National Program for Inspection of Non-Federal Dams. Packers Pond Dam (CT 00578), Thames River Basin, Plainfield, Connecticut. Phase 1 Inspection Report
The Packers Pond Dam, built about 1880 to provide water for industrial use, is an earth embankment impounding 450 acre-feet of water on Mill Brook. The length of the dam, including the spillway, is 325 feet. The top of the dam averages between 12-15 feet in width and is approximately 18 feet above the old streambed at the spillway discharge channel. The spillway, located at the right end of the dam, is a 64 foot long, broad-crested, stone masonry structure which provides 4.4 feet of freeboard from the crest to the top of the dam. The outlet is a concrete intake and gate structure located on the upstream slope at the left end of the dam. The gate is not functional and the size of the outlet could not be exactly determined. However, the outlet is assumed to be approximately 3 feet wide by 2.5 high. A railroad embankment runs along the downstream toe of the dam. This embankment is about 24 feet in height, with the top of the embankment approximately 12 feet higher than the top of the dam. The spillway capacity with the pond level at the top of the dam is 1700 cfs, which is 28% of the routed test flood outflow.
National Program for Inspection of Non-Federal Dams. Packers Pond Dam (CT 00578), Thames River Basin, Plainfield, Connecticut. Phase 1 Inspection Report
The Packers Pond Dam, built about 1880 to provide water for industrial use, is an earth embankment impounding 450 acre-feet of water on Mill Brook. The length of the dam, including the spillway, is 325 feet. The top of the dam averages between 12-15 feet in width and is approximately 18 feet above the old streambed at the spillway discharge channel. The spillway, located at the right end of the dam, is a 64 foot long, broad-crested, stone masonry structure which provides 4.4 feet of freeboard from the crest to the top of the dam. The outlet is a concrete intake and gate structure located on the upstream slope at the left end of the dam. The gate is not functional and the size of the outlet could not be exactly determined. However, the outlet is assumed to be approximately 3 feet wide by 2.5 high. A railroad embankment runs along the downstream toe of the dam. This embankment is about 24 feet in height, with the top of the embankment approximately 12 feet higher than the top of the dam. The spillway capacity with the pond level at the top of the dam is 1700 cfs, which is 28% of the routed test flood outflow.
National Program for Inspection of Non-Federal Dams. Packers Pond Dam (CT 00578), Thames River Basin, Plainfield, Connecticut. Phase 1 Inspection Report
1980