Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Pine Mountain Builders achieved HERS scores as low as 59 and electric bills as low as $50/month with extensive air sealing (blower door tests = 1.0 to 1.8 ACH 50), R-3 XPS sheathing instead of OSB, and higher efficiency heat pumps.
Pine Mountain Builders achieved HERS scores as low as 59 and electric bills as low as $50/month with extensive air sealing (blower door tests = 1.0 to 1.8 ACH 50), R-3 XPS sheathing instead of OSB, and higher efficiency heat pumps.
New Whole-House Solutions Case Study: Pine Mountain Builders
None (Autor:in)
2013
2 pages
Report
Keine Angabe
Englisch
New Whole-house Solutions Case Study: Quadrant Homes
NTIS | 2013
|Road builders start grading of Pennsylvania's $60,000,000 trans-mountain Toll Highway
Engineering Index Backfile | 1939