Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Snake River Bridge Thin Overlay. Bridge No. 12/915
The Snake River Bridge at Clarkston, Washington, Bridge No. 12/915, is the first bridge of the 14 to receive a thin overlay. The polymer concrete used is Flexogrid by Polycarb. The deck was repaired and overlaid in June of 1986. Pavement skid tests and bond tests all proved satisfactory. Ninety-one percent of the resistivity tests exceeded the minimum required by the specifications.
Snake River Bridge Thin Overlay. Bridge No. 12/915
The Snake River Bridge at Clarkston, Washington, Bridge No. 12/915, is the first bridge of the 14 to receive a thin overlay. The polymer concrete used is Flexogrid by Polycarb. The deck was repaired and overlaid in June of 1986. Pavement skid tests and bond tests all proved satisfactory. Ninety-one percent of the resistivity tests exceeded the minimum required by the specifications.
Snake River Bridge Thin Overlay. Bridge No. 12/915
T. H. Roper (Autor:in) / E. H. Henley (Autor:in)
1987
33 pages
Report
Keine Angabe
Englisch
Engineering Index Backfile | 1899
Snake River lift bridge links Washington-Idaho
Engineering Index Backfile | 1939
|