Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
CONSTRUCTION PROCESS OF OFFSHORE BRIDGE HIGH-RISE PILE PLATFORM
Disclosed in the present invention is a construction process of an offshore bridge high-rise pile platform. A cofferdam of a steel-concrete structure is used for construction. The cofferdam consists of a cofferdam bottom plate prefabricated by means of reinforced concrete and a steel side formwork. The construction process comprises the following stages: a preparation stage, a cofferdam mounting stage, a cofferdam lowering stage, a cofferdam bottom plate blocking and water pumping stage, and a platform concrete pouring stage. The preparation stage comprises the following steps: pile foundation casing sinking, cast-in-place pile construction, pile foundation casing pile head trimming, cofferdam bottom plate and skirt plate prefabrication, and steel side formwork manufacturing. The cofferdam mounting stage comprises: first, mounting the cofferdam bottom plate, and then mounting the steel side formwork, wherein the cofferdam bottom plate is mounted by means of suspension hangers, and each suspension hanger comprises a pile cap, an inverted hanging beam, and two first finish-rolled twisted steel bars. The cofferdam lowering stage comprises mounting a jack lowering system on the cofferdam bottom plate, wherein the cofferdam lowering system comprises I-shaped hangers, carrying pole beams, center hole jacks, and steel strands. The construction process of the present invention can greatly reduce the construction difficulty and can improve the construction efficiency.
La présente invention concerne un procédé de construction d'une plateforme de pieu de grande hauteur pour pont en mer. Un batardeau d'une structure en acier-béton est utilisé pour la construction. Le batardeau est constitué d'une plaque inférieure de batardeau préfabriquée au moyen de béton armé et d'un coffrage latéral en acier. Le procédé de construction comprend les étapes suivantes : un étage de préparation, un étage de montage de batardeau, un étage d'abaissement de batardeau, un étage de blocage de plaque inférieure de batardeau et de pompage d'eau, et un étage de versement de béton de plateforme. L'étape de préparation comprend les étapes suivantes : l'enfoncement de tubage de fondation de pieu ; la construction de pieu coulé sur place ; le rognage de tête de pieu de tubage de fondation de pieu ; la préfabrication de plaque inférieure de batardeau et la préfabrication de plaque de jupe ; et la fabrication de coffrage latéral en acier. L'étage de montage de batardeau comprend : tout d'abord, le montage de la plaque inférieure de batardeau, puis le montage du coffrage latéral en acier. La plaque inférieure de batardeau est montée au moyen de suspentes de suspension, et chaque suspente de suspension comprend un capuchon de pieu, une poutre de suspension inversée et deux premières barres d'acier torsadées laminées de finition. L'étage d'abaissement de batardeau comprend le montage d'un système d'abaissement de vérin sur la plaque inférieure de batardeau. Ledit système d'abaissement de batardeau comprend des suspentes en forme de I, portant des poutres polaires, des vérins à trou central et des brins d'acier. Le procédé de construction de la présente invention permet de réduire considérablement la difficulté de construction et d'améliorer l'efficacité de construction.
本发明公开了一种海上桥梁高桩承台的施工工艺,采用钢混结构的套箱施工,该套箱由钢筋混凝土预制的套箱底板和钢侧模组成;施工工艺包括以下阶段:准备阶段、套箱安装阶段、套箱下放阶段、套箱底板封堵抽水阶段以及承台混凝土浇筑阶段。准备阶段包括以下步骤:桩基护筒沉设、灌注桩施工、桩基护筒桩头切平、套箱底板和裙板预制以及钢侧模制作;在套箱安装阶段,先安装套箱底板,再安装钢侧模;套箱底板采用悬吊架安装,该悬吊架包括桩帽、反吊梁和两根第一精轧螺纹钢;在套箱下放阶段,在套箱底板上安装千斤顶下放系统,该千斤顶下放系统包括工字形吊架、扁担梁、穿心千斤顶和钢绞线。本发明的施工工艺能大大降低施工难度,并能提高施工效率。
CONSTRUCTION PROCESS OF OFFSHORE BRIDGE HIGH-RISE PILE PLATFORM
Disclosed in the present invention is a construction process of an offshore bridge high-rise pile platform. A cofferdam of a steel-concrete structure is used for construction. The cofferdam consists of a cofferdam bottom plate prefabricated by means of reinforced concrete and a steel side formwork. The construction process comprises the following stages: a preparation stage, a cofferdam mounting stage, a cofferdam lowering stage, a cofferdam bottom plate blocking and water pumping stage, and a platform concrete pouring stage. The preparation stage comprises the following steps: pile foundation casing sinking, cast-in-place pile construction, pile foundation casing pile head trimming, cofferdam bottom plate and skirt plate prefabrication, and steel side formwork manufacturing. The cofferdam mounting stage comprises: first, mounting the cofferdam bottom plate, and then mounting the steel side formwork, wherein the cofferdam bottom plate is mounted by means of suspension hangers, and each suspension hanger comprises a pile cap, an inverted hanging beam, and two first finish-rolled twisted steel bars. The cofferdam lowering stage comprises mounting a jack lowering system on the cofferdam bottom plate, wherein the cofferdam lowering system comprises I-shaped hangers, carrying pole beams, center hole jacks, and steel strands. The construction process of the present invention can greatly reduce the construction difficulty and can improve the construction efficiency.
La présente invention concerne un procédé de construction d'une plateforme de pieu de grande hauteur pour pont en mer. Un batardeau d'une structure en acier-béton est utilisé pour la construction. Le batardeau est constitué d'une plaque inférieure de batardeau préfabriquée au moyen de béton armé et d'un coffrage latéral en acier. Le procédé de construction comprend les étapes suivantes : un étage de préparation, un étage de montage de batardeau, un étage d'abaissement de batardeau, un étage de blocage de plaque inférieure de batardeau et de pompage d'eau, et un étage de versement de béton de plateforme. L'étape de préparation comprend les étapes suivantes : l'enfoncement de tubage de fondation de pieu ; la construction de pieu coulé sur place ; le rognage de tête de pieu de tubage de fondation de pieu ; la préfabrication de plaque inférieure de batardeau et la préfabrication de plaque de jupe ; et la fabrication de coffrage latéral en acier. L'étage de montage de batardeau comprend : tout d'abord, le montage de la plaque inférieure de batardeau, puis le montage du coffrage latéral en acier. La plaque inférieure de batardeau est montée au moyen de suspentes de suspension, et chaque suspente de suspension comprend un capuchon de pieu, une poutre de suspension inversée et deux premières barres d'acier torsadées laminées de finition. L'étage d'abaissement de batardeau comprend le montage d'un système d'abaissement de vérin sur la plaque inférieure de batardeau. Ledit système d'abaissement de batardeau comprend des suspentes en forme de I, portant des poutres polaires, des vérins à trou central et des brins d'acier. Le procédé de construction de la présente invention permet de réduire considérablement la difficulté de construction et d'améliorer l'efficacité de construction.
本发明公开了一种海上桥梁高桩承台的施工工艺,采用钢混结构的套箱施工,该套箱由钢筋混凝土预制的套箱底板和钢侧模组成;施工工艺包括以下阶段:准备阶段、套箱安装阶段、套箱下放阶段、套箱底板封堵抽水阶段以及承台混凝土浇筑阶段。准备阶段包括以下步骤:桩基护筒沉设、灌注桩施工、桩基护筒桩头切平、套箱底板和裙板预制以及钢侧模制作;在套箱安装阶段,先安装套箱底板,再安装钢侧模;套箱底板采用悬吊架安装,该悬吊架包括桩帽、反吊梁和两根第一精轧螺纹钢;在套箱下放阶段,在套箱底板上安装千斤顶下放系统,该千斤顶下放系统包括工字形吊架、扁担梁、穿心千斤顶和钢绞线。本发明的施工工艺能大大降低施工难度,并能提高施工效率。
CONSTRUCTION PROCESS OF OFFSHORE BRIDGE HIGH-RISE PILE PLATFORM
PROCÉDÉ DE CONSTRUCTION D'UNE PLATEFORME DE PIEU DE GRANDE HAUTEUR DE POUR PONT EN MER
一种海上桥梁高桩承台的施工工艺
CEN YU (Autor:in) / CHEN CHAO (Autor:in) / GU SAIHUA (Autor:in) / XIA YUAN (Autor:in) / XIAO JIAN (Autor:in) / ZHONG JINJUN (Autor:in) / LIU ZHIHAO (Autor:in) / GONG SHUAIJIE (Autor:in) / HE XIAOJIE (Autor:in) / WANG ZECHENG (Autor:in)
23.01.2025
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction technology of offshore bridge high-rise pile cap
Europäisches Patentamt | 2023
|Offshore platform pile foundation construction method
Europäisches Patentamt | 2021
|OFFSHORE PLATFORM PILE FOUNDATION CONSTRUCTION METHOD
Europäisches Patentamt | 2023
|Offshore high-rise pile cap foundation and construction method thereof
Europäisches Patentamt | 2022
|Bridge high-pile bearing platform, bridge pile foundation structure and construction method thereof
Europäisches Patentamt | 2020
|