Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Mississippi DOT's Plan to Implement the 2002 Design Guide
Applied Research Associates, Inc. is finalizing the development of the 2002 Guide For Design of New and Rehabilitated Structures through National Cooperative Highway Research Program (NCHRP) Project 1-37A. The Mississippi DOT is implementing the design guide in two phases. An implementation plan is developed in Phase I, and actual implementation of the Design Guide occurs in Phase II.
Mississippi DOT's Plan to Implement the 2002 Design Guide
Applied Research Associates, Inc. is finalizing the development of the 2002 Guide For Design of New and Rehabilitated Structures through National Cooperative Highway Research Program (NCHRP) Project 1-37A. The Mississippi DOT is implementing the design guide in two phases. An implementation plan is developed in Phase I, and actual implementation of the Design Guide occurs in Phase II.
Mississippi DOT's Plan to Implement the 2002 Design Guide
A. Saeed (Autor:in) / J. W. Hall (Autor:in)
2003
76 pages
Report
Keine Angabe
Englisch
Transportation , Transportation & Traffic Planning , Highway Engineering , Transportation Safety , Road Transportation , Pavement design , Mississippi , Research and development , Design guidelines , Tables(Data) , Plans , Design criteria , Costs , Forensics , Road materials , Failure analysis , Flexible pavements , Empirical Methods , Factorial design , Calibration , Technology transfer , National Cooperative Highway Research Program(NCHR) , Mechanistic-empirical (ME) principles
Identifying Haz Mats: Dot's HM-181
British Library Online Contents | 1993
|Georgia DOT's Implementation of BridgeWatch
British Library Conference Proceedings | 2011
|British Library Conference Proceedings | 2000
|Speculation grows over DoT's future
Online Contents | 1994
Georgia DOT's Implementation of BridgeWatch
ASCE | 2010
|