Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
NUCLEAR ISLAND REACTOR PLANT CONSTRUCTION EQUIPMENT INTEGRATION PLATFORM AND CLIMBING METHOD THEREFOR
Disclosed in the present invention are a nuclear island reactor plant construction equipment integration platform and a climbing method therefor. The nuclear island reactor plant construction equipment integration platform comprises a steel platform system, a supporting and jacking system, a hanger and formwork system, and construction integration equipment. The supporting and jacking system is mounted on the side surface of a nuclear island reactor plant. The supporting and jacking system is located below the steel platform system, and the hanger and formwork system is installed below the steel platform system. The steel platform system comprises an annular steel truss, a primary radial steel truss and a secondary radial steel truss. The construction integration equipment comprises an annular rail installed at the bottom of the hanger and formwork system and ring cranes slidably connected to the annular rail. According to the nuclear island reactor plant construction equipment integration platform, the problem that the total time of construction is restricted by the "stepped" process of an inner shell, an outer shell and a surrounding plant in the existing construction of the nuclear island reactor plant is solved.
La présente invention divulgue une plateforme d'intégration d'équipement de construction d'installation de réacteur à îlot nucléaire et un procédé d'escalade associé. La plateforme d'intégration d'équipement de construction d'installation de réacteur à îlot nucléaire comprend un système de plateforme en acier, un système de support et de levage, un système de suspension et de coffrage, et un équipement d'intégration de construction. Le système de support et de levage est monté sur la surface latérale d'une installation de réacteur à îlot nucléaire. Le système de support et de levage est situé au-dessous du système de plateforme en acier, et le système de suspension et de coffrage est installé sous le système de plateforme en acier. Le système de plate-forme en acier comprend un treillis en acier annulaire, un treillis en acier radial primaire et un treillis en acier radial secondaire. L'équipement d'intégration de construction comprend un rail annulaire installé au fond du système de suspension et de coffrage et des grues annulaires reliées de manière coulissante au rail annulaire. Selon la plateforme d'intégration d'équipement de construction d'installation de réacteur à îlot nucléaire, le problème selon lequel le temps total de construction est limité par le processus « étagé » d'une enveloppe interne, d'une enveloppe externe et d'une installation environnante dans la construction existante de l'installation de réacteur à îlot nucléaire est résolu.
本发明公开了一种核岛反应堆厂房施工装备集成平台及其爬升方法。本核岛反应堆厂房施工装备集成平台包括钢平台系统、支承及顶升系统、挂架及模板系统和施工集成装备,支承及顶升系统安装于核岛反应堆厂房的侧面上,支承及顶升系统位于钢平台系统的下方,挂架及模板系统安装于钢平台系统下方;钢平台系统包括环向钢桁架、径向主钢桁架以及径向次钢桁架,施工集成装备包括安装于挂架及模板系统底部的环形轨道以及与环形轨道滑动连接的环吊。本核岛反应堆厂房施工装备集成平台,解决了核岛反应堆厂房现有施工中内壳、外壳、周边厂房"阶梯式"工艺制约总工期的问题。
NUCLEAR ISLAND REACTOR PLANT CONSTRUCTION EQUIPMENT INTEGRATION PLATFORM AND CLIMBING METHOD THEREFOR
Disclosed in the present invention are a nuclear island reactor plant construction equipment integration platform and a climbing method therefor. The nuclear island reactor plant construction equipment integration platform comprises a steel platform system, a supporting and jacking system, a hanger and formwork system, and construction integration equipment. The supporting and jacking system is mounted on the side surface of a nuclear island reactor plant. The supporting and jacking system is located below the steel platform system, and the hanger and formwork system is installed below the steel platform system. The steel platform system comprises an annular steel truss, a primary radial steel truss and a secondary radial steel truss. The construction integration equipment comprises an annular rail installed at the bottom of the hanger and formwork system and ring cranes slidably connected to the annular rail. According to the nuclear island reactor plant construction equipment integration platform, the problem that the total time of construction is restricted by the "stepped" process of an inner shell, an outer shell and a surrounding plant in the existing construction of the nuclear island reactor plant is solved.
La présente invention divulgue une plateforme d'intégration d'équipement de construction d'installation de réacteur à îlot nucléaire et un procédé d'escalade associé. La plateforme d'intégration d'équipement de construction d'installation de réacteur à îlot nucléaire comprend un système de plateforme en acier, un système de support et de levage, un système de suspension et de coffrage, et un équipement d'intégration de construction. Le système de support et de levage est monté sur la surface latérale d'une installation de réacteur à îlot nucléaire. Le système de support et de levage est situé au-dessous du système de plateforme en acier, et le système de suspension et de coffrage est installé sous le système de plateforme en acier. Le système de plate-forme en acier comprend un treillis en acier annulaire, un treillis en acier radial primaire et un treillis en acier radial secondaire. L'équipement d'intégration de construction comprend un rail annulaire installé au fond du système de suspension et de coffrage et des grues annulaires reliées de manière coulissante au rail annulaire. Selon la plateforme d'intégration d'équipement de construction d'installation de réacteur à îlot nucléaire, le problème selon lequel le temps total de construction est limité par le processus « étagé » d'une enveloppe interne, d'une enveloppe externe et d'une installation environnante dans la construction existante de l'installation de réacteur à îlot nucléaire est résolu.
本发明公开了一种核岛反应堆厂房施工装备集成平台及其爬升方法。本核岛反应堆厂房施工装备集成平台包括钢平台系统、支承及顶升系统、挂架及模板系统和施工集成装备,支承及顶升系统安装于核岛反应堆厂房的侧面上,支承及顶升系统位于钢平台系统的下方,挂架及模板系统安装于钢平台系统下方;钢平台系统包括环向钢桁架、径向主钢桁架以及径向次钢桁架,施工集成装备包括安装于挂架及模板系统底部的环形轨道以及与环形轨道滑动连接的环吊。本核岛反应堆厂房施工装备集成平台,解决了核岛反应堆厂房现有施工中内壳、外壳、周边厂房"阶梯式"工艺制约总工期的问题。
NUCLEAR ISLAND REACTOR PLANT CONSTRUCTION EQUIPMENT INTEGRATION PLATFORM AND CLIMBING METHOD THEREFOR
PLATEFORME D'INTÉGRATION D'ÉQUIPEMENT DE CONSTRUCTION D'INSTALLATION DE RÉACTEUR À ÎLOT NUCLÉAIRE ET PROCÉDÉ D'ESCALADE ASSOCIÉ
核岛反应堆厂房施工装备集成平台及其爬升方法
ZHANG KUN (Autor:in) / WANG KAIQIANG (Autor:in) / WANG DONG (Autor:in) / YANG YAZHANG (Autor:in) / SUN QING (Autor:in) / ZHAO WEI (Autor:in) / LIU WEI (Autor:in) / CHEN LIHUA (Autor:in) / HUANG LEI (Autor:in) / HUANG GE (Autor:in)
23.05.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|Steel tower construction operation climbing platform and climbing method
Europäisches Patentamt | 2024
|Climbing system of construction integrated platform and climbing method thereof
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2022
|