivantes : la conception et l'examen des plans de construction, la préparation du site de construction, la disposition des enceintes de soutien, la disposition des mesures de drainage, l'excavation de la terre, la mise en place de la couche d'amortissement, de la plaque de fond et de la courroie de transmission, le démantèlement du soutien, l'achèvement de la construction de la structure du sous-sol, le remblayage de la terre et l'injection de coulis après l'arrachage des pieux. Des mesures de renforcement des fondations dans un puits sont utilisées, et l'eau accumulée dans le puits de fondation est pompée à temps, de sorte que dans l'ensemble du processus de creusement du puits, le puits de fondation présente une meilleure stabilité, tandis que l'excavation est effectuée en séquence dans un mode segmenté et en couches du haut vers le bas, la pente est raisonnablement contrôlée, le découpage du pied de pente est évité, l'instabilité de la pente latérale est évitée, et la sécurité est améliorée.
一种基坑围护及土方开挖的施工方法,包括以下步骤:施工图纸设计及图纸会审,施工现场准备,设置支撑围护,设置排水措施,进行土方开挖,浇筑垫层、底板和传力带,拆除支撑,完成地下室结构施工,土方回填,拔桩后注浆;通过坑内地基加固措施,且及时抽去基坑积水,使得整体挖坑过程中,基坑具有更好的稳定性,同时开挖由上而下分段分层、依次进行,合理控制坡度,避免切割坡脚防治边坡失稳,具有更好的安全性。
CONSTRUCTION METHOD FOR FOUNDATION PIT ENCLOSURE AND EARTH EXCAVATION
PROCÉDÉ DE CONSTRUCTION POUR ENCEINTE DE PUITS DE FONDATION ET EXCAVATION DE TERRE
一种基坑围护及土方开挖的施工方法
BAO JIAJIA (Autor:in) / DUAN HAITAO (Autor:in) / MO GUOJUN (Autor:in) / LIU QILONG (Autor:in) / MA GENBAO (Autor:in)
11.05.2023
Patent
Elektronische Ressource
Chinesisch
Construction method for foundation pit enclosure and earth excavation
Europäisches Patentamt | 2022
|Block enclosure isolation method for foundation pit supporting earth excavation
Europäisches Patentamt | 2023
|Electric power foundation pit excavation enclosure device
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2022
|