Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Asbestos Landfill, Loring Air Force Base, Final Construction Report. Draft
The Air Force Center for Environmental Excellence (AFCEE) has retained Bechtel Environmental, Inc. (BEI), under Prime Contract No. F41624-94- 8072, as the full-service removal/remedial action contractor for Loring Air Force Base (AFB) in Limestone, Maine. Final placement of asbestos-containing materials (ACM) into the asbestos landfill and closure of the asbestos landfill was completed during the 1999 construction season by BEI and its subcontractors. This report describes activities associated with closure of the asbestos landfill.
Asbestos Landfill, Loring Air Force Base, Final Construction Report. Draft
The Air Force Center for Environmental Excellence (AFCEE) has retained Bechtel Environmental, Inc. (BEI), under Prime Contract No. F41624-94- 8072, as the full-service removal/remedial action contractor for Loring Air Force Base (AFB) in Limestone, Maine. Final placement of asbestos-containing materials (ACM) into the asbestos landfill and closure of the asbestos landfill was completed during the 1999 construction season by BEI and its subcontractors. This report describes activities associated with closure of the asbestos landfill.
Asbestos Landfill, Loring Air Force Base, Final Construction Report. Draft
1999
132 pages
Report
Keine Angabe
Englisch
Solid Wastes Pollution & Control , Logistics Military Facilities & Supplies , Waste disposal , Asbestos , Landfills , Limestone , Extraction , Air force facilities , Waste management , Site investigations , Installation restoration , Construction equipment , Maine , Consolidation tests(Soils) , Soil remediation , Loring air force base(Maine) , Landfill closures
Condition Survey, Loring Air Force Base, Maine
NTIS | 1973
|British Library Online Contents | 1998