Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Natural Bridges National Monument Campground Trail Construction and Facilities Upgrade Environmental Assessment, April 2002
The National Park Service (NPS) is considering building a new trail from the campground to the visitor center, upgrading the campground amphitheater and rehabilitating the picnic area at Natural Bridges National Monument, Utah. The purpose of the overall project is 1) to reduce safety hazards for pedestrians walking between the campground and visitor center and 2) to upgrade uncomfortable, unsafe, and deteriorating equipment. The funding for these projects will come from Southeast Utah Group Fee Demonstration fund
Natural Bridges National Monument Campground Trail Construction and Facilities Upgrade Environmental Assessment, April 2002
The National Park Service (NPS) is considering building a new trail from the campground to the visitor center, upgrading the campground amphitheater and rehabilitating the picnic area at Natural Bridges National Monument, Utah. The purpose of the overall project is 1) to reduce safety hazards for pedestrians walking between the campground and visitor center and 2) to upgrade uncomfortable, unsafe, and deteriorating equipment. The funding for these projects will come from Southeast Utah Group Fee Demonstration fund
Natural Bridges National Monument Campground Trail Construction and Facilities Upgrade Environmental Assessment, April 2002
2002
36 pages
Report
Keine Angabe
Englisch
Online Contents | 1994