Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
FULLY STAGED STEEL TRESTLE AND CONSTRUCTION METHOD THEREFOR
Disclosed is a fully staged steel trestle, which is used to put in communication hydraulic structures of a port, and comprises a steel pipe pile foundation, lower beams, Bailey beams, upper beams, a bridge deck, upper longitudinal beams and lower longitudinal beams, a pair of upper longitudinal beams and a pair of lower longitudinal beams together extending along an extension direction of which the steel trestle. A construction method for a fully staged steel trestle comprises the following steps: S1, a guide bracket is connected to a front end of a working platform by means of an upper longitudinal beam and a lower longitudinal beam; S2, moving the guide bracket to a predetermined position for a section to be installed, a crawler crane hoisting a steel pipe pile for positioning by means of the guide bracket, and then sinking and affixing the steel pipe pile; S3, cutting off excess length of the steel pipe pile, controlling a distance between a pair of guide frames to extend to a minimum distance, and separating the guide bracket from the steel pipe pile by means of sliding; S4, repeating S2-S3, to complete construction of remaining sections. The present invention has the beneficial effects of a steel trestle and a guide bracket being configured to have a sliding connection, a weakened disassembly and assembly process of the guide bracket, and increased construction efficiency.
L'invention concerne un chevalet en acier entièrement étagé, qui est utilisé pour mettre en communication des structures hydrauliques d'un port, et qui comprend une fondation sur pieu tubulaire en acier, des poutres inférieures, des poutres Bailey, des poutres supérieures, un tablier de pont, des poutres longitudinales supérieures et des poutres longitudinales inférieures, une paire de poutres longitudinales supérieures et une paire de poutres longitudinales inférieures s'étendant ensemble le long d'une direction d'extension du chevalet en acier. Un procédé de construction d'un chevalet en acier entièrement étagé comprend les étapes suivantes : S1, la liaison d'un support de guidage à une extrémité avant d'une plateforme de travail au moyen d'une poutre longitudinale supérieure et d'une poutre longitudinale inférieure ; S2, le déplacement du support de guidage vers une position prédéfinie pour une section à installer, une grue à chenilles comprenant un pieu tubulaire en acier pour le positionnement au moyen du support de guidage, puis l'enfoncement et la fixation du pieu tubulaire en acier ; S3, la coupe de l'excès de longueur du pieu tubulaire en acier, l'ajustement de la distance entre une paire de structures de guidage pour s'étendre jusqu'à une distance minimale, et la séparation du support de guidage du pieu tubulaire en acier par coulissement ; S4, la répétition de S2-S3, pour achever la construction des sections restantes. La présente invention présente les effets bénéfiques d'un chevalet en acier et d'un support de guidage conçu pour avoir une liaison coulissante, un procédé de démontage et de montage simplifié du support de guidage, et une efficacité de construction accrue.
本发明公开了一种满堂式钢栈桥,用于连通港口各水工建筑物,包括钢管桩基础、下横梁、贝雷梁、上横梁、桥面板、上纵梁、下纵梁,一对上纵梁与一对下纵梁同步沿钢栈桥延伸方向延伸。一种满堂式钢栈桥的施工方法,包括以下步骤:S1、作业平台前端通过上纵梁和下纵梁连接有导向架;S2、移动导向架至待安装阶段的预定位置,履带吊机吊取钢管桩通过导向架进行定位,而后进行钢管桩的沉没固定;S3、切割多余长度的钢管桩,控制使一对导向框间距离扩展至最小距离,滑动使导向架脱离钢管桩;S4、重复S2-S3,完成剩余阶段施工。本发明具有滑动连接设置钢栈桥、导向架,弱化导向架拆装程序,提高施工效率的有益效果。
FULLY STAGED STEEL TRESTLE AND CONSTRUCTION METHOD THEREFOR
Disclosed is a fully staged steel trestle, which is used to put in communication hydraulic structures of a port, and comprises a steel pipe pile foundation, lower beams, Bailey beams, upper beams, a bridge deck, upper longitudinal beams and lower longitudinal beams, a pair of upper longitudinal beams and a pair of lower longitudinal beams together extending along an extension direction of which the steel trestle. A construction method for a fully staged steel trestle comprises the following steps: S1, a guide bracket is connected to a front end of a working platform by means of an upper longitudinal beam and a lower longitudinal beam; S2, moving the guide bracket to a predetermined position for a section to be installed, a crawler crane hoisting a steel pipe pile for positioning by means of the guide bracket, and then sinking and affixing the steel pipe pile; S3, cutting off excess length of the steel pipe pile, controlling a distance between a pair of guide frames to extend to a minimum distance, and separating the guide bracket from the steel pipe pile by means of sliding; S4, repeating S2-S3, to complete construction of remaining sections. The present invention has the beneficial effects of a steel trestle and a guide bracket being configured to have a sliding connection, a weakened disassembly and assembly process of the guide bracket, and increased construction efficiency.
L'invention concerne un chevalet en acier entièrement étagé, qui est utilisé pour mettre en communication des structures hydrauliques d'un port, et qui comprend une fondation sur pieu tubulaire en acier, des poutres inférieures, des poutres Bailey, des poutres supérieures, un tablier de pont, des poutres longitudinales supérieures et des poutres longitudinales inférieures, une paire de poutres longitudinales supérieures et une paire de poutres longitudinales inférieures s'étendant ensemble le long d'une direction d'extension du chevalet en acier. Un procédé de construction d'un chevalet en acier entièrement étagé comprend les étapes suivantes : S1, la liaison d'un support de guidage à une extrémité avant d'une plateforme de travail au moyen d'une poutre longitudinale supérieure et d'une poutre longitudinale inférieure ; S2, le déplacement du support de guidage vers une position prédéfinie pour une section à installer, une grue à chenilles comprenant un pieu tubulaire en acier pour le positionnement au moyen du support de guidage, puis l'enfoncement et la fixation du pieu tubulaire en acier ; S3, la coupe de l'excès de longueur du pieu tubulaire en acier, l'ajustement de la distance entre une paire de structures de guidage pour s'étendre jusqu'à une distance minimale, et la séparation du support de guidage du pieu tubulaire en acier par coulissement ; S4, la répétition de S2-S3, pour achever la construction des sections restantes. La présente invention présente les effets bénéfiques d'un chevalet en acier et d'un support de guidage conçu pour avoir une liaison coulissante, un procédé de démontage et de montage simplifié du support de guidage, et une efficacité de construction accrue.
本发明公开了一种满堂式钢栈桥,用于连通港口各水工建筑物,包括钢管桩基础、下横梁、贝雷梁、上横梁、桥面板、上纵梁、下纵梁,一对上纵梁与一对下纵梁同步沿钢栈桥延伸方向延伸。一种满堂式钢栈桥的施工方法,包括以下步骤:S1、作业平台前端通过上纵梁和下纵梁连接有导向架;S2、移动导向架至待安装阶段的预定位置,履带吊机吊取钢管桩通过导向架进行定位,而后进行钢管桩的沉没固定;S3、切割多余长度的钢管桩,控制使一对导向框间距离扩展至最小距离,滑动使导向架脱离钢管桩;S4、重复S2-S3,完成剩余阶段施工。本发明具有滑动连接设置钢栈桥、导向架,弱化导向架拆装程序,提高施工效率的有益效果。
FULLY STAGED STEEL TRESTLE AND CONSTRUCTION METHOD THEREFOR
CHEVALET EN ACIER ENTIÈREMENT ÉTAGÉ ET SON PROCÉDÉ DE CONSTRUCTION
满堂式钢栈桥及其施工方法
WANG HONGXIANG (Autor:in)
01.02.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Fabricated steel trestle structure and steel trestle construction method
Europäisches Patentamt | 2023
|