Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
CONSTRUCTION METHOD FOR PILE FOUNDATION OF PHOTOVOLTAIC SUPPORT, PILE FOUNDATION, AND PHOTOVOLTAIC SUPPORT
The present invention relates to the field of photovoltaic apparatuses. Provided are a construction method for a pile foundation of a photovoltaic support, a pile foundation, and a photovoltaic support. The construction method for a pile foundation of a photovoltaic support comprises: performing a pull-out force test, so as to obtain the actual friction coefficient of an installation area; prefabricating an upright during or prior to the pull-out force test; prefabricating an auxiliary pile after the pull-out force test; and fixedly connecting the auxiliary pile to the upright, so as to enhance the pull-out force of the upright. The pile foundation comprises an upright and an auxiliary pile, wherein the upright has an embedment end capable of being embedded into the soil and a fitting end adapted for mounting a load-bearing body; and the auxiliary pile is mounted close to the embedment end of the upright, enabling the pull-out force of the upright to be enhanced. The photovoltaic support comprises the pile foundation. According to the construction method for a pile foundation of a photovoltaic support, the pile foundation, and the photovoltaic support provided in the present invention, an upright can be prefabricated during or prior to a pull-out force test, and the pull-out force of the upright can be enhanced by fixedly connecting an auxiliary pile to said upright after the pull-out force test, enabling the upright to meet the pull-out force test requirements, greatly shortening the construction period and reducing project costs.
La présente invention se rapporte au domaine des appareils photovoltaïques. L'invention concerne un procédé de construction pour une fondation de pieu d'un support photovoltaïque, une fondation de pieu et un support photovoltaïque. Le procédé de construction pour une fondation de pieu d'un support photovoltaïque consiste à : réaliser un test de force d'extraction, de façon à obtenir le coefficient de frottement réel d'une zone d'installation ; préfabriquer un montant pendant ou avant le test de force d'extraction ; préfabriquer un pieu auxiliaire après le test de force d'extraction ; et relier de manière fixe le pieu auxiliaire au montant, de façon à améliorer la force d'extraction du montant. La fondation de pieu comprend un montant et un pieu auxiliaire, le montant ayant une extrémité d'encastrement pouvant être incorporée dans le sol et une extrémité de raccordement conçue pour monter un corps porteur ; et le pieu auxiliaire est monté à proximité de l'extrémité d'encastrement du montant, permettant d'améliorer la force d'extraction du montant. Le support photovoltaïque comprend la fondation de pieu. Selon le procédé de construction pour une fondation de pieu d'un support photovoltaïque, la fondation de pieu et le support photovoltaïque décrits dans la présente invention, un montant peut être préfabriqué pendant ou avant un test de force d'extraction et la force d'extraction du montant peut être améliorée par liaison fixe d'un pieu auxiliaire audit montant après le test de force d'extraction, permettant au montant de satisfaire aux exigences de test de force d'extraction, raccourcissant considérablement la période de construction et réduisant les coûts de projet.
本发明涉及光伏设备领域,提供一种光伏支架桩基施工方法、桩基以及光伏支架。光伏支架桩基施工方法包括进行拉拔力测试,获得待安装区域的实际摩擦系数;在进行拉拔力测试的同时或之前预制立柱;在进行拉拔力测试之后预制副桩;将副桩与立柱固定连接,以增强立柱的拉拔力。一种桩基包括立柱和副桩;立桩具有能够埋入土壤的埋入端和适于安装承载体的装配端;副桩安装于立柱靠近埋入端,增强立柱的拉拔力。光伏支架包括桩基。本发明提供的一种光伏支架桩基施工方法、桩基以及光伏支架能够在拉拔力测试同时或之前预制立柱,并在拉拔力测试之后通过固定连接副桩来增加立柱的拉拔力,使立柱符合拉拔力测试要求,大大缩短施工周期,降低项目成本。
CONSTRUCTION METHOD FOR PILE FOUNDATION OF PHOTOVOLTAIC SUPPORT, PILE FOUNDATION, AND PHOTOVOLTAIC SUPPORT
The present invention relates to the field of photovoltaic apparatuses. Provided are a construction method for a pile foundation of a photovoltaic support, a pile foundation, and a photovoltaic support. The construction method for a pile foundation of a photovoltaic support comprises: performing a pull-out force test, so as to obtain the actual friction coefficient of an installation area; prefabricating an upright during or prior to the pull-out force test; prefabricating an auxiliary pile after the pull-out force test; and fixedly connecting the auxiliary pile to the upright, so as to enhance the pull-out force of the upright. The pile foundation comprises an upright and an auxiliary pile, wherein the upright has an embedment end capable of being embedded into the soil and a fitting end adapted for mounting a load-bearing body; and the auxiliary pile is mounted close to the embedment end of the upright, enabling the pull-out force of the upright to be enhanced. The photovoltaic support comprises the pile foundation. According to the construction method for a pile foundation of a photovoltaic support, the pile foundation, and the photovoltaic support provided in the present invention, an upright can be prefabricated during or prior to a pull-out force test, and the pull-out force of the upright can be enhanced by fixedly connecting an auxiliary pile to said upright after the pull-out force test, enabling the upright to meet the pull-out force test requirements, greatly shortening the construction period and reducing project costs.
La présente invention se rapporte au domaine des appareils photovoltaïques. L'invention concerne un procédé de construction pour une fondation de pieu d'un support photovoltaïque, une fondation de pieu et un support photovoltaïque. Le procédé de construction pour une fondation de pieu d'un support photovoltaïque consiste à : réaliser un test de force d'extraction, de façon à obtenir le coefficient de frottement réel d'une zone d'installation ; préfabriquer un montant pendant ou avant le test de force d'extraction ; préfabriquer un pieu auxiliaire après le test de force d'extraction ; et relier de manière fixe le pieu auxiliaire au montant, de façon à améliorer la force d'extraction du montant. La fondation de pieu comprend un montant et un pieu auxiliaire, le montant ayant une extrémité d'encastrement pouvant être incorporée dans le sol et une extrémité de raccordement conçue pour monter un corps porteur ; et le pieu auxiliaire est monté à proximité de l'extrémité d'encastrement du montant, permettant d'améliorer la force d'extraction du montant. Le support photovoltaïque comprend la fondation de pieu. Selon le procédé de construction pour une fondation de pieu d'un support photovoltaïque, la fondation de pieu et le support photovoltaïque décrits dans la présente invention, un montant peut être préfabriqué pendant ou avant un test de force d'extraction et la force d'extraction du montant peut être améliorée par liaison fixe d'un pieu auxiliaire audit montant après le test de force d'extraction, permettant au montant de satisfaire aux exigences de test de force d'extraction, raccourcissant considérablement la période de construction et réduisant les coûts de projet.
本发明涉及光伏设备领域,提供一种光伏支架桩基施工方法、桩基以及光伏支架。光伏支架桩基施工方法包括进行拉拔力测试,获得待安装区域的实际摩擦系数;在进行拉拔力测试的同时或之前预制立柱;在进行拉拔力测试之后预制副桩;将副桩与立柱固定连接,以增强立柱的拉拔力。一种桩基包括立柱和副桩;立桩具有能够埋入土壤的埋入端和适于安装承载体的装配端;副桩安装于立柱靠近埋入端,增强立柱的拉拔力。光伏支架包括桩基。本发明提供的一种光伏支架桩基施工方法、桩基以及光伏支架能够在拉拔力测试同时或之前预制立柱,并在拉拔力测试之后通过固定连接副桩来增加立柱的拉拔力,使立柱符合拉拔力测试要求,大大缩短施工周期,降低项目成本。
CONSTRUCTION METHOD FOR PILE FOUNDATION OF PHOTOVOLTAIC SUPPORT, PILE FOUNDATION, AND PHOTOVOLTAIC SUPPORT
PROCÉDÉ DE CONSTRUCTION POUR FONDATION DE PIEU DE SUPPORT PHOTOVOLTAÏQUE, FONDATION DE PIEU ET SUPPORT PHOTOVOLTAÏQUE
一种光伏支架桩基施工方法、桩基以及光伏支架
YANG YING (Autor:in) / CHEN JINGQIANG (Autor:in) / PENG WENHUA (Autor:in)
02.01.2025
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
/
H02S
GENERATION OF ELECTRIC POWER BY CONVERSION OF INFRA-RED RADIATION, VISIBLE LIGHT OR ULTRAVIOLET LIGHT, E.G. USING PHOTOVOLTAIC [PV] MODULES
,
Erzeugung elektrischer Energie durch Umwandlung von Infrarot-Strahlung, sichtbarem Licht oder ultraviolettem Licht, z.B. unter Verwendung von Photovoltaik [PV]-Modulen
Europäisches Patentamt | 2024
|Photovoltaic support pile foundation and construction method
Europäisches Patentamt | 2024
|Overwater construction method for photovoltaic support foundation pile
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2022
|Overwater construction method of photovoltaic support foundation pile
Europäisches Patentamt | 2023
|