Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Rapid Replacement of Bridge Decks
This report contains the findings of a study that was performed to evaluate existing rapid bridge-deck replacement methods and to develop better procedures and new superstructure designs for future rapid deck replacement. The report provides a comprehensive description of the research, including the details of a continuous precast prestressed stay-in-place concrete system and girder-to-deck connections that would substantially reduce bridge-deck construction and replacement time. The contents of this report will be of immediate interest to bridge and construction engineers and others involved in the design, construction, and rehabilitation of bridge structures.
Rapid Replacement of Bridge Decks
This report contains the findings of a study that was performed to evaluate existing rapid bridge-deck replacement methods and to develop better procedures and new superstructure designs for future rapid deck replacement. The report provides a comprehensive description of the research, including the details of a continuous precast prestressed stay-in-place concrete system and girder-to-deck connections that would substantially reduce bridge-deck construction and replacement time. The contents of this report will be of immediate interest to bridge and construction engineers and others involved in the design, construction, and rehabilitation of bridge structures.
Rapid Replacement of Bridge Decks
M. K. Tadros (Autor:in) / M. C. Baishysa (Autor:in)
1998
62 pages
Report
Keine Angabe
Englisch
Rapid Replacement of Four GDOT Bridge Decks
Online Contents | 2007
|Rapid Replacement of Four GDOT Bridge Decks
British Library Online Contents | 2007
|CONSTRUCTION PROCEDURES FOR RAPID REPLACEMENT OF BRIDGE DECKS
Online Contents | 1995
|