Extending the life of the main cables of two major UK suspension bridges through dehumidification
The 1960s saw the construction of two major suspension bridges in the UK. With a span of 1006 m, the Forth Road Bridge was a traditional design, whereas the M48 Severn Bridge at 988 m span was a highly innovative design using a steel box deck for stiffening. After nearly 40 years of heavy use the owners of Forth Road Bridge decided to carry out an internal inspection of their cables, which revealed unexpected results of corrosion, broken wires and a loss of strength. A review of how these problems were addressed and solved around the world was undertaken and cable dehumidification was seen as the best option. Installation of the Forth dehumidification system is nearing completion and sets new standards in terms of its method of installation, efficiency, and web-based control system. An inspection of the Severn Bridge cables followed the Forth inspections and somewhat worse results were revealed, which prompted the need to urgently install a cable dehumidification system. A partial system was rapidly designed and installed on the most deteriorated sections of the main cables, followed by a full system on the remainder of the cables. The full system is now commissioned and operating.
Extending the life of the main cables of two major UK suspension bridges through dehumidification
The 1960s saw the construction of two major suspension bridges in the UK. With a span of 1006 m, the Forth Road Bridge was a traditional design, whereas the M48 Severn Bridge at 988 m span was a highly innovative design using a steel box deck for stiffening. After nearly 40 years of heavy use the owners of Forth Road Bridge decided to carry out an internal inspection of their cables, which revealed unexpected results of corrosion, broken wires and a loss of strength. A review of how these problems were addressed and solved around the world was undertaken and cable dehumidification was seen as the best option. Installation of the Forth dehumidification system is nearing completion and sets new standards in terms of its method of installation, efficiency, and web-based control system. An inspection of the Severn Bridge cables followed the Forth inspections and somewhat worse results were revealed, which prompted the need to urgently install a cable dehumidification system. A partial system was rapidly designed and installed on the most deteriorated sections of the main cables, followed by a full system on the remainder of the cables. The full system is now commissioned and operating.
Extending the life of the main cables of two major UK suspension bridges through dehumidification
Bridge Structures ; 5 ; 159-172
01.01.2009
14 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Extending the life of the main cables of two major UK suspension bridges through dehumidification
Online Contents | 2009
|Dehumidification of suspension bridge main cables
British Library Conference Proceedings | 2010
|British Library Online Contents | 2004
|Corrosion and Protection of Main Cables of Suspension Bridges
British Library Online Contents | 2007
|Corrosion Protection of the Main Cables of Suspension Bridges
British Library Conference Proceedings | 1998
|