Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Cemented mortar consolidation deformation of shield tail void grouting, part I: Consolidation model construction
Tail void grouting is a key technology of shield tunneling to control stratum settlement. Consolidation deformation process of cemented mortar is determined by cement hydration. Based on experimental results of the influence of cementation on stress-strain relationship and permeability coefficient, the quantitative relations were established. Finally, the consolidation deformation model were derived, it can be used to truly describe the deformation of cemented mortar in tail void.
Cemented mortar consolidation deformation of shield tail void grouting, part I: Consolidation model construction
Tail void grouting is a key technology of shield tunneling to control stratum settlement. Consolidation deformation process of cemented mortar is determined by cement hydration. Based on experimental results of the influence of cementation on stress-strain relationship and permeability coefficient, the quantitative relations were established. Finally, the consolidation deformation model were derived, it can be used to truly describe the deformation of cemented mortar in tail void.
Cemented mortar consolidation deformation of shield tail void grouting, part I: Consolidation model construction
Yuan Xiaohui, (Autor:in) / Han Yuewang, (Autor:in)
01.04.2011
331767 byte
Aufsatz (Konferenz)
Elektronische Ressource
Englisch
Trans Tech Publications | 2011
|British Library Conference Proceedings | 2011
|British Library Conference Proceedings | 2010
|