Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
STEEL-CONCRETE COMPOSITE GIRDER AND BRIDGE ASSEMBLING DEVICE AND METHOD
The present invention relates to a steel-concrete composite girder and bridge assembling device and method. The device comprises a support base and a movable frame above the support base; two first rectangular holes are formed in the support base; slidably-connected movable plates are provided in the first rectangular holes; sliding plates are provided above the movable plates, and the movable frame passes through the sliding plates; the movable frame and the support base are connected by means of a pressing device; two second rectangular holes are formed in each movable plate; slidably-connected sliding seats are provided in the second rectangular holes; a top plate is provided above the movable frame; the top plate and the support base are connected by means of first support portions; raising/lowering plates pass through the sliding seats; and the raising/lowering plates are slidably connected to the sliding plates. When a steel-concrete composite girder moves to a specified position, the composite girder is separated from a bridge girder erection machine, thereby conveniently relieving the fixation relation between the bridge girder erection machine and the composite girder.
La présente invention concerne un poutre composite en acier-béton et un dispositif et un procédé d'assemblage de pont. Le dispositif comprend une base de support et un bâti mobile au-dessus de la base de support ; deux premiers trous rectangulaires sont formés dans la base de support ; des plaques mobiles reliées de manière coulissante sont disposées dans les premiers trous rectangulaires ; des plaques coulissantes sont disposées au-dessus des plaques mobiles et le bâti mobile passe à travers les plaques coulissantes ; le bâti mobile et la base de support sont reliés au moyen d'un dispositif de pressage ; deux seconds trous rectangulaires sont formés dans chaque plaque mobile ; des sièges coulissants reliés de manière coulissante sont disposés dans les seconds trous rectangulaires ; une plaque supérieure est disposée au-dessus du bâti mobile ; la plaque supérieure et la base de support sont reliées au moyen de premières parties de support ; des plaques d'élévation/d'abaissement passent à travers les sièges coulissants ; et les plaques d'élévation/d'abaissement sont reliées de manière coulissante aux plaques coulissantes. Lorsqu'une poutre composite en acier-béton se déplace vers une position spécifiée, la poutre composite est séparée d'une machine d'érection de poutre de pont, ce qui permet de soulager commodément la relation de fixation entre la machine d'érection de poutre de pont et la poutre composite.
本发明涉及一种钢混组合梁桥梁装配装置机及装配方法。该装置机包括支撑底座及其上方的活动架,支撑底座上开设有两个第一矩形孔,第一矩形孔内设有滑动连接的活动板,活动板的上方设有滑动板,且活动架贯穿滑动板,活动架和支撑底座通过下压器连接,活动板上开设有两个第二矩形孔,第二矩形孔内设有滑动连接的滑动座,活动架的上方设有顶板,顶板和支撑底座通过第一支撑部连接,滑动座上贯穿有升降板,升降板和滑动板滑动连接;组合梁移动至指定位置时,以使钢混组合梁脱离架桥机,便于解除架桥机和组合梁之间的固定关系。
STEEL-CONCRETE COMPOSITE GIRDER AND BRIDGE ASSEMBLING DEVICE AND METHOD
The present invention relates to a steel-concrete composite girder and bridge assembling device and method. The device comprises a support base and a movable frame above the support base; two first rectangular holes are formed in the support base; slidably-connected movable plates are provided in the first rectangular holes; sliding plates are provided above the movable plates, and the movable frame passes through the sliding plates; the movable frame and the support base are connected by means of a pressing device; two second rectangular holes are formed in each movable plate; slidably-connected sliding seats are provided in the second rectangular holes; a top plate is provided above the movable frame; the top plate and the support base are connected by means of first support portions; raising/lowering plates pass through the sliding seats; and the raising/lowering plates are slidably connected to the sliding plates. When a steel-concrete composite girder moves to a specified position, the composite girder is separated from a bridge girder erection machine, thereby conveniently relieving the fixation relation between the bridge girder erection machine and the composite girder.
La présente invention concerne un poutre composite en acier-béton et un dispositif et un procédé d'assemblage de pont. Le dispositif comprend une base de support et un bâti mobile au-dessus de la base de support ; deux premiers trous rectangulaires sont formés dans la base de support ; des plaques mobiles reliées de manière coulissante sont disposées dans les premiers trous rectangulaires ; des plaques coulissantes sont disposées au-dessus des plaques mobiles et le bâti mobile passe à travers les plaques coulissantes ; le bâti mobile et la base de support sont reliés au moyen d'un dispositif de pressage ; deux seconds trous rectangulaires sont formés dans chaque plaque mobile ; des sièges coulissants reliés de manière coulissante sont disposés dans les seconds trous rectangulaires ; une plaque supérieure est disposée au-dessus du bâti mobile ; la plaque supérieure et la base de support sont reliées au moyen de premières parties de support ; des plaques d'élévation/d'abaissement passent à travers les sièges coulissants ; et les plaques d'élévation/d'abaissement sont reliées de manière coulissante aux plaques coulissantes. Lorsqu'une poutre composite en acier-béton se déplace vers une position spécifiée, la poutre composite est séparée d'une machine d'érection de poutre de pont, ce qui permet de soulager commodément la relation de fixation entre la machine d'érection de poutre de pont et la poutre composite.
本发明涉及一种钢混组合梁桥梁装配装置机及装配方法。该装置机包括支撑底座及其上方的活动架,支撑底座上开设有两个第一矩形孔,第一矩形孔内设有滑动连接的活动板,活动板的上方设有滑动板,且活动架贯穿滑动板,活动架和支撑底座通过下压器连接,活动板上开设有两个第二矩形孔,第二矩形孔内设有滑动连接的滑动座,活动架的上方设有顶板,顶板和支撑底座通过第一支撑部连接,滑动座上贯穿有升降板,升降板和滑动板滑动连接;组合梁移动至指定位置时,以使钢混组合梁脱离架桥机,便于解除架桥机和组合梁之间的固定关系。
STEEL-CONCRETE COMPOSITE GIRDER AND BRIDGE ASSEMBLING DEVICE AND METHOD
POUTRE COMPOSITE EN ACIER-BÉTON ET DISPOSITIF ET PROCÉDÉ D'ASSEMBLAGE DE PONT
一种钢-混组合梁桥梁装配装置机及方法
WANG GUORONG (Autor:in) / ZHAO ZHIKUN (Autor:in) / WANG YU (Autor:in) / LI KUN (Autor:in) / SUN FUSHENG (Autor:in) / ZHENG GUIZHI (Autor:in) / FAN ZONGYONG (Autor:in) / ZHANG ZIHAO (Autor:in)
04.07.2024
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Steel box girder bridge assembling and position adjusting device
Europäisches Patentamt | 2022
|Cable-stayed bridge steel-concrete composite girder mounting method
Europäisches Patentamt | 2023
|Assembling method for assembling variable-span girder of bridge girder erection machine
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2023
|Steel-concrete composite beam bridge assembling device and method
Europäisches Patentamt | 2023
|